{"roadworks":[{"identifier":"2023-000357--vi-bs.2026-08-10_11-00-00-000.devi-zus.2024-10-01_00-00-00-000.f.de13","icon":"123","isBlocked":"false","future":false,"extent":"49.38191589297737,7.002339290843191,49.41258498396637,6.993871225155498","point":"49.38191589297737,7.002339290843191","startLcPosition":"8","impact":{"lower":"Eppelborn","upper":"Saarbrücken","symbols":["BREAKDOWN_LANE","BORDER_LEFT","CLOSED","ARROW_DOWN","SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Saarbrücken -> Trier","title":"A1 | Saarbrücken - Eppelborn","startTimestamp":"2026-08-10T11:00:00+02:00","coordinate":{"lat":49.38191589297737,"long":7.002339290843191},"description":["Zeitraum dieser Bauphase:","Beginn: 10.08.26 um 11:00 Uhr","Ende: 10.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 10.10.26)","","A1: Saarbrücken -> Trier, zwischen 3.6 km hinter AK Saarbrücken und 0.3 km vor AS Eppelborn","","Länge: 4.87 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 Arbeiten an Schutzeinrichtungen A.05226.00"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.002339291,49.381915893],[7.0025404,49.382234101],[7.0030646,49.383050301],[7.003294,49.383371301],[7.0036121,49.383786701],[7.0037842,49.384000601],[7.0041484,49.384432301],[7.0045984,49.384932201],[7.0050084,49.385358401],[7.0054214,49.385766301],[7.0066339,49.386977101],[7.0095378,49.389819301],[7.0098713,49.390177201],[7.0101051,49.390452501],[7.0103586,49.390770701],[7.0105626,49.391069301],[7.0107519,49.391389101],[7.0109066,49.391698401],[7.0110172,49.392001701],[7.0110786,49.392261701],[7.0111409,49.392570001],[7.0111539,49.393002201],[7.0111375,49.393360101],[7.0110737,49.393658101],[7.0109901,49.393934501],[7.010856,49.394260501],[7.0106656,49.394625401],[7.0104868,49.394910701],[7.01025,49.395231001],[7.0099274,49.395656401],[7.0095334,49.396160601],[7.0091473,49.396660101],[7.0088513,49.397115101],[7.0086603,49.397483901],[7.0085308,49.397798901],[7.0084038,49.398155901],[7.0083249,49.398478401],[7.0082782,49.398749201],[7.0082528,49.399073801],[7.0082528,49.399428801],[7.0082761,49.399746401],[7.0083164,49.400006101],[7.0083737,49.400285101],[7.0084756,49.400616601],[7.0086305,49.401002001],[7.0087897,49.401318301],[7.0089744,49.401629001],[7.0092121,49.401952201],[7.0094838,49.402278201],[7.00973,49.402547501],[7.0100101,49.402836201],[7.0104028,49.403210501],[7.0109949,49.403785001],[7.0113195,49.404118001],[7.011602,49.404434201],[7.0118248,49.404720001],[7.0120074,49.404997601],[7.0121326,49.405215901],[7.0122536,49.405464501],[7.0123342,49.405673001],[7.0124043,49.405910501],[7.0124701,49.406266901],[7.0125019,49.406686701],[7.012487,49.407022301],[7.0124191,49.407435201],[7.0123661,49.407657601],[7.0123024,49.407862001],[7.0122281,49.408066301],[7.0121496,49.408252801],[7.0120307,49.408524801],[7.0118885,49.408805201],[7.0116954,49.409138001],[7.0114789,49.409476301],[7.011094,49.410037601],[7.0107767,49.410461801],[7.0104204,49.410878601],[7.010123,49.411201101],[7.0096745,49.411645001],[7.0092669,49.412008801],[7.008871,49.412311101],[7.0085301,49.412534301],[7.0081396,49.412757501],[7.0076304,49.413016501],[7.0071724,49.413206101],[7.006707,49.413369101],[7.0062203,49.413510801],[7.0055318,49.413657501],[7.0050498,49.413734201],[7.0045442,49.413785401],[7.0039712,49.413820601],[7.0034307,49.413821301],[7.0028343,49.413791801],[7.0023385,49.413737901],[7.0018681,49.413672301],[7.0012617,49.413567801],[7.0000839,49.413305301],[6.9987554,49.413010501],[6.9979583,49.412861901],[6.9971447,49.412719501],[6.9965622,49.412641901],[6.9960326,49.412589801],[6.9954422,49.412557501],[6.9948881,49.412549201],[6.9941228,49.412565501],[6.993871225,49.412584984]]}},{"identifier":"2023-000357--vi-bs.2026-05-15_10-00-00-000.devi-zus.2024-10-01_00-00-00-000.f.de11","icon":"123","isBlocked":"false","future":false,"extent":"49.360892582884006,7.014729654845527,49.37578028183097,7.000565432789543","point":"49.360892582884006,7.014729654845527","startLcPosition":"8","impact":{"lower":"Illingen","upper":"Saarbrücken","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Saarbrücken -> Trier","title":"A1 | Saarbrücken - Illingen","startTimestamp":"2026-05-15T10:00:00+02:00","coordinate":{"lat":49.360892582884006,"long":7.014729654845527},"description":["Zeitraum dieser Bauphase:","Beginn: 15.05.26 um 10:00 Uhr","Ende: 09.10.26 um 17:00 Uhr","(Ende der Gesamtmaßnahme: 10.10.26)","","A1: Saarbrücken -> Trier, zwischen 0.8 km hinter AK Saarbrücken und 0.9 km vor AS Illingen","","Länge: 2.1 km | Maximale Durchfahrtsbreite: 7.5 m","","A1 Arbeiten an Schutzeinrichtungen A.05226.00"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.014729655,49.360892583],[7.0146386,49.360936401],[7.0141312,49.361178301],[7.0136141,49.361368901],[7.0129259,49.361605901],[7.0122255,49.361848201],[7.0114553,49.362093401],[7.0106388,49.362369301],[7.0099971,49.362586401],[7.0093566,49.362832001],[7.0087583,49.363075501],[7.0082021,49.363333201],[7.0077613,49.363553501],[7.0071623,49.363867701],[7.0066163,49.364189001],[7.006088,49.364516801],[7.0056293,49.364851601],[7.0052356,49.365156701],[7.0048505,49.365477901],[7.0044956,49.365799301],[7.0041859,49.366094601],[7.0038956,49.366409601],[7.0035399,49.366822301],[7.0032234,49.367207401],[7.0029386,49.367589101],[7.0026699,49.368011201],[7.0023897,49.368484501],[7.0021649,49.368932801],[7.0018616,49.369565201],[7.0016032,49.370178401],[7.0013333,49.370935801],[7.0011525,49.371492001],[7.0010007,49.372090001],[7.0009672,49.372240501],[7.0008803,49.372575201],[7.0007578,49.373202701],[7.0006716,49.373760401],[7.0006104,49.374292201],[7.0005687,49.374991101],[7.0005604,49.375523201],[7.000565433,49.375780282]]}},{"identifier":"2023-000357--vi-bs.2026-08-10_11-00-00-000.devi-zus.2024-10-01_00-00-00-000.f.de15","icon":"123","isBlocked":"false","future":false,"extent":"49.41249614631151,6.993855073238342,49.38194696363431,7.002222136724357","point":"49.41249614631151,6.993855073238342","startLcPosition":"10","impact":{"lower":"Saarbrücken","upper":"Eppelborn","symbols":["BREAKDOWN_LANE","BORDER_LEFT","CLOSED","ARROW_DOWN","SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Trier -> Saarbrücken","title":"A1 | Eppelborn - Saarbrücken","startTimestamp":"2026-08-10T11:00:00+02:00","coordinate":{"lat":49.41249614631151,"long":6.993855073238342},"description":["Zeitraum dieser Bauphase:","Beginn: 10.08.26 um 11:00 Uhr","Ende: 10.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 10.10.26)","","A1: Trier -> Saarbrücken, zwischen 0.3 km hinter AS Eppelborn und 3.6 km vor AK Saarbrücken","","Länge: 4.87 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 Arbeiten an Schutzeinrichtungen A.05226.00"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.993855073,49.412496146],[6.994109,49.412476501],[6.9948811,49.412454001],[6.9954639,49.412468201],[6.9960553,49.412496101],[6.9966026,49.412552701],[6.9972116,49.412634301],[6.9980136,49.412763401],[6.9988315,49.412923501],[7.0001733,49.413227801],[7.0013273,49.413479601],[7.0019244,49.413582301],[7.0023727,49.413648901],[7.0028581,49.413700901],[7.0034204,49.413724701],[7.0039541,49.413724701],[7.004517,49.413697001],[7.0050339,49.413638401],[7.0055034,49.413566001],[7.0061426,49.413429801],[7.0066252,49.413286601],[7.0071117,49.413115101],[7.007538,49.412939401],[7.0080449,49.412685401],[7.0084372,49.412464801],[7.0087646,49.412238401],[7.0091489,49.411950201],[7.0095525,49.411589201],[7.0100055,49.411134901],[7.0102843,49.410833001],[7.010646,49.410419701],[7.0109666,49.409986001],[7.0113469,49.409446801],[7.0115553,49.409107601],[7.0117426,49.408774001],[7.0118897,49.408486401],[7.0120169,49.408214301],[7.0120859,49.408035301],[7.0121667,49.407826801],[7.0122166,49.407632201],[7.0122718,49.407422601],[7.0123381,49.407001301],[7.0123462,49.406656001],[7.0123144,49.406264101],[7.012256,49.405917101],[7.0121833,49.405670301],[7.0121044,49.405480501],[7.0119825,49.405226701],[7.0118544,49.405014701],[7.0116674,49.404741701],[7.011451,49.404463801],[7.011183,49.404165901],[7.0108473,49.403812401],[7.010282,49.403269201],[7.0098867,49.402880501],[7.0096136,49.402604301],[7.0093633,49.402335101],[7.0090939,49.402004501],[7.0088598,49.401673001],[7.0086717,49.401355901],[7.0084991,49.401032101],[7.0083504,49.400669901],[7.0082341,49.400292401],[7.0081723,49.400020301],[7.008131,49.399760701],[7.0081045,49.399438801],[7.0081075,49.399075601],[7.0081399,49.398748001],[7.0081915,49.398463901],[7.0082709,49.398141501],[7.0083872,49.397796501],[7.0085359,49.397462801],[7.0087375,49.397086201],[7.0090299,49.396628501],[7.0094093,49.396120901],[7.0098126,49.395613201],[7.0101362,49.395191901],[7.0103665,49.394863901],[7.0105396,49.394595701],[7.0107405,49.394218401],[7.0108667,49.393901201],[7.0109447,49.393630601],[7.0109987,49.393335401],[7.0110223,49.392991601],[7.0110008,49.392562101],[7.0109448,49.392261701],[7.0108651,49.391983901],[7.0107671,49.391717801],[7.0106214,49.391408801],[7.0104332,49.391099501],[7.0102101,49.390788701],[7.0099768,49.390493501],[7.0097544,49.390233001],[7.009412,49.389869901],[7.0065228,49.387030801],[7.0053047,49.385825301],[7.0048922,49.385408501],[7.0044917,49.384982501],[7.0040282,49.384467601],[7.0036704,49.384038001],[7.0034773,49.383789401],[7.0031864,49.383405101],[7.0029557,49.383084601],[7.0024827,49.382386101],[7.0023942,49.382236701],[7.0022823,49.382047801],[7.002222137,49.381946964]]}},{"identifier":"2023-000357--vi-bs.2026-05-15_10-00-00-000.devi-zus.2024-10-01_00-00-00-000.f.de9","icon":"123","isBlocked":"false","future":false,"extent":"49.44121393226552,6.978727523006784,49.41580625337095,6.980351846932091","point":"49.44121393226552,6.978727523006784","startLcPosition":"12","impact":{"lower":"Eppelborn","upper":"Tholey","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Trier -> Saarbrücken","title":"A1 | Tholey - Eppelborn","startTimestamp":"2026-05-15T10:00:00+02:00","coordinate":{"lat":49.44121393226552,"long":6.978727523006784},"description":["Zeitraum dieser Bauphase:","Beginn: 15.05.26 um 10:00 Uhr","Ende: 09.10.26 um 17:00 Uhr","(Ende der Gesamtmaßnahme: 10.10.26)","","A1: Trier -> Saarbrücken, zwischen 2.1 km hinter AS Tholey und 0.7 km vor AS Eppelborn","","Länge: 3.25 km | Maximale Durchfahrtsbreite: 11 m","","A1 Arbeiten an Schutzeinrichtungen A.05226.00"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.978727523,49.441213932],[6.9786628,49.441107201],[6.9782344,49.440382501],[6.9779341,49.439925901],[6.9776308,49.439497001],[6.977351,49.439138001],[6.9771008,49.438827801],[6.9768225,49.438512801],[6.9764852,49.438174401],[6.9761396,49.437857501],[6.9758127,49.437588101],[6.9754483,49.437314601],[6.974959,49.436982901],[6.9742761,49.436532001],[6.9735203,49.436036501],[6.9731789,49.435787401],[6.9728999,49.435568001],[6.9726209,49.435344601],[6.9723898,49.435126601],[6.9721649,49.434895101],[6.9719296,49.434628301],[6.9717214,49.434357501],[6.9714799,49.433987901],[6.9713529,49.433749601],[6.9712446,49.433503101],[6.9711114,49.433168701],[6.9710114,49.432773301],[6.970949,49.432465901],[6.9709365,49.432135501],[6.9709427,49.431830901],[6.9709927,49.431504501],[6.9710447,49.431248601],[6.9711333,49.430957201],[6.9711775,49.430815501],[6.9714302,49.430064801],[6.9715839,49.429552501],[6.971656,49.429250901],[6.9717326,49.428913801],[6.9717797,49.428625901],[6.9718076,49.428273201],[6.9718047,49.427936201],[6.9717561,49.427525401],[6.9716939,49.427160201],[6.9716216,49.426887801],[6.9714843,49.426465301],[6.971343,49.426019001],[6.9711939,49.425520301],[6.9710932,49.425105901],[6.9710583,49.424823001],[6.9710401,49.424527101],[6.9710475,49.424285001],[6.9710612,49.424055001],[6.9711069,49.423725601],[6.971184,49.423422901],[6.9712684,49.423159701],[6.9713925,49.422865901],[6.971529,49.422609201],[6.9717265,49.422275201],[6.9719609,49.421960201],[6.972214,49.421671201],[6.9724775,49.421385101],[6.9727952,49.421097601],[6.9731157,49.420849201],[6.9736194,49.420507401],[6.9740805,49.420242401],[6.9747332,49.419884001],[6.975399,49.419506301],[6.9756334,49.419373301],[6.9759818,49.419160501],[6.9763152,49.418928001],[6.9766434,49.418707701],[6.976903,49.418499401],[6.9771488,49.418283901],[6.9782068,49.417270701],[6.9786287,49.416891301],[6.9789955,49.416595101],[6.9793747,49.416349501],[6.9797031,49.416153101],[6.9799379,49.416015401],[6.9802582,49.415852201],[6.980351847,49.415806253]]}},{"identifier":"2026-046484--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_007.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"49.658108570902485,6.922991372361914,49.68170916887956,6.908614043141642","point":"49.658108570902485,6.922991372361914","startLcPosition":"25","impact":{"lower":"Hochwald-Ost","upper":"Hermeskeil","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Saarbrücken -> Trier","title":"A1 | Hermeskeil - Hochwald-Ost","coordinate":{"lat":49.658108570902485,"long":6.922991372361914},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 18:00 Uhr","","A1: Saarbrücken -> Trier, zwischen AS Hermeskeil und 1.0 km vor Hochwald-Ost","","Länge: 2.97 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m","","A1 von Hermeskeil (AS) nach Schweich (AS) Markierungsarbeiten"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.922991372,49.658108571],[6.9228556,49.658494201],[6.9226883,49.659105401],[6.9226042,49.659517801],[6.9225493,49.659831801],[6.9224814,49.660443201],[6.9224547,49.660958301],[6.9224751,49.661813501],[6.922501,49.662209101],[6.9225314,49.662499401],[6.9225657,49.662821501],[6.9225989,49.663085201],[6.9226376,49.663407701],[6.9227161,49.663966201],[6.9228997,49.665237901],[6.9229858,49.665964601],[6.9230243,49.667068901],[6.9230068,49.667390201],[6.9229186,49.668082901],[6.9227425,49.668798301],[6.9225178,49.669404001],[6.9222218,49.670013901],[6.9220546,49.670300701],[6.9216408,49.670911301],[6.9214139,49.671208601],[6.9209434,49.671742001],[6.9206284,49.672063801],[6.9202909,49.672381001],[6.9197714,49.672831601],[6.919469,49.673073601],[6.9192877,49.673218601],[6.9188342,49.673568101],[6.9183983,49.673896701],[6.9168974,49.675004601],[6.9163163,49.675435401],[6.915203,49.676284501],[6.9145909,49.676759401],[6.9144079,49.676905801],[6.9141664,49.677089401],[6.9119991,49.678829201],[6.9109215,49.679722101],[6.9098525,49.680623801],[6.9093329,49.681086801],[6.908614043,49.681709169]]}},{"identifier":"2026-046484--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_007.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"49.68170916887956,6.908614043141642,49.71290872518976,6.894022988905685","point":"49.68170916887956,6.908614043141642","startLcPosition":"26","impact":{"lower":"Mehring","upper":"Reinsfeld","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Saarbrücken -> Trier","title":"A1 | Reinsfeld - Mehring","coordinate":{"lat":49.68170916887956,"long":6.908614043141642},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 09:00 bis 18:00 Uhr","","A1: Saarbrücken -> Trier, zwischen 0.8 km hinter AS Reinsfeld und 8.6 km vor AS Mehring","","Länge: 4 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 von Hermeskeil (AS) nach Schweich (AS) Markierungsarbeiten"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.908614043,49.681709169],[6.9079488,49.682285101],[6.9060101,49.684041501],[6.9051661,49.684781501],[6.9041094,49.685687701],[6.9040012,49.685780001],[6.9027511,49.686836701],[6.9011998,49.688094401],[6.9002271,49.688866801],[6.8992752,49.689605601],[6.898783,49.689983901],[6.8982906,49.690354101],[6.8972931,49.691100401],[6.8966138,49.691601501],[6.8959217,49.692096801],[6.8945393,49.693087901],[6.8940804,49.693419801],[6.8936003,49.693779901],[6.8932618,49.694039301],[6.8928492,49.694362401],[6.8924839,49.694656101],[6.8919763,49.695095001],[6.8915042,49.695536601],[6.8912172,49.695824601],[6.8909088,49.696155101],[6.8906647,49.696431801],[6.8903885,49.696794201],[6.8902332,49.697022601],[6.8900049,49.697330501],[6.8898882,49.697532601],[6.8897581,49.697761601],[6.8895503,49.698179801],[6.8894188,49.698492001],[6.8893035,49.698813001],[6.8891962,49.699156501],[6.8891157,49.699487801],[6.889038,49.699930201],[6.8890031,49.700281501],[6.8889856,49.700576501],[6.8889897,49.700971101],[6.8890178,49.701359701],[6.8890594,49.701691001],[6.8891238,49.702071801],[6.8892244,49.702499401],[6.8893665,49.702980801],[6.8895221,49.703408401],[6.8896588,49.703749401],[6.8898279,49.704155201],[6.8900451,49.704620101],[6.8902637,49.705048601],[6.8904957,49.705480501],[6.8907894,49.705996501],[6.8910687,49.706498601],[6.8911583,49.706649501],[6.8914198,49.707081501],[6.8917792,49.707668701],[6.8921319,49.708285301],[6.8924792,49.708888101],[6.8929312,49.709718001],[6.89319,49.710248801],[6.8933804,49.710688401],[6.8936058,49.711271201],[6.893756,49.711712601],[6.8938834,49.712174801],[6.8939638,49.712540801],[6.894022989,49.712908725]]}},{"identifier":"2026-046484--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_007.de5","icon":"warnkegel","isBlocked":"false","future":true,"extent":"49.71290872518976,6.894022988905685,49.74382611339876,6.875441582595163","point":"49.71290872518976,6.894022988905685","startLcPosition":"28","impact":{"lower":"Mehring","upper":"Hochwald-West","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Saarbrücken -> Trier","title":"A1 | Hochwald-West - Mehring","coordinate":{"lat":49.71290872518976,"long":6.894022988905685},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 von 09:00 bis 18:00 Uhr","","A1: Saarbrücken -> Trier, zwischen 2.4 km hinter Hochwald-West und 4.7 km vor AS Mehring","","Länge: 3.91 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m","","A1 von Hermeskeil (AS) nach Schweich (AS) Markierungsarbeiten"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.894022989,49.712908725],[6.8940309,49.712957901],[6.8940698,49.713345501],[6.8940899,49.713731401],[6.8940845,49.714139901],[6.894055,49.714642801],[6.8940202,49.714978401],[6.8939652,49.715315701],[6.8938887,49.715666001],[6.8938016,49.716001601],[6.8936594,49.716450801],[6.8935226,49.716797601],[6.8933429,49.717221701],[6.8931739,49.717566801],[6.8929553,49.717956101],[6.8927059,49.718374001],[6.8924859,49.718703501],[6.8921279,49.719213401],[6.8917839,49.719678901],[6.8917018,49.719787801],[6.8916133,49.719909701],[6.8906668,49.721159401],[6.8901498,49.721880601],[6.8898674,49.722307701],[6.889555,49.722815701],[6.8893559,49.723200901],[6.8891949,49.723530501],[6.8891253,49.723688301],[6.8889941,49.724037801],[6.8888546,49.724461301],[6.8887728,49.724770001],[6.8887054,49.725130001],[6.888667,49.725429201],[6.8886378,49.725827901],[6.8886339,49.726177801],[6.8886511,49.726507501],[6.888691,49.726925101],[6.888711,49.727055801],[6.8887548,49.727341701],[6.8888495,49.727819601],[6.8889902,49.728465001],[6.888998,49.728502401],[6.8891272,49.729119501],[6.8891863,49.729420501],[6.8892911,49.729954901],[6.8893478,49.730289201],[6.8893897,49.730600401],[6.8894181,49.730886101],[6.8894559,49.731387401],[6.889464,49.731744401],[6.8894531,49.732041601],[6.8894233,49.732383801],[6.8893843,49.732694001],[6.8893092,49.733066201],[6.8892294,49.733387301],[6.8891547,49.733649001],[6.889009,49.734035601],[6.888879,49.734341001],[6.888766,49.734585101],[6.8885348,49.735002301],[6.8882689,49.735424901],[6.8880495,49.735732401],[6.8877239,49.736136601],[6.8875011,49.736387501],[6.8871972,49.736690801],[6.8868428,49.737032701],[6.8864674,49.737361401],[6.8860785,49.737667301],[6.8857495,49.737905401],[6.885404,49.738139201],[6.8850795,49.738348901],[6.8846117,49.738628501],[6.8840695,49.738928201],[6.8837225,49.739110201],[6.8833192,49.739319801],[6.883248,49.739354501],[6.8824919,49.739723101],[6.8813849,49.740259201],[6.8800852,49.740861501],[6.8791361,49.741333601],[6.8786892,49.741575101],[6.8777806,49.742086401],[6.8773786,49.742335801],[6.8769684,49.742600101],[6.8767285,49.742769601],[6.876318,49.743073601],[6.8760213,49.743302001],[6.8757208,49.743567801],[6.8754441,49.743823801],[6.875441583,49.743826113]]}},{"identifier":"2024-004256--vi-bs.2024-01-31_07-00-00-000.devi-zus.2024-01-31_07-00-00-000_018.f.de1","icon":"123","isBlocked":"false","future":false,"extent":"49.73929515761287,6.883366617566736,49.78257619024187,6.8320929622769375","point":"49.73929515761287,6.883366617566736","startLcPosition":"28","impact":{"lower":"Mehringer Höhe","upper":"Hochwald-West","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Saarbrücken -> Trier","title":"A1 | Hochwald-West - Mehringer Höhe","startTimestamp":"2024-01-31T07:00:00+01:00","coordinate":{"lat":49.73929515761287,"long":6.883366617566736},"description":["Zeitraum dieser Bauphase:","Beginn: 31.01.24 um 07:00 Uhr","Ende: 28.02.27 um 07:00 Uhr","(Ende der Gesamtmaßnahme: 28.02.27)","","A1: Saarbrücken -> Trier, zwischen 5.6 km hinter Hochwald-West und 0.8 km vor Mehringer Höhe","","Länge: 6.42 km | Maximale Durchfahrtsbreite: 7.5 m","","Stauwarnanlage A1 Baustelle Fellertalbrücke Fahrtrichtung Koblenz"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.883366618,49.739295158],[6.8833192,49.739319801],[6.883248,49.739354501],[6.8824919,49.739723101],[6.8813849,49.740259201],[6.8800852,49.740861501],[6.8791361,49.741333601],[6.8786892,49.741575101],[6.8777806,49.742086401],[6.8773786,49.742335801],[6.8769684,49.742600101],[6.8767285,49.742769601],[6.876318,49.743073601],[6.8760213,49.743302001],[6.8757208,49.743567801],[6.8754441,49.743823801],[6.8752181,49.744031401],[6.8750899,49.744172201],[6.8748486,49.744439201],[6.8746358,49.744704801],[6.874479,49.744916001],[6.8743067,49.745154101],[6.8740186,49.745604501],[6.8739063,49.745803601],[6.8737605,49.746083501],[6.8736413,49.746333601],[6.8735367,49.746579001],[6.8733743,49.747012601],[6.873198,49.747540601],[6.8730753,49.747945901],[6.8728932,49.748603101],[6.8727216,49.749252101],[6.8725387,49.749916801],[6.8722976,49.750677501],[6.872166,49.751029801],[6.8720038,49.751401901],[6.8718509,49.751730601],[6.8716224,49.752163001],[6.8713613,49.752614001],[6.8710407,49.753100001],[6.8707349,49.753520501],[6.8704844,49.753833601],[6.8702787,49.754078401],[6.8700838,49.754297401],[6.8698373,49.754561301],[6.8692709,49.755129401],[6.8689874,49.755391501],[6.8686496,49.755686501],[6.8682109,49.756053401],[6.867786,49.756402801],[6.8671446,49.756892101],[6.8667102,49.757211801],[6.8663212,49.757496101],[6.865894,49.757795601],[6.8644523,49.758776401],[6.8629933,49.759752701],[6.862086,49.760372501],[6.8615887,49.760728301],[6.8606682,49.761403501],[6.8599802,49.761941501],[6.85937,49.762455201],[6.8589436,49.762829501],[6.8584219,49.763326701],[6.8579257,49.763846501],[6.8574904,49.764342901],[6.8572457,49.764654201],[6.8570452,49.764913301],[6.8568045,49.765270601],[6.8565845,49.765608401],[6.8563566,49.765996501],[6.8561822,49.766306601],[6.8560374,49.766604601],[6.8559301,49.766848901],[6.8558335,49.767124301],[6.8557048,49.767521001],[6.8555465,49.768025201],[6.8554352,49.768416701],[6.8553051,49.769017801],[6.8551965,49.769511501],[6.8551364,49.769853701],[6.8548621,49.771155901],[6.8547001,49.771728101],[6.8546081,49.772028701],[6.8545015,49.772334001],[6.8544076,49.772544501],[6.8542581,49.772841201],[6.8540497,49.773218701],[6.8538587,49.773539401],[6.853638,49.773850801],[6.8534561,49.774096301],[6.85323,49.774378701],[6.85293,49.774716801],[6.852624,49.775023401],[6.8522457,49.775384101],[6.8517384,49.775821501],[6.851389,49.776085001],[6.8510055,49.776360001],[6.8506442,49.776585401],[6.8502494,49.776818401],[6.849835,49.777048301],[6.8494122,49.777265901],[6.8489827,49.777464801],[6.848348,49.777739201],[6.8480799,49.777844601],[6.8478317,49.777934401],[6.847436,49.778074401],[6.8471154,49.778177301],[6.846552,49.778349601],[6.846132,49.778463501],[6.8454402,49.778637001],[6.8450685,49.778728601],[6.8449665,49.778753901],[6.8444267,49.778876401],[6.842967,49.779241101],[6.8419295,49.779510201],[6.8402296,49.779977601],[6.8392119,49.780282101],[6.838335,49.780546701],[6.8364565,49.781155701],[6.8351939,49.781583601],[6.8333702,49.782189601],[6.832537,49.782445101],[6.832092962,49.78257619]]}},{"identifier":"2026-046498--vi-bs.2026-09-14_08-00-00-000.devi-bs.2026-09-14_08-00-00-000_010.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"49.77701552501748,6.849563970307254,49.7757552736869,6.8515515357992465","point":"49.77701552501748,6.849563970307254","startLcPosition":"29","impact":{"lower":"Hochwald-West","upper":"Mehring","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Trier -> Saarbrücken","title":"A1 | Mehring - Hochwald-West","coordinate":{"lat":49.77701552501748,"long":6.849563970307254},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 08:00 bis 10:00 Uhr","","A1: Trier -> Saarbrücken, zwischen 0.4 km hinter AS Mehring und 10.4 km vor Hochwald-West","","Länge: 0.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m","","A1 zwischen Schweich (AS) und Reinsfeld (AS) Arbeiten an Schutzeinrichtungen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.84956397,49.777015525],[6.849702,49.776944501],[6.850111,49.776717501],[6.8505013,49.776487201],[6.8508553,49.776266301],[6.8512322,49.775996101],[6.851551536,49.775755274]]}},{"identifier":"2026-046498--vi-bs.2026-09-14_08-00-00-000.devi-bs.2026-09-14_08-00-00-000_010.de5","icon":"warnkegel","isBlocked":"false","future":true,"extent":"49.71732967526481,6.893107828526869,49.715579430092305,6.893732259914968","point":"49.71732967526481,6.893107828526869","startLcPosition":"29","impact":{"lower":"Hochwald-West","upper":"Mehring","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Trier -> Saarbrücken","title":"A1 | Mehring - Hochwald-West","coordinate":{"lat":49.71732967526481,"long":6.893107828526869},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 12:00 bis 14:00 Uhr","","A1: Trier -> Saarbrücken, zwischen 8.1 km hinter AS Mehring und 2.7 km vor Hochwald-West","","Länge: 0.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.75 m","","A1 zwischen Schweich (AS) und Reinsfeld (AS) Arbeiten an Schutzeinrichtungen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.893107829,49.717329675],[6.8931763,49.717189901],[6.8933547,49.716768901],[6.8934901,49.716425601],[6.8936308,49.715981101],[6.8937171,49.715648901],[6.89373226,49.71557943]]}},{"identifier":"2026-046498--vi-bs.2026-09-14_08-00-00-000.devi-bs.2026-09-14_08-00-00-000_010.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"49.76556124211042,6.85642505648062,49.763945441828135,6.857625820641289","point":"49.76556124211042,6.85642505648062","startLcPosition":"29","impact":{"lower":"Hochwald-West","upper":"Mehring","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Trier -> Saarbrücken","title":"A1 | Mehring - Hochwald-West","coordinate":{"lat":49.76556124211042,"long":6.85642505648062},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 13:00 Uhr","","A1: Trier -> Saarbrücken, zwischen 1.8 km hinter AS Mehring und 9.0 km vor Hochwald-West","","Länge: 0.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.6 m","","A1 zwischen Schweich (AS) und Reinsfeld (AS) Arbeiten an Schutzeinrichtungen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.856425056,49.765561242],[6.8566369,49.765235901],[6.8568876,49.764872101],[6.8570928,49.764600901],[6.8573396,49.764286501],[6.857625821,49.763945442]]}},{"identifier":"2024-004156--vi-bs.2026-02-25_08-00-00-000.devi-zus.2024-02-13_00-00-00-000_004.f.de49","icon":"123","isBlocked":"false","future":false,"extent":"49.783913639500064,6.826200778045879,49.784365509156366,6.81377467382722","point":"49.783913639500064,6.826200778045879","startLcPosition":"29","impact":{"lower":"Moseltal","upper":"Mehring","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Saarbrücken -> Köln/Koblenz","title":"A1 | Mehring - Moseltal","startTimestamp":"2026-02-25T08:00:00+01:00","coordinate":{"lat":49.783913639500064,"long":6.826200778045879},"description":["Zeitraum dieser Bauphase:","Beginn: 25.02.26 um 08:00 Uhr","Ende: 01.09.27 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.09.27)","","A1: Saarbrücken -> Köln/Koblenz, zwischen 1.4 km hinter AS Mehring und 5.8 km vor AD Moseltal","","Länge: 0.9 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4.75 m","","A1 Brückeninstandsetzung Fellertalbrücke"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.826200778,49.78391364],[6.8257631,49.783982001],[6.8250532,49.784079901],[6.8241337,49.784198601],[6.8238295,49.784235901],[6.8229763,49.784322501],[6.8220883,49.784398301],[6.8213679,49.784456101],[6.8200018,49.784516501],[6.8187629,49.784541401],[6.8170741,49.784542601],[6.8168511,49.784538101],[6.8163245,49.784519001],[6.8155608,49.784484601],[6.8147915,49.784435801],[6.813774674,49.784365509]]}},{"identifier":"2026-046484--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_007.de7","icon":"warnkegel","isBlocked":"false","future":true,"extent":"49.80716492544129,6.7587853184948194,49.836534122382645,6.768427726449143","point":"49.80716492544129,6.7587853184948194","startLcPosition":"31","impact":{"lower":"Föhren","upper":"Rioler Wald","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Saarbrücken -> Köln/Koblenz","title":"A1 | Rioler Wald - Föhren","coordinate":{"lat":49.80716492544129,"long":6.7587853184948194},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","17.09.26 von 09:00 bis 18:00 Uhr","","A1: Saarbrücken -> Köln/Koblenz, zwischen 5.6 km hinter Rioler Wald und 3.2 km vor AS Föhren","","Länge: 3.48 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m","","A1 von Hermeskeil (AS) nach Schweich (AS) Markierungsarbeiten"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.758785318,49.807164925],[6.7587148,49.807455101],[6.7584477,49.808493101],[6.7583458,49.808960901],[6.7582971,49.809221401],[6.7581126,49.810318701],[6.7579895,49.811412901],[6.7579354,49.812121101],[6.7579157,49.812747301],[6.7579058,49.813204401],[6.7578928,49.813697501],[6.7579436,49.815024201],[6.7579731,49.815412501],[6.7580128,49.815818101],[6.7581428,49.816956601],[6.7582548,49.817588801],[6.7583671,49.818207201],[6.7585613,49.819155301],[6.7587954,49.820446401],[6.7589135,49.821053401],[6.7593421,49.823281201],[6.759566,49.824430801],[6.7597506,49.825354401],[6.7599753,49.826528601],[6.760087,49.827053801],[6.7602161,49.827677501],[6.7603669,49.828306401],[6.7604746,49.828676601],[6.7606997,49.829275601],[6.760854,49.829631801],[6.7610904,49.830099001],[6.7613911,49.830632301],[6.7617352,49.831154001],[6.7619698,49.831483101],[6.7623304,49.831950901],[6.7626459,49.832313601],[6.7629634,49.832656201],[6.7632857,49.832977501],[6.7634519,49.833135601],[6.7636181,49.833293701],[6.7637444,49.833396001],[6.764052,49.833645401],[6.7650543,49.834421701],[6.7655746,49.834774201],[6.7658453,49.834968301],[6.7660185,49.835084701],[6.7667804,49.835573801],[6.7675219,49.836009801],[6.768427726,49.836534122]]}},{"identifier":"2024-004156--vi-bs.2026-02-25_08-00-00-000.devi-zus.2024-02-13_00-00-00-000_004.f.de51","icon":"123","isBlocked":"false","future":false,"extent":"49.784365509156366,6.81377467382722,49.802987967689575,6.761338374370144","point":"49.784365509156366,6.81377467382722","startLcPosition":"31","impact":{"lower":"Moseltal","upper":"Rioler Wald","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Saarbrücken -> Köln/Koblenz","title":"A1 | Rioler Wald - Moseltal","startTimestamp":"2026-02-25T08:00:00+01:00","coordinate":{"lat":49.784365509156366,"long":6.81377467382722},"description":["Zeitraum dieser Bauphase:","Beginn: 25.02.26 um 08:00 Uhr","Ende: 01.09.27 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.09.27)","","A1: Saarbrücken -> Köln/Koblenz, zwischen 0.1 km hinter Rioler Wald und 0.8 km vor AD Moseltal","","Länge: 4.93 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4.75 m","","A1 Brückeninstandsetzung Fellertalbrücke"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.813774674,49.784365509],[6.8135923,49.784352901],[6.8116245,49.784170101],[6.8077938,49.783793401],[6.8026528,49.783264201],[6.8023172,49.783230401],[6.798098,49.782806101],[6.7957142,49.782573901],[6.7952641,49.782535301],[6.7947659,49.782498101],[6.7941287,49.782461601],[6.7935035,49.782439201],[6.7929028,49.782433301],[6.792359,49.782440501],[6.791715,49.782470401],[6.7911739,49.782504401],[6.7906317,49.782559701],[6.7900616,49.782625101],[6.7895516,49.782697301],[6.7890465,49.782790801],[6.788585,49.782885901],[6.7876359,49.783119001],[6.787154,49.783249101],[6.7865703,49.783438401],[6.7860184,49.783640201],[6.7856421,49.783780401],[6.7851406,49.783988801],[6.7843835,49.784355601],[6.7837952,49.784675901],[6.7832804,49.784990501],[6.7827496,49.785326601],[6.7823399,49.785645401],[6.7819193,49.785994901],[6.7814112,49.786452701],[6.7810747,49.786812001],[6.7805376,49.787464301],[6.7802152,49.787916301],[6.7799129,49.788407801],[6.7797175,49.788791201],[6.7795221,49.789174601],[6.7793947,49.789448001],[6.7791692,49.789931701],[6.7787777,49.790764101],[6.7782828,49.791777101],[6.7779561,49.792423901],[6.7776612,49.792929601],[6.7772591,49.793535101],[6.7769462,49.793934901],[6.7765369,49.794437701],[6.7760054,49.794997901],[6.7756094,49.795368801],[6.775201,49.795747601],[6.774881,49.796012201],[6.7747686,49.796103801],[6.7745164,49.796309601],[6.7739776,49.796713501],[6.7731891,49.797236801],[6.772229,49.797776401],[6.7718439,49.797962301],[6.7714198,49.798152801],[6.7708038,49.798422201],[6.7701235,49.798707101],[6.7693324,49.799016201],[6.7677289,49.799616501],[6.7665858,49.800048201],[6.765943,49.800295401],[6.7651206,49.800644901],[6.7644714,49.800935301],[6.764041,49.801145801],[6.7636198,49.801366301],[6.7629195,49.801782901],[6.762265,49.802234101],[6.7618427,49.802555401],[6.761338374,49.802987968]]}},{"identifier":"2024-038925--vi-bs.2026-06-26_00-00-00-000.devi-zus.2025-06-01_00-00-00-000.f_001.de36","icon":"123","isBlocked":"false","future":false,"extent":"49.81620138884776,6.7580565652642015,49.82000271313123,6.758714950003284","point":"49.81620138884776,6.7580565652642015","startLcPosition":"32","impact":{"lower":"Schweich","upper":"Moseltal","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Trier -> Köln/Koblenz","title":"A1 | Moseltal - Schweich","startTimestamp":"2026-06-26T00:00:00+02:00","coordinate":{"lat":49.81620138884776,"long":6.7580565652642015},"description":["Zeitraum dieser Bauphase:","Beginn: 26.06.26 um 00:00 Uhr","Ende: 01.03.27 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.12.29)","","A1: Trier -> Köln/Koblenz, zwischen 0.7 km hinter AD Moseltal und 1.8 km vor AS Schweich","","Länge: 0.43 km | Max. 100 km/h | Maximale Durchfahrtsbreite: 7.5 m","","A1 Brückeninstandsetzung Moselbrücke Schweich"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.758056565,49.816201389],[6.7581428,49.816956601],[6.7582548,49.817588801],[6.7583671,49.818207201],[6.7585613,49.819155301],[6.75871495,49.820002713]]}},{"identifier":"2024-004156--vi-bs.2026-02-25_08-00-00-000.devi-zus.2024-02-13_00-00-00-000_004.f.de47","icon":"123","isBlocked":"false","future":false,"extent":"49.80287870310539,6.761208206058875,49.789253151384735,6.779274628145091","point":"49.80287870310539,6.761208206058875","startLcPosition":"32","impact":{"lower":"Rioler Wald","upper":"Moseltal","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Köln/Koblenz -> Saarbrücken","title":"A1 | Moseltal - Rioler Wald","startTimestamp":"2026-02-25T08:00:00+01:00","coordinate":{"lat":49.80287870310539,"long":6.761208206058875},"description":["Zeitraum dieser Bauphase:","Beginn: 25.02.26 um 08:00 Uhr","Ende: 01.09.27 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.09.27)","","A1: Köln/Koblenz -> Saarbrücken, zwischen 0.8 km hinter AD Moseltal und 3.0 km vor Rioler Wald","","Länge: 2.08 km | Maximale Durchfahrtsbreite: 6.35 m","","A1 Brückeninstandsetzung Fellertalbrücke"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.761208206,49.802878703],[6.7617298,49.802437501],[6.7622216,49.802067301],[6.7627113,49.801736301],[6.7632507,49.801405001],[6.7636287,49.801192201],[6.7641898,49.800909201],[6.7650833,49.800496601],[6.7662063,49.800038401],[6.7677043,49.799477701],[6.7685673,49.799152701],[6.7692531,49.798894401],[6.7700028,49.798601201],[6.7707762,49.798278901],[6.7710096,49.798175901],[6.771611,49.797910501],[6.7722223,49.797612201],[6.7730573,49.797141301],[6.7735811,49.796798301],[6.7740213,49.796476201],[6.774472,49.796144401],[6.7748452,49.795845101],[6.7753075,49.795447101],[6.7757888,49.794970001],[6.7761445,49.794602801],[6.7764353,49.794287101],[6.77672,49.793927501],[6.7769974,49.793579101],[6.7772993,49.793131901],[6.7775922,49.792650501],[6.7778659,49.792177101],[6.7785991,49.790731301],[6.7789934,49.789858401],[6.779274628,49.789253151]]}},{"identifier":"2026-046498--vi-bs.2026-09-14_08-00-00-000.devi-bs.2026-09-14_08-00-00-000_010.de7","icon":"warnkegel","isBlocked":"false","future":true,"extent":"49.831403899977495,6.761913341015864,49.832963012320725,6.763271166170182","point":"49.831403899977495,6.761913341015864","startLcPosition":"32","impact":{"lower":"Schweich","upper":"Moseltal","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Trier -> Köln/Koblenz","title":"A1 | Moseltal - Schweich","coordinate":{"lat":49.831403899977495,"long":6.761913341015864},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 13:00 bis 17:00 Uhr","","A1: Trier -> Köln/Koblenz, zwischen 2.4 km hinter AD Moseltal und 0.3 km vor AS Schweich","","Länge: 0.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.75 m","","A1 zwischen Schweich (AS) und Reinsfeld (AS) Arbeiten an Schutzeinrichtungen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.761913341,49.8314039],[6.7619698,49.831483101],[6.7623304,49.831950901],[6.7626459,49.832313601],[6.7629634,49.832656201],[6.763271166,49.832963012]]}},{"identifier":"2024-004156--vi-bs.2025-02-25_08-00-00-000.devi-zus.2024-02-13_00-00-00-000_004.f.de45","icon":"123","isBlocked":"false","future":false,"extent":"49.80973631943415,6.757998657651483,49.80287870310539,6.761208206058875","point":"49.80973631943415,6.757998657651483","startLcPosition":"32","impact":{"lower":"Rioler Wald","upper":"Moseltal","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Köln/Koblenz -> Saarbrücken","title":"A1 | Moseltal - Rioler Wald","startTimestamp":"2025-02-25T08:00:00+01:00","coordinate":{"lat":49.80973631943415,"long":6.757998657651483},"description":["Zeitraum dieser Bauphase:","Beginn: 25.02.25 um 08:00 Uhr","Ende: 01.09.27 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.09.27)","","A1: Köln/Koblenz -> Saarbrücken, zwischen AD Moseltal und 5.1 km vor Rioler Wald","","Länge: 0.8 km | Maximale Durchfahrtsbreite: 7.5 m","","A1 Brückeninstandsetzung Fellertalbrücke"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.757998658,49.809736319],[6.7580643,49.809346001],[6.7582742,49.808405201],[6.7584947,49.807523601],[6.7586835,49.806893401],[6.758797,49.806536301],[6.7589421,49.806143401],[6.7591399,49.805662301],[6.7593385,49.805256901],[6.7595985,49.804775401],[6.7598883,49.804339601],[6.7602449,49.803888901],[6.7604917,49.803602401],[6.7608216,49.803251001],[6.7611569,49.802922101],[6.761208206,49.802878703]]}},{"identifier":"2024-038925--vi-bs.2026-06-26_00-00-00-000.devi-zus.2025-06-01_00-00-00-000.f_001.de34","icon":"123","isBlocked":"false","future":false,"extent":"49.82001806489952,6.758526258078319,49.81621062724484,6.757864877451185","point":"49.82001806489952,6.758526258078319","startLcPosition":"33","impact":{"lower":"Moseltal","upper":"Schweich","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Köln/Koblenz -> Trier","title":"A1 | Schweich - Moseltal","startTimestamp":"2026-06-26T00:00:00+02:00","coordinate":{"lat":49.82001806489952,"long":6.758526258078319},"description":["Zeitraum dieser Bauphase:","Beginn: 26.06.26 um 00:00 Uhr","Ende: 01.03.27 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.12.29)","","A1: Köln/Koblenz -> Trier, zwischen 1.8 km hinter AS Schweich und 0.7 km vor AD Moseltal","","Länge: 0.43 km | Max. 100 km/h | Maximale Durchfahrtsbreite: 7.5 m","","A1 Brückeninstandsetzung Moselbrücke Schweich"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.758526258,49.820018065],[6.7583589,49.819204101],[6.7581835,49.818254401],[6.7580136,49.817278401],[6.7579026,49.816529501],[6.757864877,49.816210627]]}},{"identifier":"2026-045911--vi-bs.2026-09-16_07-00-00-000.devi-zus.2026-09-14_07-00-00-000_002.de6","icon":"warnkegel","isBlocked":"false","future":true,"extent":"50.00917179394379,6.933455725595512,50.00146592338821,6.9296358645364045","point":"50.00917179394379,6.933455725595512","startLcPosition":"43","impact":{"lower":"Flussbach","upper":"Lüxem","symbols":["SEPARATE","CLOSED","CLOSED","BORDER_RIGHT","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Köln/Koblenz -> Trier","title":"A1 | Lüxem - Flussbach","coordinate":{"lat":50.00917179394379,"long":6.933455725595512},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 von 07:00 bis 16:00 Uhr","","A1: Köln/Koblenz -> Trier, zwischen 3.4 km hinter Lüxem und 1.0 km vor Flussbach","","Länge: 0.9 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 von Mehren (AS) Fahrbahninstandsetzung"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.933455726,50.009171794],[6.9332412,50.008845401],[6.9328263,50.008197501],[6.9324565,50.007588901],[6.9319841,50.006758201],[6.9314886,50.005796301],[6.9311044,50.004991201],[6.9305729,50.003749301],[6.9305374,50.003656401],[6.929635865,50.001465923]]}},{"identifier":"2026-045911--vi-bs.2026-09-15_07-00-00-000.devi-zus.2026-09-14_07-00-00-000_002.de4","icon":"warnkegel","isBlocked":"false","future":true,"extent":"50.144336003801186,6.87414707187983,50.14151045124947,6.870712744776382","point":"50.144336003801186,6.87414707187983","startLcPosition":"49","impact":{"lower":"Udler","upper":"Mehren","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Köln/Koblenz -> Trier","title":"A1 | Mehren - Udler","coordinate":{"lat":50.144336003801186,"long":6.87414707187983},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 07:00 bis 16:00 Uhr","","A1: Köln/Koblenz -> Trier, zwischen 2.9 km hinter AS Mehren und 0.3 km vor Udler","","Länge: 0.4 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.75 m","","A1 von Mehren (AS) Fahrbahninstandsetzung"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.874147072,50.144336004],[6.8740776,50.144267801],[6.8734677,50.143674201],[6.8730707,50.143302201],[6.8726579,50.142939501],[6.8724909,50.142799701],[6.8722815,50.142629401],[6.8719948,50.142404601],[6.8716574,50.142150901],[6.870869,50.141606401],[6.870712745,50.141510451]]}},{"identifier":"2026-045911--vi-bs.2026-09-14_07-00-00-000.devi-zus.2026-09-14_07-00-00-000_002.de2","icon":"warnkegel","isBlocked":"false","future":true,"extent":"50.15371687280893,6.881983583409705,50.1477052308995,6.8775826888544795","point":"50.15371687280893,6.881983583409705","startLcPosition":"49","impact":{"lower":"Udler","upper":"Mehren","symbols":["SEPARATE","CLOSED","CLOSED","BORDER_RIGHT","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Köln/Koblenz -> Trier","title":"A1 | Mehren - Udler","coordinate":{"lat":50.15371687280893,"long":6.881983583409705},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 07:00 bis 16:00 Uhr","","A1: Köln/Koblenz -> Trier, zwischen 1.7 km hinter AS Mehren und 1.1 km vor Udler","","Länge: 0.75 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 von Mehren (AS) Fahrbahninstandsetzung"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.881983583,50.153716873],[6.8819765,50.153677501],[6.8819041,50.153373001],[6.881801,50.152998701],[6.8816517,50.152613201],[6.8815006,50.152238601],[6.881426,50.152080501],[6.8812512,50.151751301],[6.8810626,50.151445601],[6.880849,50.151140001],[6.8806395,50.150845501],[6.8803784,50.150527501],[6.8800209,50.150124301],[6.8796558,50.149747701],[6.8782416,50.148355501],[6.8779993,50.148113401],[6.877582689,50.147705231]]}},{"identifier":"2024-032543--vi-bs.2026-03-26_05-00-00-000.devi-zus.2025-04-14_09-00-00-000_024.de26","icon":"123","isBlocked":"false","future":false,"extent":"50.765669506600034,6.821407106981651,50.77022971914642,6.822393221214119","point":"50.765669506600034,6.821407106981651","startLcPosition":"63","impact":{"lower":"Bliesheim","upper":"Weilerswist-West","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Euskirchen -> Köln","title":"A1 | Weilerswist-West - Bliesheim","startTimestamp":"2026-03-26T05:00:00+01:00","coordinate":{"lat":50.765669506600034,"long":6.821407106981651},"description":["Zeitraum dieser Bauphase:","Beginn: 26.03.26 um 05:00 Uhr","Ende: 30.09.26 um 15:00 Uhr","(Ende der Gesamtmaßnahme: 30.09.26)","","A1: Euskirchen -> Köln, zwischen 1.6 km hinter AS Weilerswist-West und 0.1 km vor AK Bliesheim","","Länge: 0.51 km | Maximale Durchfahrtsbreite: 3.75 m","","BW AK Bliesheim (BW 21)"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.821407107,50.765669507],[6.8215093,50.765893901],[6.8217211,50.766407401],[6.821904,50.766921101],[6.8220789,50.767535901],[6.8222078,50.768102201],[6.822318,50.768821101],[6.822343,50.769037601],[6.8223973,50.769527201],[6.8224118,50.770023001],[6.8223937,50.770226001],[6.822393221,50.770229719]]}},{"identifier":"2023-000045--vi-bs.2026-07-06_05-00-00-000.devi-zus.2024-03-23_09-00-00-000_001.f.de97","icon":"123","isBlocked":"false","future":false,"extent":"50.78604878905557,6.8078787931472515,50.77586330139321,6.8159161178381025","point":"50.78604878905557,6.8078787931472515","startLcPosition":"65","impact":{"lower":"Bliesheim","upper":"Erftstadt","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Köln -> Euskirchen","title":"A1 | Erftstadt - Bliesheim","startTimestamp":"2026-07-06T05:00:00+02:00","coordinate":{"lat":50.78604878905557,"long":6.8078787931472515},"description":["Zeitraum dieser Bauphase:","Beginn: 06.07.26 um 05:00 Uhr","Ende: 07.11.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 31.12.26)","","A1: Köln -> Euskirchen, zwischen 2.1 km hinter AS Erftstadt und 0.6 km vor AK Bliesheim","","Länge: 1.27 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 9 m","","BW Merowingerstraße"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.807878793,50.786048789],[6.8082637,50.785497501],[6.8097605,50.783323701],[6.8102829,50.782571401],[6.8120364,50.780085201],[6.8124612,50.779521301],[6.8129118,50.778961501],[6.8137872,50.777961101],[6.8143334,50.777378001],[6.8149139,50.776797601],[6.815916118,50.775863301]]}},{"identifier":"2023-000192--vi-bs.2026-05-20_09-00-00-000.devi-zus.2021-04-15_15-00-00-000_001.de658","icon":"123","isBlocked":"false","future":false,"extent":"51.02080626612525,6.936369209465316,51.030074242002556,6.952812892334066","point":"51.02080626612525,6.936369209465316","startLcPosition":"75","impact":{"lower":"Leverkusener Brücke","upper":"Köln-Nord","symbols":["ARROW_DOWN","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Euskirchen -> Dortmund","title":"A1 | Köln-Nord - Leverkusener Brücke","startTimestamp":"2026-05-20T09:00:00+02:00","coordinate":{"lat":51.02080626612525,"long":6.936369209465316},"description":["Zeitraum dieser Bauphase:","Beginn: 20.05.26 um 09:00 Uhr","Ende: 19.05.28 um 22:00 Uhr","(Ende der Gesamtmaßnahme: 19.05.28)","","A1: Euskirchen -> Dortmund, zwischen 4.2 km hinter AK Köln-Nord und 0.7 km vor Leverkusener Brücke","","Länge: 1.55 km | Maximale Durchfahrtsbreite: 9.5 m","","Rheinbr. Leverkusen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.936369209,51.020806266],[6.9372284,51.021185101],[6.937559,51.021326801],[6.9380199,51.021534901],[6.9402921,51.022599001],[6.9419776,51.023443901],[6.9433323,51.024212001],[6.9437405,51.024448701],[6.9441236,51.024698301],[6.9448141,51.025171101],[6.9451369,51.025388101],[6.9461874,51.026071001],[6.9484488,51.027543801],[6.9488495,51.027791301],[6.9497243,51.028301001],[6.9507346,51.028901001],[6.9518742,51.029560401],[6.952812892,51.030074242]]}},{"identifier":"2023-001712--vi-fbm.2026-09-15_07-00-00-000.devi-zus.2017-11-15_09-00-00-000_005.de159","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.0318841489946,6.956066269993338,51.03910609172925,6.999688854087375","point":"51.0318841489946,6.956066269993338","startLcPosition":"76","impact":{"lower":"Leverkusen","upper":"Köln-Niehl","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Köln-Niehl - Leverkusen","coordinate":{"lat":51.0318841489946,"long":6.956066269993338},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 09:00 bis 15:00 Uhr","16.09.26 von 09:00 bis 15:00 Uhr","19.09.26 von 16:00 bis 20:00 Uhr","","A1: Köln -> Dortmund, zwischen 1.3 km hinter AS Köln-Niehl und 0.6 km vor AK Leverkusen","","Länge: 3.33 km | Maximale Durchfahrtsbreite: 7 m","","Rheinbrücke Leverkusen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.95606627,51.031884149],[6.9626396,51.035540301],[6.9642841,51.036412301],[6.9649133,51.036749901],[6.9654008,51.036977201],[6.9658376,51.037159801],[6.9663209,51.037341501],[6.9669481,51.037559601],[6.9673115,51.037675101],[6.9676575,51.037762801],[6.9681215,51.037838701],[6.9685909,51.037887601],[6.9691032,51.037901101],[6.9695834,51.037902401],[6.9699776,51.037939901],[6.970455,51.038015401],[6.971536,51.038184101],[6.97281,51.038292401],[6.9740917,51.038359601],[6.9750449,51.038372901],[6.9756981,51.038357601],[6.9761647,51.038339101],[6.9766866,51.038305901],[6.9778807,51.038210301],[6.9785803,51.038136901],[6.9802119,51.037952401],[6.9826419,51.037688201],[6.9832354,51.037631101],[6.9840731,51.037556901],[6.9847174,51.037504601],[6.9853585,51.037475901],[6.986331,51.037454601],[6.987181,51.037450701],[6.9879281,51.037434301],[6.9885607,51.037433601],[6.9891932,51.037442601],[6.9898251,51.037461501],[6.9904561,51.037490101],[6.9910857,51.037528501],[6.9917137,51.037576701],[6.9923396,51.037634601],[6.9929631,51.037702201],[6.9935838,51.037779401],[6.9941112,51.037853001],[6.9946361,51.037933601],[6.9951582,51.038021001],[6.9956772,51.038115401],[6.9961929,51.038216601],[6.9967052,51.038324601],[6.9972136,51.038439401],[6.9977181,51.038560901],[6.9982185,51.038689001],[6.9987826,51.038838101],[6.9996504,51.039094401],[6.999688854,51.039106092]]}},{"identifier":"2023-000192--vi-bs.2026-05-20_09-00-00-000.devi-zus.2021-04-15_15-00-00-000_001.de652","icon":"123","isBlocked":"false","future":false,"extent":"51.038519531751696,6.971886424592566,51.0374480252113,6.987361631618634","point":"51.038519531751696,6.971886424592566","startLcPosition":"78","impact":{"lower":"Leverkusen","upper":"Leverkusen-West","symbols":["ARROW_DOWN","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Leverkusen-West - Leverkusen","startTimestamp":"2026-05-20T09:00:00+02:00","coordinate":{"lat":51.038519531751696,"long":6.971886424592566},"description":["Zeitraum dieser Bauphase:","Beginn: 20.05.26 um 09:00 Uhr","Ende: 19.05.28 um 22:00 Uhr","(Ende der Gesamtmaßnahme: 19.05.28)","","A1: Köln -> Dortmund, zwischen 0.6 km hinter AK Leverkusen-West und 1.5 km vor AK Leverkusen","","Länge: 1.1 km | Maximale Durchfahrtsbreite: 9 m","","Rheinbr. Leverkusen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.971886425,51.038519532],[6.9724025,51.038585801],[6.9732436,51.038655801],[6.9739226,51.038687201],[6.9748482,51.038697601],[6.9757463,51.038677401],[6.9766889,51.038621801],[6.9777529,51.038518301],[6.9787773,51.038390701],[6.979923,51.038236101],[6.9814183,51.038010801],[6.9819258,51.037934401],[6.9829229,51.037799801],[6.983483,51.037730601],[6.983969,51.037671601],[6.9844952,51.037616201],[6.9848988,51.037575601],[6.9862399,51.037485001],[6.987181,51.037452401],[6.987361632,51.037448025]]}},{"identifier":"2023-000192--vi-bs.2026-05-20_09-00-00-000.devi-zus.2021-04-15_15-00-00-000_001.de654","icon":"123","isBlocked":"false","future":false,"extent":"51.038649260441424,6.971844968211447,51.028641762472695,6.950060080167562","point":"51.038649260441424,6.971844968211447","startLcPosition":"79","impact":{"lower":"Köln-Niehl","upper":"Leverkusen","symbols":["CLOSED","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Leverkusen - Köln-Niehl","startTimestamp":"2026-05-20T09:00:00+02:00","coordinate":{"lat":51.038649260441424,"long":6.971844968211447},"description":["Zeitraum dieser Bauphase:","Beginn: 20.05.26 um 09:00 Uhr","Ende: 19.05.28 um 22:00 Uhr","(Ende der Gesamtmaßnahme: 19.05.28)","","A1: Dortmund -> Köln, zwischen 2.6 km hinter AK Leverkusen und 0.7 km vor AS Köln-Niehl","","Länge: 1.9 km | Maximale Durchfahrtsbreite: 9 m","","Rheinbr. Leverkusen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.971844968,51.03864926],[6.9714709,51.038602201],[6.9708525,51.038530601],[6.9701961,51.038418301],[6.9697348,51.038345201],[6.9685709,51.038096601],[6.9679888,51.037964401],[6.9674182,51.037805001],[6.9667324,51.037579201],[6.9662603,51.037412901],[6.9655664,51.037156401],[6.9647877,51.036803101],[6.9641688,51.036493801],[6.9625448,51.035618601],[6.9527237,51.030137001],[6.9516065,51.029555701],[6.95006008,51.028641762]]}},{"identifier":"2023-000192--vi-bs.2026-05-20_09-00-00-000.devi-zus.2021-04-15_15-00-00-000_001.de650","icon":"123","isBlocked":"false","future":false,"extent":"51.03760107264479,6.987369707796748,51.038649260441424,6.971844968211447","point":"51.03760107264479,6.987369707796748","startLcPosition":"79","impact":{"lower":"Leverkusen-West","upper":"Leverkusen","symbols":["ARROW_DOWN","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Leverkusen - Leverkusen-West","startTimestamp":"2026-05-20T09:00:00+02:00","coordinate":{"lat":51.03760107264479,"long":6.987369707796748},"description":["Zeitraum dieser Bauphase:","Beginn: 20.05.26 um 09:00 Uhr","Ende: 19.05.28 um 22:00 Uhr","(Ende der Gesamtmaßnahme: 19.05.28)","","A1: Dortmund -> Köln, zwischen 1.5 km hinter AK Leverkusen und 0.6 km vor AK Leverkusen-West","","Länge: 1.1 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 9 m","","Rheinbr. Leverkusen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.987369708,51.037601073],[6.9872333,51.037603501],[6.9864585,51.037625501],[6.985534,51.037679401],[6.9844458,51.037766501],[6.9838661,51.037826701],[6.983404,51.037880701],[6.9824992,51.038002601],[6.9816215,51.038128501],[6.9810666,51.038201101],[6.9805858,51.038268301],[6.979968,51.038357601],[6.978913,51.038521001],[6.9778842,51.038650301],[6.9766971,51.038763001],[6.9757696,51.038818101],[6.9745366,51.038839301],[6.9740548,51.038830301],[6.9732539,51.038792201],[6.9723747,51.038715901],[6.971844968,51.03864926]]}},{"identifier":"2026-014896--vi-bs.2026-09-11_20-00-00-000.devi-zus.2026-03-27_21-00-00-000_003.de12","icon":"123","isBlocked":"false","future":false,"extent":"51.08012038154936,7.128342539107613,51.10264556640158,7.141765331199994","point":"51.08012038154936,7.128342539107613","startLcPosition":"79","impact":{"lower":"Wermelskirchen","upper":"Leverkusen","symbols":["SEPARATE","ARROW_UP","CLOSED","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Leverkusen - Wermelskirchen","startTimestamp":"2026-09-11T20:00:00+02:00","coordinate":{"lat":51.08012038154936,"long":7.128342539107613},"description":["Zeitraum dieser Bauphase:","Beginn: 11.09.26 um 20:00 Uhr","Ende: 14.09.26 um 05:00 Uhr","(Ende der Gesamtmaßnahme: 14.09.26)","","A1: Köln -> Dortmund, zwischen 9.6 km hinter AK Leverkusen und 5.6 km vor AS Wermelskirchen","","Länge: 2.7 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 Fahrbahninstandsetzung (AM Remscheid)"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.128342539,51.080120382],[7.1288184,51.080526401],[7.1291413,51.080827501],[7.1295191,51.081205001],[7.1299277,51.081636001],[7.1303928,51.082187601],[7.1308347,51.082758601],[7.1312254,51.083313901],[7.1314189,51.083585601],[7.1321553,51.084679501],[7.1332191,51.086222501],[7.1343284,51.087904701],[7.136064,51.090404501],[7.1371759,51.092022801],[7.1382263,51.093543901],[7.138938,51.094600601],[7.1397221,51.095748501],[7.1403884,51.096743701],[7.1406426,51.097146301],[7.1408369,51.097482001],[7.1409915,51.097746601],[7.1411499,51.098030101],[7.1413064,51.098366001],[7.141446,51.098689201],[7.1415681,51.099021001],[7.1416728,51.099375201],[7.1417282,51.099614201],[7.1417782,51.099825101],[7.1418345,51.100111601],[7.1418528,51.100446201],[7.1418681,51.100784801],[7.1418534,51.101349401],[7.1418074,51.102157401],[7.141765331,51.102645566]]}},{"identifier":"2023-000175--vi-bs.2025-09-06_09-00-00-000.f.devi-zus.2025-09-06_09-00-00-000_002.f.de3","icon":"123","isBlocked":"false","future":false,"extent":"51.0931931466092,7.13798407900436,51.1102975110937,7.144928550246046","point":"51.0931931466092,7.13798407900436","startLcPosition":"80","impact":{"lower":"Wermelskirchen","upper":"Burscheid","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Burscheid - Wermelskirchen","startTimestamp":"2025-09-06T09:00:00+02:00","coordinate":{"lat":51.0931931466092,"long":7.13798407900436},"description":["Zeitraum dieser Bauphase:","Beginn: 06.09.25 um 09:00 Uhr","Ende: 19.12.26 um 15:00 Uhr","(Ende der Gesamtmaßnahme: 19.12.26)","","A1: Köln -> Dortmund, zwischen 1.1 km hinter AS Burscheid und 4.7 km vor AS Wermelskirchen","","Länge: 2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 9.25 m","","BW Hilgener Straße"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.137984079,51.093193147],[7.1382263,51.093543901],[7.138938,51.094600601],[7.1397221,51.095748501],[7.1403884,51.096743701],[7.1406426,51.097146301],[7.1408369,51.097482001],[7.1409915,51.097746601],[7.1411499,51.098030101],[7.1413064,51.098366001],[7.141446,51.098689201],[7.1415681,51.099021001],[7.1416728,51.099375201],[7.1417282,51.099614201],[7.1417782,51.099825101],[7.1418345,51.100111601],[7.1418528,51.100446201],[7.1418681,51.100784801],[7.1418534,51.101349401],[7.1418074,51.102157401],[7.1417352,51.102995201],[7.1416948,51.103799801],[7.1417046,51.104352201],[7.1417715,51.104895601],[7.1419609,51.105818901],[7.1422664,51.106644001],[7.142551,51.107261401],[7.1427617,51.107661501],[7.1431758,51.108293401],[7.143538,51.108773101],[7.1439407,51.109233801],[7.1446801,51.110045901],[7.14492855,51.110297511]]}},{"identifier":"2024-004899--vi-bs.2024-02-04_16-00-00-000.devi-zus.2024-02-01_15-00-00-000.de1","icon":"123","isBlocked":"false","future":false,"extent":"51.043684008195015,7.012093428132492,51.037604830336214,6.987186486102165","point":"51.043684008195015,7.012093428132492","startLcPosition":"80","impact":{"lower":"Leverkusen-West","upper":"Burscheid","symbols":["SEPARATE","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Burscheid - Leverkusen-West","startTimestamp":"2024-02-04T16:00:00+01:00","coordinate":{"lat":51.043684008195015,"long":7.012093428132492},"description":["Zeitraum dieser Bauphase:","Beginn: 04.02.24 um 16:00 Uhr","Ende: 31.12.27 um 05:00 Uhr","(Ende der Gesamtmaßnahme: 31.12.27)","","A1: Dortmund -> Köln, zwischen 9.7 km hinter AS Burscheid und 1.7 km vor AK Leverkusen-West","","Länge: 1.91 km | Max. 100 km/h | Maximale Durchfahrtsbreite: 6.5 m","","AK Leverkusen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.012093428,51.043684008],[7.011388,51.043441001],[7.0107013,51.043207901],[7.0100833,51.042986701],[7.0091953,51.042650001],[7.0082906,51.042315201],[7.0079005,51.042161601],[7.0067234,51.041721201],[7.0057101,51.041344601],[7.0048166,51.041017301],[7.0042595,51.040804101],[7.0032237,51.040431501],[7.0027252,51.040252101],[7.0024568,51.040158301],[7.0009057,51.039647301],[6.9999717,51.039354301],[6.9995568,51.039223901],[6.9986368,51.038955301],[6.9981425,51.038822201],[6.9976437,51.038695701],[6.9971408,51.038575801],[6.9966341,51.038462601],[6.9961237,51.038356101],[6.9956099,51.038256401],[6.9951499,51.038173401],[6.9946875,51.038095701],[6.9942229,51.038023601],[6.9937563,51.037956901],[6.9935306,51.037926701],[6.9933192,51.037899601],[6.9927059,51.037827601],[6.9920901,51.037765101],[6.991472,51.037712001],[6.9909443,51.037674301],[6.9904154,51.037643401],[6.9898856,51.037619501],[6.9893551,51.037602401],[6.9885686,51.037589901],[6.987941,51.037590901],[6.9872333,51.037603501],[6.987186486,51.03760483]]}},{"identifier":"2023-000175--vi-bs.2025-09-06_09-00-00-000.f.devi-zus.2025-09-06_09-00-00-000_002.f.de1","icon":"123","isBlocked":"false","future":false,"extent":"51.11036997646004,7.144715899270131,51.09324134356749,7.137735392476585","point":"51.11036997646004,7.144715899270131","startLcPosition":"81","impact":{"lower":"Burscheid","upper":"Wermelskirchen","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Wermelskirchen - Burscheid","startTimestamp":"2025-09-06T09:00:00+02:00","coordinate":{"lat":51.11036997646004,"long":7.144715899270131},"description":["Zeitraum dieser Bauphase:","Beginn: 06.09.25 um 09:00 Uhr","Ende: 19.12.26 um 15:00 Uhr","(Ende der Gesamtmaßnahme: 19.12.26)","","A1: Dortmund -> Köln, zwischen 4.7 km hinter AS Wermelskirchen und 1.1 km vor AS Burscheid","","Länge: 2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 9.25 m","","BW Hilgener Straße"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.144715899,51.110369976],[7.1444791,51.110128901],[7.1437274,51.109317001],[7.1433296,51.108849801],[7.1429482,51.108350601],[7.1425374,51.107717101],[7.1423168,51.107312801],[7.1420203,51.106670501],[7.1417111,51.105829201],[7.1415236,51.104903501],[7.1414638,51.104352201],[7.1414514,51.103738401],[7.1414865,51.102993201],[7.1415509,51.102170001],[7.1416141,51.101320101],[7.1416091,51.100788301],[7.1415988,51.100435401],[7.1415677,51.100140001],[7.1415216,51.099808401],[7.1414846,51.099633101],[7.1414261,51.099398001],[7.1413215,51.099052001],[7.1412114,51.098741701],[7.1410598,51.098399301],[7.140908,51.098075601],[7.1407564,51.097794301],[7.140602,51.097532301],[7.1404074,51.097191601],[7.1401504,51.096792401],[7.1394923,51.095803401],[7.1392924,51.095516501],[7.138697,51.094645501],[7.1379844,51.093606101],[7.137735392,51.093241344]]}},{"identifier":"2026-037949--vi-bs.2026-09-11_20-00-00-000.devi-zus.2026-08-14_20-00-00-000_001.de1","icon":"123","isBlocked":"false","future":false,"extent":"51.30314031589131,7.263021583133737,51.32682515648877,7.311137134678465","point":"51.30314031589131,7.263021583133737","startLcPosition":"88","impact":{"lower":"Klosterholz","upper":"Wuppertal-Langerfeld","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Wuppertal-Langerfeld - Klosterholz","startTimestamp":"2026-09-11T20:00:00+02:00","coordinate":{"lat":51.30314031589131,"long":7.263021583133737},"description":["Zeitraum dieser Bauphase:","Beginn: 11.09.26 um 20:00 Uhr","Ende: 14.09.26 um 05:00 Uhr","(Ende der Gesamtmaßnahme: 02.11.26)","","A1: Köln -> Dortmund, zwischen 2.3 km hinter AS Wuppertal-Langerfeld und 0.3 km vor Klosterholz","","Länge: 4.5 km | Maximale Durchfahrtsbreite: 6.5 m","","A1 - Vorarbeiten für den Ersatzneubau BW Gevelsberger Str. und BW Schwelmer Str. - AlD 37949"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.263021583,51.303140316],[7.2631513,51.303890401],[7.2631899,51.304046801],[7.2633628,51.304739301],[7.2635829,51.305436001],[7.2638235,51.306049601],[7.2640616,51.306526001],[7.2644291,51.307168301],[7.2647818,51.307703001],[7.2652295,51.308271301],[7.2654521,51.308530001],[7.2661696,51.309283501],[7.2664319,51.309521501],[7.2667081,51.309772201],[7.2672848,51.310231701],[7.2677782,51.310597501],[7.2684209,51.311041301],[7.2693095,51.311597701],[7.2705089,51.312304301],[7.2721134,51.313206201],[7.2746359,51.314643401],[7.2765745,51.315730001],[7.2779499,51.316518001],[7.2782104,51.316660701],[7.2808842,51.318141001],[7.2817805,51.318610001],[7.2830765,51.319243901],[7.2836497,51.319514201],[7.2851798,51.320193901],[7.2868724,51.320876601],[7.2878165,51.321237601],[7.2891108,51.321702701],[7.2892994,51.321764501],[7.2913821,51.322445401],[7.292443,51.322751401],[7.2935183,51.323051701],[7.295211,51.323482101],[7.2966362,51.323816601],[7.2975287,51.324005501],[7.2988753,51.324280801],[7.2998665,51.324468701],[7.3007967,51.324627601],[7.3015064,51.324729201],[7.3033726,51.325011501],[7.3035732,51.325038201],[7.3053122,51.325306901],[7.3067101,51.325573701],[7.3076035,51.325763801],[7.3085281,51.325993901],[7.3095159,51.326279601],[7.3104364,51.326577501],[7.3110864,51.326806001],[7.311137135,51.326825156]]}},{"identifier":"2026-045156--vi-bs.2026-09-13_07-00-00-000.devi-zus.2026-09-13_07-00-00-000.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.40796182867428,7.489193571258434,51.413421964424465,7.504839781660154","point":"51.40796182867428,7.489193571258434","startLcPosition":"98","impact":{"lower":"Westhofener Kreuz","upper":"Hagen-Nord","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Hagen-Nord - Westhofener Kreuz","coordinate":{"lat":51.40796182867428,"long":7.489193571258434},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","13.09.26 von 07:00 bis 10:00 Uhr","","A1: Köln -> Dortmund, zwischen 1.2 km hinter AS Hagen-Nord und 2.9 km vor AK Westhofener Kreuz","","Länge: 1.25 km | Maximale Durchfahrtsbreite: 6.5 m","","A1 - im Bereich PWC-Anlage Lennhof - Montage von Flugwarnkugeln - Der Verkehr wird zwischen 7 und 10 Uhr fünfmal je für max. 15 Minuten angehalten. Verkehr fließt zwischenzeitlich 2-streifig ab - AkD 45156"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.489193571,51.407961829],[7.4907507,51.408307401],[7.4914781,51.408473001],[7.4925524,51.408761601],[7.4935601,51.409036101],[7.4945656,51.409334801],[7.4951764,51.409518901],[7.496816,51.410044701],[7.4973842,51.410236901],[7.4986848,51.410707701],[7.4993786,51.410987801],[7.4996258,51.411080901],[7.5005475,51.411437901],[7.5008235,51.411553301],[7.5011407,51.411685901],[7.5019284,51.412035801],[7.5025386,51.412312001],[7.5028929,51.412474901],[7.5040675,51.413034701],[7.5048106,51.413405801],[7.504839782,51.413421964]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de130","icon":"123","isBlocked":"false","future":false,"extent":"51.422153455948035,7.517196696489643,51.42706313686968,7.526371574958433","point":"51.422153455948035,7.517196696489643","startLcPosition":"99","impact":{"lower":"Westhofener Kreuz","upper":"Lennhof","symbols":["CLOSED","BORDER_LEFT","CLOSED","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Lennhof - Westhofener Kreuz","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.422153455948035,"long":7.517196696489643},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","A1: Köln -> Dortmund, zwischen 1.6 km hinter Lennhof und 0.8 km vor AK Westhofener Kreuz","","Länge: 0.85 km | Maximale Durchfahrtsbreite: 8.7 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.517196696,51.422153456],[7.5177442,51.422599901],[7.5189228,51.423550401],[7.5194478,51.423944401],[7.5200009,51.424332601],[7.5206764,51.424742801],[7.5210379,51.424946401],[7.5213936,51.425133301],[7.5221184,51.425470101],[7.5225624,51.425659501],[7.5231492,51.425889001],[7.5237346,51.426101701],[7.5242819,51.426295501],[7.5251449,51.426593301],[7.5257139,51.426799201],[7.5262391,51.427005501],[7.526371575,51.427063137]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de122","icon":"123","isBlocked":"false","future":false,"extent":"51.41930879834791,7.513700513934048,51.422153455948035,7.517196696489643","point":"51.41930879834791,7.513700513934048","startLcPosition":"99","impact":{"lower":"Westhofener Kreuz","upper":"Lennhof","symbols":["CLOSED","BORDER_LEFT","ARROW_DOWN","CLOSED","CLOSED","SEPARATE","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Lennhof - Westhofener Kreuz","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.41930879834791,"long":7.513700513934048},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","A1: Köln -> Dortmund, zwischen 1.2 km hinter Lennhof und 1.6 km vor AK Westhofener Kreuz","","Länge: 0.4 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.5 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.513700514,51.419308798],[7.5146331,51.420062901],[7.517196696,51.422153456]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de98","icon":"123","isBlocked":"false","future":false,"extent":"51.42706313686968,7.526371574958433,51.43944061385197,7.5348905543182","point":"51.42706313686968,7.526371574958433","startLcPosition":"99","impact":{"lower":"Schwerte","upper":"Lennhof","symbols":["CLOSED","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","CLOSED","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Lennhof - Schwerte","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.42706313686968,"long":7.526371574958433},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","A1: Köln -> Dortmund, zwischen 2.5 km hinter Lennhof und 2.8 km vor AS Schwerte","","Länge: 1.54 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.75 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.526371575,51.427063137],[7.5266349,51.427177701],[7.5274863,51.427589401],[7.5280763,51.427906001],[7.5286344,51.428252301],[7.5291572,51.428603401],[7.5298408,51.429136801],[7.5301085,51.429364601],[7.5305409,51.429773701],[7.5308459,51.430091401],[7.5310242,51.430292301],[7.5312537,51.430574201],[7.5315416,51.430963801],[7.53177,51.431322801],[7.5319521,51.431637101],[7.5321431,51.432010601],[7.5322859,51.432301601],[7.5325047,51.432834701],[7.5329468,51.434058501],[7.5334926,51.435572901],[7.5341035,51.437268501],[7.5345557,51.438517101],[7.5348866,51.439429301],[7.534890554,51.439440614]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de120","icon":"123","isBlocked":"false","future":false,"extent":"51.41522723103798,7.508048620159812,51.41930879834791,7.513700513934048","point":"51.41522723103798,7.508048620159812","startLcPosition":"99","impact":{"lower":"Westhofener Kreuz","upper":"Lennhof","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Lennhof - Westhofener Kreuz","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.41522723103798,"long":7.508048620159812},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","A1: Köln -> Dortmund, zwischen 0.6 km hinter Lennhof und 2.0 km vor AK Westhofener Kreuz","","Länge: 0.6 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.5 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.50804862,51.415227231],[7.5083858,51.415429601],[7.5100705,51.416539401],[7.5107445,51.417017801],[7.5114066,51.417494101],[7.5124012,51.418258101],[7.513700514,51.419308798]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de132","icon":"123","isBlocked":"false","future":false,"extent":"51.42717750774363,7.526243828180401,51.42223836605438,7.517019727815987","point":"51.42717750774363,7.526243828180401","startLcPosition":"100","impact":{"lower":"Lennhof","upper":"Westhofener Kreuz","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Westhofener Kreuz - Lennhof","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.42717750774363,"long":7.526243828180401},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","A1: Dortmund -> Köln, zwischen 0.7 km hinter AK Westhofener Kreuz und 1.6 km vor Lennhof","","Länge: 0.85 km | Maximale Durchfahrtsbreite: 6.75 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.526243828,51.427177508],[7.5261404,51.427132201],[7.5256052,51.426920201],[7.5250604,51.426723201],[7.5241761,51.426419201],[7.523629,51.426224501],[7.5230882,51.426027701],[7.5224673,51.425784401],[7.5220164,51.425594601],[7.5212487,51.425238001],[7.5208898,51.425049201],[7.5205455,51.424857601],[7.5198485,51.424435501],[7.519293,51.424047101],[7.5187703,51.423656301],[7.5175772,51.422692101],[7.517019728,51.422238366]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de124","icon":"123","isBlocked":"false","future":false,"extent":"51.42223836605438,7.517019727815987,51.41939357003083,7.513524595989551","point":"51.42223836605438,7.517019727815987","startLcPosition":"100","impact":{"lower":"Lennhof","upper":"Westhofener Kreuz","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","SEPARATE","CLOSED","CLOSED","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Westhofener Kreuz - Lennhof","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.42223836605438,"long":7.517019727815987},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","A1: Dortmund -> Köln, zwischen 1.6 km hinter AK Westhofener Kreuz und 1.2 km vor Lennhof","","Länge: 0.4 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4.75 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.517019728,51.422238366],[7.5144246,51.420126001],[7.513524596,51.41939357]]}},{"identifier":"2026-045619--vi-bs.2026-09-23_10-00-00-000.devi-zus.2026-09-23_10-00-00-000.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.454522645364094,7.551814986974963,51.45539527101572,7.555083131066633","point":"51.454522645364094,7.551814986974963","startLcPosition":"100","impact":{"lower":"Schwerte","upper":"Westhofener Kreuz","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Köln -> Dortmund","title":"A1 | Westhofener Kreuz - Schwerte","coordinate":{"lat":51.454522645364094,"long":7.551814986974963},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","23.09.26 von 10:00 bis 14:00 Uhr","","A1: Köln -> Dortmund, zwischen 3.0 km hinter AK Westhofener Kreuz und 0.3 km vor AS Schwerte","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m","","A1 - Bauwerksarbeiten - AkD 45619"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.551814987,51.454522645],[7.5535416,51.454985501],[7.555083131,51.455395271]]}},{"identifier":"2026-046630--vi-bs.2026-09-14_20-00-00-000_016.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.41832415949328,7.512210581101073,51.41501430000531,7.507379314574145","point":"51.41832415949328,7.512210581101073","startLcPosition":"100","impact":{"lower":"Lennhof","upper":"Westhofener Kreuz","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Westhofener Kreuz - Lennhof","coordinate":{"lat":51.41832415949328,"long":7.512210581101073},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 20:00 bis zum 15.09.26 05:00 Uhr.","","A1: Dortmund -> Köln, zwischen 2.2 km hinter AK Westhofener Kreuz und 0.6 km vor Lennhof","","Länge: 0.5 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m","","A1 - Markierungsarbeiten - AkD 46630"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.512210581,51.418324159],[7.512175,51.418295201],[7.5111705,51.417531001],[7.5105794,51.417093201],[7.5098912,51.416614601],[7.5082307,51.415523301],[7.507379315,51.4150143]]}},{"identifier":"2026-045619--vi-bs.2026-09-23_10-00-00-000.devi-zus.2026-09-23_10-00-00-000.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.45552601745467,7.554993710058543,51.45465256460242,7.551725718573399","point":"51.45552601745467,7.554993710058543","startLcPosition":"101","impact":{"lower":"Westhofener Kreuz","upper":"Schwerte","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Schwerte - Westhofener Kreuz","coordinate":{"lat":51.45552601745467,"long":7.554993710058543},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","23.09.26 von 10:00 bis 14:00 Uhr","","A1: Dortmund -> Köln, zwischen 0.3 km hinter AS Schwerte und 3.0 km vor AK Westhofener Kreuz","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m","","A1 - Bauwerksarbeiten - AkD 45619"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.55499371,51.455526017],[7.554853,51.455488301],[7.5536909,51.455179801],[7.551725719,51.454652565]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de100","icon":"123","isBlocked":"false","future":false,"extent":"51.43947221539487,7.534662739298621,51.42717750774363,7.526243828180401","point":"51.43947221539487,7.534662739298621","startLcPosition":"101","impact":{"lower":"Lennhof","upper":"Schwerte","symbols":["ARROW_DOWN","ARROW_DOWN","CLOSED","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","SEPARATE","ARROW_UP","ARROW_UP","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Schwerte - Lennhof","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.43947221539487,"long":7.534662739298621},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","A1: Dortmund -> Köln, zwischen 2.8 km hinter AS Schwerte und 2.5 km vor Lennhof","","Länge: 1.54 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.5 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.534662739,51.439472215],[7.5343288,51.438546201],[7.5342333,51.438259101],[7.5322966,51.432906001],[7.5320745,51.432371101],[7.531932,51.432046401],[7.5317396,51.431674501],[7.5315585,51.431358301],[7.5313314,51.431017501],[7.5310449,51.430626501],[7.5308114,51.430345901],[7.5304039,51.429901801],[7.5301191,51.429622501],[7.5299272,51.429438301],[7.5296457,51.429205401],[7.5289686,51.428681101],[7.528477,51.428349401],[7.5279386,51.428021001],[7.5273535,51.427699501],[7.5265278,51.427301901],[7.526243828,51.427177508]]}},{"identifier":"2026-045156--vi-bs.2026-09-13_07-00-00-000.devi-zus.2026-09-13_07-00-00-000.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.44298039143532,7.535928112796526,51.42153250275568,7.516152511368882","point":"51.44298039143532,7.535928112796526","startLcPosition":"101","impact":{"lower":"Lennhof","upper":"Schwerte","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Schwerte - Lennhof","coordinate":{"lat":51.44298039143532,"long":7.535928112796526},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","13.09.26 von 07:00 bis 10:00 Uhr","","A1: Dortmund -> Köln, zwischen 2.4 km hinter AS Schwerte und 1.5 km vor Lennhof","","Länge: 2.89 km | Maximale Durchfahrtsbreite: 6.6 m","","A1 - im Bereich PWC-Anlage Lennhof - Montage von Flugwarnkugeln - Der Verkehr wird zwischen 7 und 10 Uhr fünfmal je für max. 15 Minuten angehalten. Verkehr fließt zwischenzeitlich 2-streifig ab - AkD 45156"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.535928113,51.442980391],[7.5357299,51.442430801],[7.5355416,51.441920501],[7.5349137,51.440169201],[7.5347235,51.439640701],[7.5343288,51.438546201],[7.5342333,51.438259101],[7.5322966,51.432906001],[7.5320745,51.432371101],[7.531932,51.432046401],[7.5317396,51.431674501],[7.5315585,51.431358301],[7.5313314,51.431017501],[7.5310449,51.430626501],[7.5308114,51.430345901],[7.5304039,51.429901801],[7.5301191,51.429622501],[7.5299272,51.429438301],[7.5296457,51.429205401],[7.5289686,51.428681101],[7.528477,51.428349401],[7.5279386,51.428021001],[7.5273535,51.427699501],[7.5265278,51.427301901],[7.5261404,51.427132201],[7.5256052,51.426920201],[7.5250604,51.426723201],[7.5241761,51.426419201],[7.523629,51.426224501],[7.5230882,51.426027701],[7.5224673,51.425784401],[7.5220164,51.425594601],[7.5212487,51.425238001],[7.5208898,51.425049201],[7.5205455,51.424857601],[7.5198485,51.424435501],[7.519293,51.424047101],[7.5187703,51.423656301],[7.5175772,51.422692101],[7.516152511,51.421532503]]}},{"identifier":"2023-000045--vi-bs.2026-07-06_05-00-00-000.devi-zus.2024-03-23_09-00-00-000_001.f.de101","icon":"123","isBlocked":"false","future":false,"extent":"50.77671903661104,6.815277558315082,50.780126778131894,6.812271388403191","point":"50.77671903661104,6.815277558315082","startLcPosition":"101","impact":{"lower":"Erftstadt","upper":"Bliesheim","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Koblenz -> Mönchengladbach","title":"A1 | Bliesheim - Erftstadt","startTimestamp":"2026-07-06T05:00:00+02:00","coordinate":{"lat":50.77671903661104,"long":6.815277558315082},"description":["Zeitraum dieser Bauphase:","Beginn: 06.07.26 um 05:00 Uhr","Ende: 07.11.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 31.12.26)","","A61: Koblenz -> Mönchengladbach, zwischen 0.8 km hinter AK Bliesheim und 2.9 km vor AS Erftstadt","","Länge: 0.44 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 9.5 m","","BW Merowingerstraße"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.815277558,50.776719037],[6.8151256,50.776859201],[6.8145022,50.777497201],[6.813883,50.778161001],[6.8131232,50.779031901],[6.8126652,50.779608101],[6.812271388,50.780126778]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de118","icon":"123","isBlocked":"false","future":false,"extent":"51.44560710889851,7.536926718624299,51.43947221539487,7.534662739298621","point":"51.44560710889851,7.536926718624299","startLcPosition":"101","impact":{"lower":"Westhofener Kreuz","upper":"Schwerte","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Köln","title":"A1 | Schwerte - Westhofener Kreuz","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.44560710889851,"long":7.536926718624299},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","A1: Dortmund -> Köln, zwischen 2.1 km hinter AS Schwerte und 0.8 km vor AK Westhofener Kreuz","","Länge: 0.7 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.75 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.536926719,51.445607109],[7.5367456,51.445189401],[7.5364609,51.444457601],[7.5357299,51.442430801],[7.5355416,51.441920501],[7.5349137,51.440169201],[7.5347235,51.439640701],[7.534662739,51.439472215]]}},{"identifier":"2023-000045--vi-bs.2026-07-06_05-00-00-000.devi-zus.2024-03-23_09-00-00-000_001.f.de99","icon":"123","isBlocked":"false","future":false,"extent":"50.775988397772565,6.816069657499233,50.77709861738715,6.814891664777494","point":"50.775988397772565,6.816069657499233","startLcPosition":"101","impact":{"lower":"Erftstadt","upper":"Bliesheim","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Koblenz -> Mönchengladbach","title":"A1 | Bliesheim - Erftstadt","startTimestamp":"2026-07-06T05:00:00+02:00","coordinate":{"lat":50.775988397772565,"long":6.816069657499233},"description":["Zeitraum dieser Bauphase:","Beginn: 06.07.26 um 05:00 Uhr","Ende: 07.11.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 31.12.26)","","A61: Koblenz -> Mönchengladbach, zwischen 0.7 km hinter AK Bliesheim und 3.2 km vor AS Erftstadt","","Länge: 0.15 km | Maximale Durchfahrtsbreite: 6 m","","BW Merowingerstraße"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.816069657,50.775988398],[6.8151256,50.776859201],[6.814891665,50.777098617]]}},{"identifier":"2023-002834--vi-bs.2026-08-03_20-00-00-000.devi-zus.2021-10-11_20-00-00-000.f_001.de71","icon":"123","isBlocked":"false","future":false,"extent":"51.5097875598432,7.652391094260623,51.52011554894408,7.6572940343554805","point":"51.5097875598432,7.652391094260623","startLcPosition":"102","impact":{"lower":"Dortmund/Unna","upper":"Lichtendorf","symbols":["CLOSED","CLOSED","CLOSED","SEPARATE","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Köln -> Münster","title":"A1 | Lichtendorf - Dortmund/Unna","startTimestamp":"2026-08-03T20:00:00+02:00","coordinate":{"lat":51.5097875598432,"long":7.652391094260623},"description":["Zeitraum dieser Bauphase:","Beginn: 03.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 02.11.27)","","A1: Köln -> Münster, zwischen 6.1 km hinter Lichtendorf und 0.2 km vor AK Dortmund/Unna","","Länge: 1.2 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 6.1 m","","A1 - Ersatzneubau TB Liedbachtal - AlD 2834"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.652391094,51.50978756],[7.6533143,51.511717901],[7.6534855,51.512096701],[7.654352,51.513987601],[7.6556186,51.516605601],[7.6564619,51.518408701],[7.65715,51.519804401],[7.657294034,51.520115549]]}},{"identifier":"2026-045143--vi-bs.2026-09-15_08-00-00-000.devi-bs.2026-09-08_08-00-00-000_003.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.49360069902362,7.633451527962491,51.49561852672466,7.636317642446212","point":"51.49360069902362,7.633451527962491","startLcPosition":"102","impact":{"lower":"Dortmund/Unna","upper":"Lichtendorf","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Köln -> Münster","title":"A1 | Lichtendorf - Dortmund/Unna","coordinate":{"lat":51.49360069902362,"long":7.633451527962491},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 08:00 bis 16:00 Uhr","16.09.26 von 08:00 bis 16:00 Uhr","","A1: Köln -> Münster, zwischen 3.9 km hinter Lichtendorf und 3.4 km vor AK Dortmund/Unna","","Länge: 0.3 km | Maximale Durchfahrtsbreite: 9.5 m","","A1 - Arbeiten an Schutzeinrichtungen - AkD 45143"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.633451528,51.493600699],[7.6347494,51.494519701],[7.6352438,51.494867401],[7.636317642,51.495618527]]}},{"identifier":"2023-002834--vi-bs.2026-08-03_20-00-00-000.devi-zus.2021-10-11_20-00-00-000.f_001.de69","icon":"123","isBlocked":"false","future":false,"extent":"51.503755961757996,7.647698686659268,51.5097875598432,7.652391094260623","point":"51.503755961757996,7.647698686659268","startLcPosition":"102","impact":{"lower":"Dortmund/Unna","upper":"Lichtendorf","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Köln -> Münster","title":"A1 | Lichtendorf - Dortmund/Unna","startTimestamp":"2026-08-03T20:00:00+02:00","coordinate":{"lat":51.503755961757996,"long":7.647698686659268},"description":["Zeitraum dieser Bauphase:","Beginn: 03.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 02.11.27)","","A1: Köln -> Münster, zwischen 5.4 km hinter Lichtendorf und 1.4 km vor AK Dortmund/Unna","","Länge: 0.75 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 9.6 m","","A1 - Ersatzneubau TB Liedbachtal - AlD 2834"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.647698687,51.503755962],[7.6481215,51.504093601],[7.6487583,51.504663701],[7.6494888,51.505422501],[7.6500717,51.506075301],[7.6504673,51.506563401],[7.6509764,51.507260101],[7.6512807,51.507713601],[7.6520465,51.509067001],[7.652391094,51.50978756]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de97","icon":"123","isBlocked":"false","future":false,"extent":"51.52011554894408,7.6572940343554805,51.528021224289745,7.659594784598197","point":"51.52011554894408,7.6572940343554805","startLcPosition":"102","impact":{"lower":"Kamen-Zentrum","upper":"Lichtendorf","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Köln -> Münster","title":"A1 | Lichtendorf - Kamen-Zentrum","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.52011554894408,"long":7.6572940343554805},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Köln -> Münster, zwischen 7.3 km hinter Lichtendorf und 5.4 km vor AS Kamen-Zentrum","","Länge: 0.89 km | Maximale Durchfahrtsbreite: 7 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.657294034,51.520115549],[7.6575551,51.520679501],[7.6579126,51.521477201],[7.658036,51.521790201],[7.6583571,51.522687401],[7.6585048,51.523145201],[7.6586696,51.523795401],[7.659594785,51.528021224]]}},{"identifier":"2026-038223--vi-bs.2026-09-22_09-00-00-000.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.469243467593124,7.597541227065045,51.474315735165526,7.603477088981231","point":"51.469243467593124,7.597541227065045","startLcPosition":"102","impact":{"lower":"Dortmund/Unna","upper":"Lichtendorf","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Köln -> Münster","title":"A1 | Lichtendorf - Dortmund/Unna","coordinate":{"lat":51.469243467593124,"long":7.597541227065045},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","22.09.26 von 09:00 bis 15:00 Uhr","","A1: Köln -> Münster, zwischen 0.1 km hinter Lichtendorf und 6.8 km vor AK Dortmund/Unna","","Länge: 0.7 km | Maximale Durchfahrtsbreite: 6 m","","A1 - Brückenwartung - AkD 38223"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.597541227,51.469243468],[7.5980563,51.469569801],[7.5984288,51.469822901],[7.5989563,51.470187301],[7.5998215,51.470828801],[7.600678,51.471523201],[7.6012739,51.472062701],[7.6014061,51.472188201],[7.6017069,51.472473701],[7.6019587,51.472717101],[7.6025975,51.473359501],[7.6032409,51.474060101],[7.603477089,51.474315735]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de139","icon":"123","isBlocked":"false","future":true,"extent":"51.52011554894408,7.6572940343554805,51.523150934357034,7.658506253175489","point":"51.52011554894408,7.6572940343554805","startLcPosition":"102","impact":{"lower":"Unna","upper":"Lichtendorf","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Köln -> Münster","title":"A1 | Lichtendorf - Unna","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.52011554894408,"long":7.6572940343554805},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Köln -> Münster, zwischen 7.3 km hinter Lichtendorf und 0.4 km vor AS Unna","","Länge: 0.35 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.657294034,51.520115549],[7.6575551,51.520679501],[7.6579126,51.521477201],[7.658036,51.521790201],[7.6583571,51.522687401],[7.6585048,51.523145201],[7.658506253,51.523150934]]}},{"identifier":"2023-002834--vi-bs.2026-08-03_20-00-00-000.devi-zus.2021-10-11_20-00-00-000.f_001.de73","icon":"123","isBlocked":"false","future":false,"extent":"51.520152400910206,7.657091225707881,51.50983265742994,7.652150530568508","point":"51.520152400910206,7.657091225707881","startLcPosition":"103","impact":{"lower":"Lichtendorf","upper":"Dortmund/Unna","symbols":["ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","SEPARATE","CLOSED","CLOSED","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Münster -> Köln","title":"A1 | Dortmund/Unna - Lichtendorf","startTimestamp":"2026-08-03T20:00:00+02:00","coordinate":{"lat":51.520152400910206,"long":7.657091225707881},"description":["Zeitraum dieser Bauphase:","Beginn: 03.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 02.11.27)","","A1: Münster -> Köln, zwischen 0.2 km hinter AK Dortmund/Unna und 6.1 km vor Lichtendorf","","Länge: 1.2 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 6.1 m","","A1 - Ersatzneubau TB Liedbachtal - AlD 2834"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.657091226,51.520152401],[7.6569276,51.519805501],[7.6563094,51.518503501],[7.6554374,51.516639201],[7.6541855,51.514020701],[7.653588,51.512795701],[7.6532426,51.512083201],[7.6531403,51.511873501],[7.6530359,51.511659801],[7.652150531,51.509832657]]}},{"identifier":"2026-045143--vi-bs.2026-09-15_08-00-00-000.devi-bs.2026-09-08_08-00-00-000_003.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.49571636905636,7.6361202353292255,51.49369610834194,7.6332564102986105","point":"51.49571636905636,7.6361202353292255","startLcPosition":"103","impact":{"lower":"Lichtendorf","upper":"Dortmund/Unna","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Köln","title":"A1 | Dortmund/Unna - Lichtendorf","coordinate":{"lat":51.49571636905636,"long":7.6361202353292255},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 08:00 bis 16:00 Uhr","16.09.26 von 08:00 bis 16:00 Uhr","","A1: Münster -> Köln, zwischen 3.4 km hinter AK Dortmund/Unna und 3.9 km vor Lichtendorf","","Länge: 0.3 km | Maximale Durchfahrtsbreite: 9.5 m","","A1 - Arbeiten an Schutzeinrichtungen - AkD 45143"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.636120235,51.495716369],[7.6351372,51.495027801],[7.63466,51.494689501],[7.63325641,51.493696108]]}},{"identifier":"2026-038221--vi-bs.2026-09-21_09-00-00-000.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.47518530477521,7.6040050061662825,51.47102467615435,7.599747236001914","point":"51.47518530477521,7.6040050061662825","startLcPosition":"103","impact":{"lower":"Lichtendorf","upper":"Dortmund/Unna","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Köln","title":"A1 | Dortmund/Unna - Lichtendorf","coordinate":{"lat":51.47518530477521,"long":7.6040050061662825},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","21.09.26 von 09:00 bis 15:00 Uhr","","A1: Münster -> Köln, zwischen 6.6 km hinter AK Dortmund/Unna und 0.4 km vor Lichtendorf","","Länge: 0.55 km | Maximale Durchfahrtsbreite: 6 m","","A1 - Bauwerksarbeiten - AkD 38221"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.604005006,51.475185305],[7.6038845,51.475058801],[7.6034068,51.474555101],[7.6029195,51.474030701],[7.6023792,51.473438701],[7.6017385,51.472795401],[7.6015638,51.472615601],[7.6012859,51.472346901],[7.6011375,51.472212301],[7.6005788,51.471709701],[7.5999855,51.471209501],[7.599747236,51.471024676]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de141","icon":"123","isBlocked":"false","future":true,"extent":"51.523150934357034,7.658506253175489,51.528021224289745,7.659594784598197","point":"51.523150934357034,7.658506253175489","startLcPosition":"103","impact":{"lower":"Kamen-Zentrum","upper":"Dortmund/Unna","symbols":["SEPARATE","CLOSED","CLOSED","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Dortmund/Unna - Kamen-Zentrum","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.523150934357034,"long":7.658506253175489},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Dortmund -> Münster, zwischen 0.1 km hinter AK Dortmund/Unna und 5.4 km vor AS Kamen-Zentrum","","Länge: 0.55 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.658506253,51.523150934],[7.6586696,51.523795401],[7.659594785,51.528021224]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de129","icon":"123","isBlocked":"false","future":false,"extent":"51.53601311174806,7.661330731780595,51.54181296037727,7.662594102344523","point":"51.53601311174806,7.661330731780595","startLcPosition":"104","impact":{"lower":"Kamen-Zentrum","upper":"Unna","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Unna - Kamen-Zentrum","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.53601311174806,"long":7.661330731780595},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Dortmund -> Münster, zwischen 1.1 km hinter AS Unna und 3.8 km vor AS Kamen-Zentrum","","Länge: 0.65 km | Maximale Durchfahrtsbreite: 10.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.661330732,51.536013112],[7.6613998,51.536336501],[7.6617604,51.537943301],[7.6618199,51.538205101],[7.6623505,51.540680901],[7.6624322,51.541044101],[7.662594102,51.54181296]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de111","icon":"123","isBlocked":"false","future":false,"extent":"51.528021224289745,7.659594784598197,51.53601311174806,7.661330731780595","point":"51.528021224289745,7.659594784598197","startLcPosition":"104","impact":{"lower":"Kamen-Zentrum","upper":"Unna","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Unna - Kamen-Zentrum","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.528021224289745,"long":7.659594784598197},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Dortmund -> Münster, zwischen 0.2 km hinter AS Unna und 4.5 km vor AS Kamen-Zentrum","","Länge: 0.9 km | Maximale Durchfahrtsbreite: 10.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.659594785,51.528021224],[7.6596232,51.528151001],[7.6599689,51.529711001],[7.6604344,51.531820701],[7.6608321,51.533678301],[7.661330732,51.536013112]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de143","icon":"123","isBlocked":"false","future":true,"extent":"51.528021224289745,7.659594784598197,51.53868493237518,7.661922730507668","point":"51.528021224289745,7.659594784598197","startLcPosition":"104","impact":{"lower":"Kamen-Zentrum","upper":"Unna","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Unna - Kamen-Zentrum","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.528021224289745,"long":7.659594784598197},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Dortmund -> Münster, zwischen 0.2 km hinter AS Unna und 4.2 km vor AS Kamen-Zentrum","","Länge: 1.2 km | Maximale Durchfahrtsbreite: 9.6 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.659594785,51.528021224],[7.6596232,51.528151001],[7.6599689,51.529711001],[7.6604344,51.531820701],[7.6608321,51.533678301],[7.6613998,51.536336501],[7.6617604,51.537943301],[7.6618199,51.538205101],[7.661922731,51.538684932]]}},{"identifier":"2026-044709--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_001.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.588812588622055,7.68383351040684,51.590540477916434,7.684668523170474","point":"51.588812588622055,7.68383351040684","startLcPosition":"105","impact":{"lower":"Kamener Kreuz","upper":"Kamen-Zentrum","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Kamen-Zentrum - Kamener Kreuz","coordinate":{"lat":51.588812588622055,"long":7.68383351040684},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 15:00 Uhr","","A1: Dortmund -> Münster, zwischen 1.8 km hinter AS Kamen-Zentrum und 1.2 km vor AK Kamener Kreuz","","Länge: 0.2 km | Maximale Durchfahrtsbreite: 6 m","","A1 - Brückenwartung - AkD 44709"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.68383351,51.588812589],[7.6840631,51.589213401],[7.6844138,51.589907101],[7.6845223,51.590157901],[7.684668523,51.590540478]]}},{"identifier":"2026-044709--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_001.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.588812588622055,7.68383351040684,51.590365554027386,7.684601665925212","point":"51.588812588622055,7.68383351040684","startLcPosition":"105","impact":{"lower":"Kamener Kreuz","upper":"Kamen-Zentrum","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Kamen-Zentrum - Kamener Kreuz","coordinate":{"lat":51.588812588622055,"long":7.68383351040684},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 15:00 Uhr","","A1: Dortmund -> Münster, zwischen 1.8 km hinter AS Kamen-Zentrum und 1.2 km vor AK Kamener Kreuz","","Länge: 0.18 km | Maximale Durchfahrtsbreite: 6.75 m","","A1 - Brückenwartung - AkD 44709"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.68383351,51.588812589],[7.6840631,51.589213401],[7.6844138,51.589907101],[7.6845223,51.590157901],[7.684601666,51.590365554]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de173","icon":"123","isBlocked":"false","future":true,"extent":"51.534697933083436,7.660792116765035,51.52016102593887,7.657095293992092","point":"51.534697933083436,7.660792116765035","startLcPosition":"105","impact":{"lower":"Lichtendorf","upper":"Kamen-Zentrum","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Münster -> Köln","title":"A1 | Kamen-Zentrum - Lichtendorf","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.534697933083436,"long":7.660792116765035},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Münster -> Köln, zwischen 4.6 km hinter AS Kamen-Zentrum und 7.3 km vor Lichtendorf","","Länge: 1.64 km | Maximale Durchfahrtsbreite: 6.1 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.660792117,51.534697933],[7.6606224,51.533943701],[7.6605195,51.533380101],[7.660249,51.532127501],[7.6601147,51.531467901],[7.659834,51.530173501],[7.6584509,51.523794501],[7.6582511,51.522961101],[7.6576962,51.521493601],[7.6573724,51.520748501],[7.657095294,51.520161026]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de171","icon":"123","isBlocked":"false","future":true,"extent":"51.53870589158548,7.661669793519102,51.534697933083436,7.660792116765035","point":"51.53870589158548,7.661669793519102","startLcPosition":"105","impact":{"lower":"Unna","upper":"Kamen-Zentrum","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Kamen-Zentrum - Unna","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.53870589158548,"long":7.661669793519102},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Münster -> Dortmund, zwischen 4.2 km hinter AS Kamen-Zentrum und 0.9 km vor AS Unna","","Länge: 0.45 km | Maximale Durchfahrtsbreite: 9.6 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.661669794,51.538705892],[7.6615908,51.538332901],[7.6615296,51.538071901],[7.6611478,51.536341501],[7.6609411,51.535369201],[7.6607967,51.534718301],[7.660792117,51.534697933]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de169","icon":"123","isBlocked":"false","future":true,"extent":"51.543161175750306,7.662630148908579,51.53870589158548,7.661669793519102","point":"51.543161175750306,7.662630148908579","startLcPosition":"105","impact":{"lower":"Unna","upper":"Kamen-Zentrum","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Kamen-Zentrum - Unna","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.543161175750306,"long":7.662630148908579},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Münster -> Dortmund, zwischen 3.7 km hinter AS Kamen-Zentrum und 1.4 km vor AS Unna","","Länge: 0.5 km | Maximale Durchfahrtsbreite: 9.6 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.662630149,51.543161176],[7.6625776,51.542913201],[7.6621581,51.540988301],[7.6620714,51.540602101],[7.661669794,51.538705892]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de167","icon":"123","isBlocked":"false","future":true,"extent":"51.54807762491685,7.66338581658675,51.543161175750306,7.662630148908579","point":"51.54807762491685,7.66338581658675","startLcPosition":"105","impact":{"lower":"Unna","upper":"Kamen-Zentrum","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Kamen-Zentrum - Unna","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.54807762491685,"long":7.66338581658675},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Münster -> Dortmund, zwischen 3.1 km hinter AS Kamen-Zentrum und 1.9 km vor AS Unna","","Länge: 0.55 km | Maximale Durchfahrtsbreite: 9.6 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.663385817,51.548077625],[7.663182,51.546327901],[7.6630105,51.545175201],[7.6626733,51.543364801],[7.662630149,51.543161176]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de127","icon":"123","isBlocked":"false","future":false,"extent":"51.534697933083436,7.660792116765035,51.52016102593887,7.657095293992092","point":"51.534697933083436,7.660792116765035","startLcPosition":"105","impact":{"lower":"Lichtendorf","upper":"Kamen-Zentrum","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Münster -> Köln","title":"A1 | Kamen-Zentrum - Lichtendorf","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.534697933083436,"long":7.660792116765035},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Münster -> Köln, zwischen 4.6 km hinter AS Kamen-Zentrum und 7.3 km vor Lichtendorf","","Länge: 1.64 km | Maximale Durchfahrtsbreite: 6.1 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.660792117,51.534697933],[7.6606224,51.533943701],[7.6605195,51.533380101],[7.660249,51.532127501],[7.6601147,51.531467901],[7.659834,51.530173501],[7.6584509,51.523794501],[7.6582511,51.522961101],[7.6576962,51.521493601],[7.6573724,51.520748501],[7.657095294,51.520161026]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de125","icon":"123","isBlocked":"false","future":false,"extent":"51.53870589158548,7.661669793519102,51.534697933083436,7.660792116765035","point":"51.53870589158548,7.661669793519102","startLcPosition":"105","impact":{"lower":"Unna","upper":"Kamen-Zentrum","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Kamen-Zentrum - Unna","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.53870589158548,"long":7.661669793519102},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Münster -> Dortmund, zwischen 4.2 km hinter AS Kamen-Zentrum und 0.9 km vor AS Unna","","Länge: 0.45 km | Maximale Durchfahrtsbreite: 9.6 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.661669794,51.538705892],[7.6615908,51.538332901],[7.6615296,51.538071901],[7.6611478,51.536341501],[7.6609411,51.535369201],[7.6607967,51.534718301],[7.660792117,51.534697933]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de123","icon":"123","isBlocked":"false","future":false,"extent":"51.543161175750306,7.662630148908579,51.53870589158548,7.661669793519102","point":"51.543161175750306,7.662630148908579","startLcPosition":"105","impact":{"lower":"Unna","upper":"Kamen-Zentrum","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Kamen-Zentrum - Unna","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.543161175750306,"long":7.662630148908579},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Münster -> Dortmund, zwischen 3.7 km hinter AS Kamen-Zentrum und 1.4 km vor AS Unna","","Länge: 0.5 km | Maximale Durchfahrtsbreite: 9.6 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.662630149,51.543161176],[7.6625776,51.542913201],[7.6621581,51.540988301],[7.6620714,51.540602101],[7.661669794,51.538705892]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de121","icon":"123","isBlocked":"false","future":false,"extent":"51.54807762491685,7.66338581658675,51.543161175750306,7.662630148908579","point":"51.54807762491685,7.66338581658675","startLcPosition":"105","impact":{"lower":"Unna","upper":"Kamen-Zentrum","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Kamen-Zentrum - Unna","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.54807762491685,"long":7.66338581658675},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","A1: Münster -> Dortmund, zwischen 3.1 km hinter AS Kamen-Zentrum und 1.9 km vor AS Unna","","Länge: 0.55 km | Maximale Durchfahrtsbreite: 9.6 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.663385817,51.548077625],[7.663182,51.546327901],[7.6630105,51.545175201],[7.6626733,51.543364801],[7.662630149,51.543161176]]}},{"identifier":"2026-044829--vi-bs.2026-09-14_09-00-00-000.devi-bs.2026-09-14_09-00-00-000_002.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.59279879102817,7.685089089246187,51.59041078829146,7.684358037367612","point":"51.59279879102817,7.685089089246187","startLcPosition":"106","impact":{"lower":"Kamen-Zentrum","upper":"Kamener Kreuz","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Kamener Kreuz - Kamen-Zentrum","coordinate":{"lat":51.59279879102817,"long":7.685089089246187},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 15:00 Uhr","","A1: Münster -> Dortmund, zwischen 0.9 km hinter AK Kamener Kreuz und 1.9 km vor AS Kamen-Zentrum","","Länge: 0.27 km | Maximale Durchfahrtsbreite: 6 m","","A1 - Brückenwartung - AkD 44829"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.685089089,51.592798791],[7.6850393,51.592602601],[7.6848811,51.592029801],[7.6848185,51.591782501],[7.6846605,51.591225101],[7.684358037,51.590410788]]}},{"identifier":"2026-044829--vi-bs.2026-09-14_09-00-00-000.devi-bs.2026-09-14_09-00-00-000_002.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.5904103740418,7.684357883504374,51.58886352617503,7.683604348255872","point":"51.5904103740418,7.684357883504374","startLcPosition":"106","impact":{"lower":"Kamen-Zentrum","upper":"Kamener Kreuz","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Kamener Kreuz - Kamen-Zentrum","coordinate":{"lat":51.5904103740418,"long":7.684357883504374},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 15:00 Uhr","","A1: Münster -> Dortmund, zwischen 1.2 km hinter AK Kamener Kreuz und 1.8 km vor AS Kamen-Zentrum","","Länge: 0.18 km | Maximale Durchfahrtsbreite: 6.75 m","","A1 - Brückenwartung - AkD 44829"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.684357884,51.590410374],[7.6842819,51.590205801],[7.6841741,51.589951201],[7.6838395,51.589274001],[7.683604348,51.588863526]]}},{"identifier":"2026-045282--vi-fbm.2026-09-14_09-00-00-000.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.588447333070846,7.683352801072117,51.58378909613461,7.679659758911904","point":"51.588447333070846,7.683352801072117","startLcPosition":"106","impact":{"lower":"Kamen-Zentrum","upper":"Kamener Kreuz","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Kamener Kreuz - Kamen-Zentrum","coordinate":{"lat":51.588447333070846,"long":7.683352801072117},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 15:00 Uhr","15.09.26 von 09:00 bis 15:00 Uhr","16.09.26 von 09:00 bis 15:00 Uhr","","A1: Münster -> Dortmund, zwischen 1.4 km hinter AK Kamener Kreuz und 1.1 km vor AS Kamen-Zentrum","","Länge: 0.58 km | Maximale Durchfahrtsbreite: 6 m","","A1 - Baustelleneinrichtung - AkD 45282"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.683352801,51.588447333],[7.6828909,51.587766101],[7.6824579,51.587183301],[7.6817905,51.586327901],[7.6813866,51.585829801],[7.6803807,51.584618001],[7.679659759,51.583789096]]}},{"identifier":"2026-045297--vi-fbm.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_002.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.61984515309781,7.689336416374088,51.61180444411588,7.689764486993772","point":"51.61984515309781,7.689336416374088","startLcPosition":"108","impact":{"lower":"Kamener Kreuz","upper":"Haus Reck","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Haus Reck - Kamener Kreuz","coordinate":{"lat":51.61984515309781,"long":7.689336416374088},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 15:00 Uhr","15.09.26 von 09:00 bis 15:00 Uhr","16.09.26 von 09:00 bis 15:00 Uhr","","A1: Münster -> Dortmund, zwischen 0.1 km hinter Haus Reck und 1.2 km vor AK Kamener Kreuz","","Länge: 0.9 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Baustelleneinrichtung - Wanderbaustelle - AkD 45297"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.689336416,51.619845153],[7.6893954,51.619656401],[7.6895107,51.619214501],[7.6896358,51.618701001],[7.6897735,51.617952001],[7.6898074,51.617783401],[7.6898901,51.617291001],[7.6899856,51.616443801],[7.690026,51.615879001],[7.6900539,51.615323901],[7.6900488,51.614450601],[7.6900354,51.614042401],[7.6899845,51.613339001],[7.6898746,51.612448501],[7.689764487,51.611804444]]}},{"identifier":"2026-045297--vi-fbm.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_002.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.61984515309781,7.689336416374088,51.61153802925955,7.689713650337754","point":"51.61984515309781,7.689336416374088","startLcPosition":"108","impact":{"lower":"Kamener Kreuz","upper":"Haus Reck","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Haus Reck - Kamener Kreuz","coordinate":{"lat":51.61984515309781,"long":7.689336416374088},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 15:00 Uhr","15.09.26 von 09:00 bis 15:00 Uhr","16.09.26 von 09:00 bis 15:00 Uhr","","A1: Münster -> Dortmund, zwischen 0.1 km hinter Haus Reck und 1.2 km vor AK Kamener Kreuz","","Länge: 0.93 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Baustelleneinrichtung - Wanderbaustelle - AkD 45297"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.689336416,51.619845153],[7.6893954,51.619656401],[7.6895107,51.619214501],[7.6896358,51.618701001],[7.6897735,51.617952001],[7.6898074,51.617783401],[7.6898901,51.617291001],[7.6899856,51.616443801],[7.690026,51.615879001],[7.6900539,51.615323901],[7.6900488,51.614450601],[7.6900354,51.614042401],[7.6899845,51.613339001],[7.6898746,51.612448501],[7.6897401,51.611661801],[7.68971365,51.611538029]]}},{"identifier":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de15","icon":"123","isBlocked":"false","future":false,"extent":"51.64704884560705,7.684814477868672,51.670273905468626,7.6814584739701015","point":"51.64704884560705,7.684814477868672","startLcPosition":"108","impact":{"lower":"Fuchseggen","upper":"Haus Reck","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Haus Reck - Fuchseggen","startTimestamp":"2026-08-31T20:00:00+02:00","coordinate":{"lat":51.64704884560705,"long":7.684814477868672},"description":["Zeitraum dieser Bauphase:","Beginn: 31.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 15.01.27)","","A1: Dortmund -> Münster, zwischen 3.0 km hinter Haus Reck und 0.4 km vor Fuchseggen","","Länge: 2.6 km | Maximale Durchfahrtsbreite: 6.05 m","","A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.684814478,51.647048846],[7.684779,51.647215701],[7.6846185,51.647904401],[7.684414,51.648837101],[7.6842585,51.649589301],[7.6841358,51.650182801],[7.6840453,51.650605101],[7.6840178,51.650748901],[7.6838883,51.651457801],[7.6837144,51.652495901],[7.6836197,51.653096901],[7.6835069,51.653894401],[7.6834069,51.654686801],[7.6833527,51.655151101],[7.6833046,51.655596101],[7.6832381,51.656273401],[7.6830206,51.659226701],[7.6829551,51.660087601],[7.6828454,51.661524701],[7.6827849,51.662246501],[7.6827036,51.663081201],[7.6826898,51.663253601],[7.6825507,51.664389001],[7.6824323,51.665392601],[7.6823509,51.665874501],[7.6822741,51.666356601],[7.6822404,51.666529701],[7.6820635,51.667556501],[7.6817261,51.669120001],[7.6816862,51.669308801],[7.6815143,51.670058101],[7.681458474,51.670273905]]}},{"identifier":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de13","icon":"123","isBlocked":"false","future":false,"extent":"51.64015720119295,7.685748685857195,51.64704884560706,7.68481447786867","point":"51.64015720119295,7.685748685857195","startLcPosition":"108","impact":{"lower":"Hamm/Bergkamen","upper":"Haus Reck","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Haus Reck - Hamm/Bergkamen","startTimestamp":"2026-08-31T20:00:00+02:00","coordinate":{"lat":51.64015720119295,"long":7.685748685857195},"description":["Zeitraum dieser Bauphase:","Beginn: 31.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 15.01.27)","","A1: Dortmund -> Münster, zwischen 2.2 km hinter Haus Reck und 0.7 km vor AS Hamm/Bergkamen","","Länge: 0.77 km | Maximale Durchfahrtsbreite: 6.05 m","","A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.685748686,51.640157201],[7.6857415,51.640334101],[7.6857015,51.640915801],[7.6856662,51.641606701],[7.6856027,51.642309701],[7.6855258,51.643011201],[7.6854411,51.643715901],[7.6853491,51.644312101],[7.6852419,51.644908601],[7.6850145,51.646108101],[7.684814478,51.647048846]]}},{"identifier":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de27","icon":"123","isBlocked":"false","future":false,"extent":"51.669820709066265,7.681378112089916,51.64659619439044,7.684714765021656","point":"51.669820709066265,7.681378112089916","startLcPosition":"110","impact":{"lower":"Haus Reck","upper":"Fuchseggen","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Fuchseggen - Haus Reck","startTimestamp":"2026-08-31T20:00:00+02:00","coordinate":{"lat":51.669820709066265,"long":7.681378112089916},"description":["Zeitraum dieser Bauphase:","Beginn: 31.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 15.01.27)","","A1: Münster -> Dortmund, zwischen 0.4 km hinter Fuchseggen und 3.0 km vor Haus Reck","","Länge: 2.59 km | Maximale Durchfahrtsbreite: 6.05 m","","A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.681378112,51.669820709],[7.6815173,51.669221001],[7.6815399,51.669106101],[7.6815573,51.669028401],[7.6818696,51.667540301],[7.6820701,51.666494401],[7.6820984,51.666317601],[7.6821899,51.665681701],[7.6822689,51.665163901],[7.6823709,51.664366801],[7.6824992,51.663236901],[7.6827471,51.660043901],[7.6828032,51.659209601],[7.682879,51.658164101],[7.6828938,51.657959301],[7.6830295,51.656186801],[7.6831855,51.654876101],[7.6832755,51.654152901],[7.6833137,51.653888701],[7.6835065,51.652537901],[7.683618,51.651887101],[7.6836549,51.651672501],[7.6837202,51.651325001],[7.6838321,51.650730001],[7.684066,51.649545401],[7.68459,51.647177801],[7.684714765,51.646596194]]}},{"identifier":"2023-004481--vi-bs.2026-07-09_05-00-00-000.devi-zus.2025-01-20_19-00-00-000.f.de19","icon":"123","isBlocked":"false","future":false,"extent":"51.69286652944935,7.669679787065142,51.69828876523717,7.6659199361824415","point":"51.69286652944935,7.669679787065142","startLcPosition":"111","impact":{"lower":"Hasenkämpe","upper":"An der Landwehr","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","SEPARATE","CLOSED","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | An der Landwehr - Hasenkämpe","startTimestamp":"2026-07-09T05:00:00+02:00","coordinate":{"lat":51.69286652944935,"long":7.669679787065142},"description":["Zeitraum dieser Bauphase:","Beginn: 09.07.26 um 05:00 Uhr","Ende: 15.12.26 um 05:00 Uhr","(Ende der Gesamtmaßnahme: 22.12.26)","","A1: Dortmund -> Münster, zwischen 2.1 km hinter An der Landwehr und 5.7 km vor Hasenkämpe","","Länge: 0.66 km | Maximale Durchfahrtsbreite: 5.85 m","","A1 - Ersatzneubau BW Nordlippestraße - AlD 4481"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.669679787,51.692866529],[7.6695527,51.693039301],[7.6691676,51.693573101],[7.6688734,51.693981501],[7.6685827,51.694384501],[7.6676998,51.695641801],[7.6676582,51.695702501],[7.6674405,51.696028101],[7.6669201,51.696795001],[7.6665711,51.697295001],[7.6660509,51.698083301],[7.665919936,51.698288765]]}},{"identifier":"2023-004481--vi-bs.2026-07-09_05-00-00-000.devi-zus.2025-01-20_19-00-00-000.f.de21","icon":"123","isBlocked":"false","future":false,"extent":"51.68334086015654,7.676151675800074,51.69286652944935,7.669679787065142","point":"51.68334086015654,7.676151675800074","startLcPosition":"111","impact":{"lower":"Hamm-Bockum/Werne","upper":"An der Landwehr","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | An der Landwehr - Hamm-Bockum/Werne","startTimestamp":"2026-07-09T05:00:00+02:00","coordinate":{"lat":51.68334086015654,"long":7.676151675800074},"description":["Zeitraum dieser Bauphase:","Beginn: 09.07.26 um 05:00 Uhr","Ende: 15.12.26 um 05:00 Uhr","(Ende der Gesamtmaßnahme: 22.12.26)","","A1: Dortmund -> Münster, zwischen 0.9 km hinter An der Landwehr und 0.4 km vor AS Hamm-Bockum/Werne","","Länge: 1.15 km | Maximale Durchfahrtsbreite: 6.25 m","","A1 - Ersatzneubau BW Nordlippestraße - AlD 4481"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.676151676,51.68334086],[7.675777,51.684007701],[7.6750353,51.685216601],[7.6741765,51.686579601],[7.6737937,51.687146201],[7.6733803,51.687772101],[7.6726708,51.688773601],[7.6719845,51.689729601],[7.6714061,51.690526101],[7.6705112,51.691737801],[7.6702601,51.692074501],[7.6701929,51.692164701],[7.6700306,51.692389601],[7.669679787,51.692866529]]}},{"identifier":"2026-045834--vi-bs.2026-09-20_22-00-00-000.devi-bs.2026-09-15_09-00-00-000_001.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.70279733671484,7.663150140910347,51.70831872348487,7.660130114667653","point":"51.70279733671484,7.663150140910347","startLcPosition":"112","impact":{"lower":"Hasenkämpe","upper":"Hamm-Bockum/Werne","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Hamm-Bockum/Werne - Hasenkämpe","coordinate":{"lat":51.70279733671484,"long":7.663150140910347},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","20.09.26 22:00 bis zum 21.09.26 06:00 Uhr.","","A1: Dortmund -> Münster, zwischen 0.8 km hinter AS Hamm-Bockum/Werne und 4.6 km vor Hasenkämpe","","Länge: 0.65 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7 m","","A1 - Beschilderungsarbeiten - AkD 45834"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.663150141,51.702797337],[7.6629487,51.703141801],[7.6627832,51.703419901],[7.6609876,51.706617001],[7.660130115,51.708318723]]}},{"identifier":"2026-045834--vi-bs.2026-09-15_09-00-00-000.devi-bs.2026-09-15_09-00-00-000_001.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.70279733671484,7.663150140910347,51.70831872348487,7.660130114667653","point":"51.70279733671484,7.663150140910347","startLcPosition":"112","impact":{"lower":"Hasenkämpe","upper":"Hamm-Bockum/Werne","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Hamm-Bockum/Werne - Hasenkämpe","coordinate":{"lat":51.70279733671484,"long":7.663150140910347},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 09:00 bis 15:00 Uhr","","A1: Dortmund -> Münster, zwischen 0.8 km hinter AS Hamm-Bockum/Werne und 4.6 km vor Hasenkämpe","","Länge: 0.65 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7 m","","A1 - Beschilderungsarbeiten - AkD 45834"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.663150141,51.702797337],[7.6629487,51.703141801],[7.6627832,51.703419901],[7.6609876,51.706617001],[7.660130115,51.708318723]]}},{"identifier":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de25","icon":"123","isBlocked":"false","future":false,"extent":"51.67728790155803,7.678910068573603,51.669820709066265,7.681378112089916","point":"51.67728790155803,7.678910068573603","startLcPosition":"112","impact":{"lower":"Hamm/Bergkamen","upper":"Hamm-Bockum/Werne","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Hamm-Bockum/Werne - Hamm/Bergkamen","startTimestamp":"2026-08-31T20:00:00+02:00","coordinate":{"lat":51.67728790155803,"long":7.678910068573603},"description":["Zeitraum dieser Bauphase:","Beginn: 31.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 15.01.27)","","A1: Münster -> Dortmund, zwischen 2.2 km hinter AS Hamm-Bockum/Werne und 1.9 km vor AS Hamm/Bergkamen","","Länge: 0.85 km | Maximale Durchfahrtsbreite: 6.05 m","","A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.678910069,51.677287902],[7.6795555,51.675639601],[7.6797456,51.675198601],[7.6802548,51.673759201],[7.6807061,51.672327601],[7.6809138,51.671653301],[7.6813313,51.670022401],[7.681378112,51.669820709]]}},{"identifier":"2023-004481--vi-bs.2026-07-09_05-00-00-000.devi-zus.2025-01-20_19-00-00-000.f.de17","icon":"123","isBlocked":"false","future":false,"extent":"51.69824605625505,7.665746629606675,51.6928177208904,7.669507818597219","point":"51.69824605625505,7.665746629606675","startLcPosition":"113","impact":{"lower":"An der Landwehr","upper":"Hasenkämpe","symbols":["CLOSED","BORDER_LEFT","CLOSED","CLOSED","SEPARATE","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Hasenkämpe - An der Landwehr","startTimestamp":"2026-07-09T05:00:00+02:00","coordinate":{"lat":51.69824605625505,"long":7.665746629606675},"description":["Zeitraum dieser Bauphase:","Beginn: 09.07.26 um 05:00 Uhr","Ende: 15.12.26 um 05:00 Uhr","(Ende der Gesamtmaßnahme: 22.12.26)","","A1: Münster -> Dortmund, zwischen 5.7 km hinter Hasenkämpe und 2.1 km vor An der Landwehr","","Länge: 0.66 km | Maximale Durchfahrtsbreite: 5.85 m","","A1 - Ersatzneubau BW Nordlippestraße - AlD 4481"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.66574663,51.698246056],[7.6658841,51.698030901],[7.6664031,51.697249601],[7.6672663,51.695980101],[7.6673149,51.695907301],[7.6675299,51.695589501],[7.6689898,51.693523401],[7.669507819,51.692817721]]}},{"identifier":"2023-004481--vi-bs.2026-07-09_05-00-00-000.devi-zus.2025-01-20_19-00-00-000.f.de15","icon":"123","isBlocked":"false","future":false,"extent":"51.706571945242196,7.660844667844122,51.69824605625505,7.665746629606675","point":"51.706571945242196,7.660844667844122","startLcPosition":"113","impact":{"lower":"Hamm-Bockum/Werne","upper":"Hasenkämpe","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Hasenkämpe - Hamm-Bockum/Werne","startTimestamp":"2026-07-09T05:00:00+02:00","coordinate":{"lat":51.706571945242196,"long":7.660844667844122},"description":["Zeitraum dieser Bauphase:","Beginn: 09.07.26 um 05:00 Uhr","Ende: 15.12.26 um 05:00 Uhr","(Ende der Gesamtmaßnahme: 22.12.26)","","A1: Münster -> Dortmund, zwischen 4.8 km hinter Hasenkämpe und 0.3 km vor AS Hamm-Bockum/Werne","","Länge: 0.99 km | Maximale Durchfahrtsbreite: 5.85 m","","A1 - Ersatzneubau BW Nordlippestraße - AlD 4481"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.660844668,51.706571945],[7.6622356,51.704078601],[7.6626787,51.703266401],[7.6628351,51.702994601],[7.6637369,51.701456701],[7.6642003,51.700686201],[7.6646759,51.699921801],[7.6653486,51.698869001],[7.66574663,51.698246056]]}},{"identifier":"2023-004425--vi-bs.2026-08-20_20-00-00-000.devi-zus.2023-03-20_19-00-00-000_019.f.de47","icon":"123","isBlocked":"false","future":false,"extent":"51.826443112811155,7.604093823258132,51.83195236543628,7.596632422305212","point":"51.826443112811155,7.604093823258132","startLcPosition":"119","impact":{"lower":"Davert","upper":"Hohe Heide","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Hohe Heide - Davert","startTimestamp":"2026-08-20T20:00:00+02:00","coordinate":{"lat":51.826443112811155,"long":7.604093823258132},"description":["Zeitraum dieser Bauphase:","Beginn: 20.08.26 um 20:00 Uhr","Ende: 20.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 07.12.26)","","A1: Dortmund -> Münster, zwischen 1.9 km hinter Hohe Heide und 1.1 km vor Davert","","Länge: 0.8 km | Maximale Durchfahrtsbreite: 5.85 m","","A1 - 6-streifige Ausbau zwischen Ascheberg und Hiltrup - AlD 4425"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.604093823,51.826443113],[7.596632422,51.831952365]]}},{"identifier":"2023-004425--vi-bs.2026-08-20_20-00-00-000.devi-zus.2023-03-20_19-00-00-000_019.f.de49","icon":"123","isBlocked":"false","future":false,"extent":"51.83195236543628,7.596632422305212,51.878329689045955,7.576329117698251","point":"51.83195236543628,7.596632422305212","startLcPosition":"119","impact":{"lower":"Münster-Hiltrup","upper":"Hohe Heide","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Dortmund -> Münster","title":"A1 | Hohe Heide - Münster-Hiltrup","startTimestamp":"2026-08-20T20:00:00+02:00","coordinate":{"lat":51.83195236543628,"long":7.596632422305212},"description":["Zeitraum dieser Bauphase:","Beginn: 20.08.26 um 20:00 Uhr","Ende: 20.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 07.12.26)","","A1: Dortmund -> Münster, zwischen 2.7 km hinter Hohe Heide und 1.0 km vor AS Münster-Hiltrup","","Länge: 5.5 km | Maximale Durchfahrtsbreite: 5.85 m","","A1 - 6-streifige Ausbau zwischen Ascheberg und Hiltrup - AlD 4425"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.596632422,51.831952365],[7.5963513,51.832159901],[7.5950638,51.833163501],[7.5947816,51.833381701],[7.5921947,51.835500401],[7.5907575,51.836792201],[7.5892257,51.838251901],[7.5874352,51.840139101],[7.5865048,51.841155401],[7.58564,51.842182301],[7.5848276,51.843176401],[7.5836109,51.844716601],[7.5834888,51.844896501],[7.5832234,51.845287501],[7.582132,51.846892801],[7.5808493,51.849087801],[7.5808271,51.849125801],[7.5796293,51.851426501],[7.5787448,51.853383101],[7.5784071,51.854182101],[7.5776504,51.856280501],[7.5772212,51.857740001],[7.5769721,51.858773301],[7.5766322,51.860453601],[7.5763992,51.861684701],[7.5763213,51.862311901],[7.5761921,51.863352701],[7.5760281,51.866129001],[7.576033,51.866646601],[7.576054,51.868883801],[7.5762018,51.871184701],[7.5762956,51.872645501],[7.5763709,51.874964401],[7.5763672,51.875214501],[7.5763684,51.875610001],[7.5763723,51.876360101],[7.576351,51.877691701],[7.576329118,51.878329689]]}},{"identifier":"2023-004425--vi-bs.2026-08-20_20-00-00-000.devi-zus.2023-03-20_19-00-00-000_019.f.de45","icon":"123","isBlocked":"false","future":false,"extent":"51.88882498528408,7.574096209757649,51.83049287747098,7.598317858510259","point":"51.88882498528408,7.574096209757649","startLcPosition":"123","impact":{"lower":"Hohe Heide","upper":"Münster-Süd","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Münster -> Dortmund","title":"A1 | Münster-Süd - Hohe Heide","startTimestamp":"2026-08-20T20:00:00+02:00","coordinate":{"lat":51.88882498528408,"long":7.574096209757649},"description":["Zeitraum dieser Bauphase:","Beginn: 20.08.26 um 20:00 Uhr","Ende: 20.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 07.12.26)","","A1: Münster -> Dortmund, zwischen 3.1 km hinter AK Münster-Süd und 2.5 km vor Hohe Heide","","Länge: 6.88 km | Maximale Durchfahrtsbreite: 7.25 m","","A1 - 6-streifige Ausbau zwischen Ascheberg und Hiltrup - AlD 4425"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.57409621,51.888824985],[7.5744998,51.887322601],[7.5749933,51.885462901],[7.5751752,51.884621101],[7.575304,51.884025501],[7.5754262,51.883460101],[7.5756958,51.881864501],[7.5758354,51.880981101],[7.5759192,51.880120801],[7.5759744,51.879483901],[7.5760337,51.878731401],[7.5760659,51.878253801],[7.5761786,51.876353901],[7.576192,51.875607501],[7.5761996,51.875203101],[7.576193,51.874952301],[7.5761838,51.874599801],[7.576123,51.872602801],[7.5760291,51.871190501],[7.5758728,51.868841201],[7.5758313,51.866651201],[7.575821,51.866107701],[7.5760367,51.863342001],[7.5761493,51.862309501],[7.576218,51.861679301],[7.5764423,51.860405601],[7.576753,51.858758801],[7.5770575,51.857723401],[7.5774865,51.856264501],[7.5782058,51.854155701],[7.5785491,51.853353101],[7.57942,51.851388901],[7.5806538,51.849111501],[7.5806876,51.849053001],[7.581953,51.846864201],[7.5833307,51.844857801],[7.5836969,51.844324401],[7.5848155,51.842918501],[7.5858209,51.841684101],[7.5863597,51.841081701],[7.5871726,51.840137501],[7.588486,51.838767601],[7.5889773,51.838275701],[7.5899778,51.837311201],[7.5906677,51.836620601],[7.5921049,51.835328901],[7.5945733,51.833357801],[7.5948354,51.833147501],[7.5962614,51.832003401],[7.598317859,51.830492877]]}},{"identifier":"2026-045779--vi-bs.2026-09-15_09-00-00-000.devi-bs.2026-09-15_09-00-00-000.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.01044471468095,7.580048999248286,51.92989745123265,7.553940109761247","point":"52.01044471468095,7.580048999248286","startLcPosition":"126","impact":{"lower":"Münster-Süd","upper":"Sandrup","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Dortmund","title":"A1 | Sandrup - Münster-Süd","coordinate":{"lat":52.01044471468095,"long":7.580048999248286},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 09:00 bis 15:00 Uhr","","A1: Osnabrück -> Dortmund, zwischen 2.9 km hinter Sandrup und 1.7 km vor AK Münster-Süd","","Länge: 9.58 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m","","A1 - Beschilderungsarbeiten - Wanderbaustelle - AkD 45779"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.580048999,52.010444715],[7.579629,52.010093301],[7.5791864,52.009716001],[7.5784126,52.009040801],[7.5776736,52.008372101],[7.5772619,52.007988301],[7.5766718,52.007431001],[7.5762682,52.007038201],[7.575611,52.006383401],[7.575033,52.005790701],[7.574506,52.005234201],[7.5741814,52.004882501],[7.5741103,52.004806601],[7.5734693,52.004094101],[7.5727424,52.003252001],[7.5721818,52.002577501],[7.5715984,52.001854201],[7.5714053,52.001611501],[7.5706811,52.000690101],[7.5702131,52.000084001],[7.569501,51.999179101],[7.5680338,51.997400101],[7.5668673,51.996106601],[7.5664387,51.995631301],[7.5650315,51.994209401],[7.5638607,51.993096901],[7.5630414,51.992349101],[7.5609616,51.990504801],[7.5592164,51.988922701],[7.5588937,51.988615301],[7.5579762,51.987707101],[7.5572028,51.986916201],[7.5561657,51.985789901],[7.5552636,51.984760501],[7.5551512,51.984629101],[7.5542866,51.983576501],[7.5538091,51.982966801],[7.5522055,51.980722201],[7.5518328,51.980152201],[7.5513786,51.979446701],[7.5509575,51.978734701],[7.5501409,51.977302801],[7.5497113,51.976484301],[7.5492127,51.975468301],[7.548747,51.974447001],[7.5484295,51.973688001],[7.5481278,51.972928801],[7.5478336,51.972126701],[7.5475269,51.971224301],[7.5472641,51.970358501],[7.5470274,51.969491801],[7.546895,51.968992701],[7.5467531,51.968374601],[7.5466031,51.967694201],[7.5465285,51.967325401],[7.5463428,51.966280901],[7.5462965,51.965952101],[7.5462475,51.965636901],[7.5462093,51.965326601],[7.5461657,51.964999801],[7.5461322,51.964678301],[7.5460839,51.964202401],[7.5460121,51.963261501],[7.5460096,51.963221001],[7.5459686,51.962273701],[7.5459572,51.961791101],[7.5459559,51.961310101],[7.5459599,51.960825001],[7.5459713,51.960504801],[7.5460733,51.958697601],[7.5461639,51.957789401],[7.5465089,51.955505901],[7.5467445,51.954253801],[7.5470909,51.952631101],[7.5476727,51.950151501],[7.547761,51.949774501],[7.5481097,51.948284501],[7.5489286,51.945329501],[7.5494103,51.943591301],[7.5496461,51.942753001],[7.5500792,51.941285501],[7.5502017,51.940890701],[7.5503646,51.940353101],[7.5513131,51.937399701],[7.5516133,51.936480601],[7.5516499,51.936374001],[7.5519937,51.935391001],[7.5524799,51.933933601],[7.5531419,51.932081401],[7.5533739,51.931432201],[7.5536761,51.930569801],[7.55394011,51.929897451]]}},{"identifier":"2026-045779--vi-bs.2026-09-15_09-00-00-000.devi-bs.2026-09-15_09-00-00-000.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.01044471468095,7.580048999248286,51.92989745123265,7.553940109761247","point":"52.01044471468095,7.580048999248286","startLcPosition":"126","impact":{"lower":"Münster-Süd","upper":"Sandrup","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Dortmund","title":"A1 | Sandrup - Münster-Süd","coordinate":{"lat":52.01044471468095,"long":7.580048999248286},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 09:00 bis 15:00 Uhr","","A1: Osnabrück -> Dortmund, zwischen 2.9 km hinter Sandrup und 1.7 km vor AK Münster-Süd","","Länge: 9.58 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m","","A1 - Beschilderungsarbeiten - Wanderbaustelle - AkD 45779"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.580048999,52.010444715],[7.579629,52.010093301],[7.5791864,52.009716001],[7.5784126,52.009040801],[7.5776736,52.008372101],[7.5772619,52.007988301],[7.5766718,52.007431001],[7.5762682,52.007038201],[7.575611,52.006383401],[7.575033,52.005790701],[7.574506,52.005234201],[7.5741814,52.004882501],[7.5741103,52.004806601],[7.5734693,52.004094101],[7.5727424,52.003252001],[7.5721818,52.002577501],[7.5715984,52.001854201],[7.5714053,52.001611501],[7.5706811,52.000690101],[7.5702131,52.000084001],[7.569501,51.999179101],[7.5680338,51.997400101],[7.5668673,51.996106601],[7.5664387,51.995631301],[7.5650315,51.994209401],[7.5638607,51.993096901],[7.5630414,51.992349101],[7.5609616,51.990504801],[7.5592164,51.988922701],[7.5588937,51.988615301],[7.5579762,51.987707101],[7.5572028,51.986916201],[7.5561657,51.985789901],[7.5552636,51.984760501],[7.5551512,51.984629101],[7.5542866,51.983576501],[7.5538091,51.982966801],[7.5522055,51.980722201],[7.5518328,51.980152201],[7.5513786,51.979446701],[7.5509575,51.978734701],[7.5501409,51.977302801],[7.5497113,51.976484301],[7.5492127,51.975468301],[7.548747,51.974447001],[7.5484295,51.973688001],[7.5481278,51.972928801],[7.5478336,51.972126701],[7.5475269,51.971224301],[7.5472641,51.970358501],[7.5470274,51.969491801],[7.546895,51.968992701],[7.5467531,51.968374601],[7.5466031,51.967694201],[7.5465285,51.967325401],[7.5463428,51.966280901],[7.5462965,51.965952101],[7.5462475,51.965636901],[7.5462093,51.965326601],[7.5461657,51.964999801],[7.5461322,51.964678301],[7.5460839,51.964202401],[7.5460121,51.963261501],[7.5460096,51.963221001],[7.5459686,51.962273701],[7.5459572,51.961791101],[7.5459559,51.961310101],[7.5459599,51.960825001],[7.5459713,51.960504801],[7.5460733,51.958697601],[7.5461639,51.957789401],[7.5465089,51.955505901],[7.5467445,51.954253801],[7.5470909,51.952631101],[7.5476727,51.950151501],[7.547761,51.949774501],[7.5481097,51.948284501],[7.5489286,51.945329501],[7.5494103,51.943591301],[7.5496461,51.942753001],[7.5500792,51.941285501],[7.5502017,51.940890701],[7.5503646,51.940353101],[7.5513131,51.937399701],[7.5516133,51.936480601],[7.5516499,51.936374001],[7.5519937,51.935391001],[7.5524799,51.933933601],[7.5531419,51.932081401],[7.5533739,51.931432201],[7.5536761,51.930569801],[7.55394011,51.929897451]]}},{"identifier":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de11","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.08225842434876,7.641813182288144,52.08399478502048,7.64410566196061","point":"52.08225842434876,7.641813182288144","startLcPosition":"129","impact":{"lower":"Maestruper Brook","upper":"Klaterberg","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Osnabrück","title":"A1 | Klaterberg - Maestruper Brook","coordinate":{"lat":52.08225842434876,"long":7.641813182288144},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.","17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.","18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.","","A1: Münster -> Osnabrück, zwischen 2.0 km hinter Klaterberg und 1.3 km vor Maestruper Brook","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Bauwerksarbeiten - AkD 45186"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.641813182,52.082258424],[7.6423734,52.082700901],[7.6435681,52.083599401],[7.644105662,52.083994785]]}},{"identifier":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de9","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.08225842434876,7.641813182288144,52.08399478502048,7.64410566196061","point":"52.08225842434876,7.641813182288144","startLcPosition":"129","impact":{"lower":"Maestruper Brook","upper":"Klaterberg","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Osnabrück","title":"A1 | Klaterberg - Maestruper Brook","coordinate":{"lat":52.08225842434876,"long":7.641813182288144},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.","17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.","18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.","","A1: Münster -> Osnabrück, zwischen 2.0 km hinter Klaterberg und 1.3 km vor Maestruper Brook","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Bauwerksarbeiten - AkD 45186"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.641813182,52.082258424],[7.6423734,52.082700901],[7.6435681,52.083599401],[7.644105662,52.083994785]]}},{"identifier":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de15","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.085760844577464,7.64636949879491,52.0839007938296,7.643737770311976","point":"52.085760844577464,7.64636949879491","startLcPosition":"131","impact":{"lower":"Klaterberg","upper":"Maestruper Brook","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Münster","title":"A1 | Maestruper Brook - Klaterberg","coordinate":{"lat":52.085760844577464,"long":7.64636949879491},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.","17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.","18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.","","A1: Osnabrück -> Münster, zwischen 1.1 km hinter Maestruper Brook und 2.3 km vor Klaterberg","","Länge: 0.27 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Bauwerksarbeiten - AkD 45186"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.646369499,52.085760845],[7.6458662,52.085423401],[7.6440623,52.084138601],[7.64373777,52.083900794]]}},{"identifier":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de13","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.085760844577464,7.64636949879491,52.0839007938296,7.643737770311976","point":"52.085760844577464,7.64636949879491","startLcPosition":"131","impact":{"lower":"Klaterberg","upper":"Maestruper Brook","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Münster","title":"A1 | Maestruper Brook - Klaterberg","coordinate":{"lat":52.085760844577464,"long":7.64636949879491},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.","17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.","18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.","","A1: Osnabrück -> Münster, zwischen 1.1 km hinter Maestruper Brook und 2.3 km vor Klaterberg","","Länge: 0.27 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Bauwerksarbeiten - AkD 45186"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.646369499,52.085760845],[7.6458662,52.085423401],[7.6440623,52.084138601],[7.64373777,52.083900794]]}},{"identifier":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.11947550648156,7.707587277113918,52.12169082070541,7.710090784576314","point":"52.11947550648156,7.707587277113918","startLcPosition":"133","impact":{"lower":"Mühlenbach","upper":"Flughafen Münster/Osnabrück","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Osnabrück","title":"A1 | Flughafen Münster/Osnabrück - Mühlenbach","coordinate":{"lat":52.11947550648156,"long":7.707587277113918},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.","17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.","18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.","","A1: Münster -> Osnabrück, zwischen 0.8 km hinter AS Flughafen Münster/Osnabrück und 1.4 km vor Mühlenbach","","Länge: 0.3 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Bauwerksarbeiten - AkD 45186"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.707587277,52.119475506],[7.7087745,52.120508701],[7.7096655,52.121299901],[7.710090785,52.121690821]]}},{"identifier":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.11947550648156,7.707587277113918,52.12169082070541,7.710090784576314","point":"52.11947550648156,7.707587277113918","startLcPosition":"133","impact":{"lower":"Mühlenbach","upper":"Flughafen Münster/Osnabrück","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Osnabrück","title":"A1 | Flughafen Münster/Osnabrück - Mühlenbach","coordinate":{"lat":52.11947550648156,"long":7.707587277113918},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.","17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.","18.09.26 20:00 bis zum 19.09.26 05:15 Uhr.","","A1: Münster -> Osnabrück, zwischen 0.8 km hinter AS Flughafen Münster/Osnabrück und 1.4 km vor Mühlenbach","","Länge: 0.3 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Bauwerksarbeiten - AkD 45186"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.707587277,52.119475506],[7.7087745,52.120508701],[7.7096655,52.121299901],[7.710090785,52.121690821]]}},{"identifier":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de7","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.12253118365363,7.710678580519501,52.12030979915083,7.708197525212113","point":"52.12253118365363,7.710678580519501","startLcPosition":"134","impact":{"lower":"Flughafen Münster/Osnabrück","upper":"Mühlenbach","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Münster","title":"A1 | Mühlenbach - Flughafen Münster/Osnabrück","coordinate":{"lat":52.12253118365363,"long":7.710678580519501},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.","17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.","18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.","","A1: Osnabrück -> Münster, zwischen 1.3 km hinter Mühlenbach und 0.9 km vor AS Flughafen Münster/Osnabrück","","Länge: 0.3 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Bauwerksarbeiten - AkD 45186"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.710678581,52.122531184],[7.7096396,52.121588101],[7.7087411,52.120791701],[7.708197525,52.120309799]]}},{"identifier":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de5","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.12253118365363,7.710678580519501,52.12030979915083,7.708197525212113","point":"52.12253118365363,7.710678580519501","startLcPosition":"134","impact":{"lower":"Flughafen Münster/Osnabrück","upper":"Mühlenbach","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Münster","title":"A1 | Mühlenbach - Flughafen Münster/Osnabrück","coordinate":{"lat":52.12253118365363,"long":7.710678580519501},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.","17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.","18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.","","A1: Osnabrück -> Münster, zwischen 1.3 km hinter Mühlenbach und 0.9 km vor AS Flughafen Münster/Osnabrück","","Länge: 0.3 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Bauwerksarbeiten - AkD 45186"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.710678581,52.122531184],[7.7096396,52.121588101],[7.7087411,52.120791701],[7.708197525,52.120309799]]}},{"identifier":"2026-046260--vi-bs.2026-09-17_19-00-00-000_002.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.21074070687227,7.847166732950783,52.22904719360707,7.87683474990104","point":"52.21074070687227,7.847166732950783","startLcPosition":"143","impact":{"lower":"Tecklenburger Land","upper":"Bashake","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Münster -> Osnabrück","title":"A1 | Bashake - Tecklenburger Land","coordinate":{"lat":52.21074070687227,"long":7.847166732950783},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","17.09.26 19:00 bis zum 18.09.26 05:00 Uhr.","","A1: Münster -> Osnabrück, zwischen 1.0 km hinter Bashake und 0.5 km vor Tecklenburger Land","","Länge: 3 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 6.6 m","","A1 - Markierungsarbeiten - AkD 46260"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.847166733,52.210740707],[7.8472825,52.210759601],[7.8485149,52.210984101],[7.8494701,52.211159501],[7.850919,52.211457201],[7.8522737,52.211782801],[7.8533046,52.212053101],[7.8547892,52.212483101],[7.8558189,52.212796801],[7.8567307,52.213088501],[7.8585086,52.213730901],[7.8593944,52.214077401],[7.8602758,52.214432001],[7.8614664,52.214978401],[7.8620747,52.215270101],[7.8626565,52.215552401],[7.8631835,52.215818301],[7.8645995,52.216618501],[7.8656738,52.217248701],[7.867196,52.218222701],[7.8684005,52.219108301],[7.8697416,52.220161001],[7.8707129,52.221053301],[7.8714591,52.221757901],[7.872388,52.222719301],[7.8728142,52.223201701],[7.8732605,52.223747301],[7.8736688,52.224273601],[7.8740762,52.224802101],[7.8744721,52.225387701],[7.8749161,52.226048901],[7.8762141,52.228134101],[7.87683475,52.229047194]]}},{"identifier":"2025-015114--vi-bs.2024-09-23_14-45-00-000.de0","icon":"123","isBlocked":"false","future":false,"extent":"52.20915902092033,7.835559047155197,52.20823438289215,7.83073493406009","point":"52.20915902092033,7.835559047155197","startLcPosition":"144","impact":{"lower":"Lengerich","upper":"Tecklenburger Land","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Osnabrück -> Münster","title":"A1 | Tecklenburger Land - Lengerich","startTimestamp":"2024-09-23T14:45:00+02:00","coordinate":{"lat":52.20915902092033,"long":7.835559047155197},"description":["Zeitraum dieser Bauphase:","Beginn: 23.09.24 um 14:45 Uhr","Ende: 31.12.26 um 23:00 Uhr","(Ende der Gesamtmaßnahme: 31.12.26)","","A1: Osnabrück -> Münster, zwischen 4.3 km hinter Tecklenburger Land und 1.4 km vor AS Lengerich","","Länge: 0.35 km | Maximale Durchfahrtsbreite: 7.5 m","","A1 - Sonstiges - Parkplatz Exterheide gesperrt - AlD 15114"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.835559047,52.209159021],[7.8334028,52.208780501],[7.8315697,52.208414001],[7.830734934,52.208234383]]}},{"identifier":"2023-004432--vi-bs.2026-02-28_12-00-00-000.devi-zus.2024-11-08_20-00-00-000_004.f.de29","icon":"123","isBlocked":"false","future":false,"extent":"52.33762308826859,8.012213258923957,52.34474918800174,8.024394558021164","point":"52.33762308826859,8.012213258923957","startLcPosition":"149","impact":{"lower":"Wallenhorster Straße","upper":"Hasetal","symbols":["SEPARATE","CLOSED","CLOSED","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Hasetal - Wallenhorster Straße","startTimestamp":"2026-02-28T12:00:00+01:00","coordinate":{"lat":52.33762308826859,"long":8.012213258923957},"description":["Zeitraum dieser Bauphase:","Beginn: 28.02.26 um 12:00 Uhr","Ende: 30.11.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 01.11.27)","","A1: Osnabrück -> Bremen, zwischen 4.2 km hinter Hasetal und 3.0 km vor Wallenhorster Straße","","Länge: 1.15 km | Maximale Durchfahrtsbreite: 6.5 m","","A1 - Ersatzneubau BW AS Osnabrück-Nord-B68 - Wallenhorst - AlD 4432"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.012213259,52.337623088],[8.0123072,52.337658701],[8.0131768,52.338008701],[8.013887,52.338312001],[8.0142842,52.338492301],[8.0147854,52.338720001],[8.0158298,52.339221801],[8.016383,52.339504301],[8.0169243,52.339793601],[8.0179644,52.340366201],[8.0186535,52.340769601],[8.0192654,52.341142801],[8.019863,52.341518901],[8.0204593,52.341898901],[8.0210381,52.342283801],[8.0217448,52.342772001],[8.0224349,52.343264001],[8.0231142,52.343765401],[8.0238489,52.344321001],[8.0239404,52.344390201],[8.024394558,52.344749188]]}},{"identifier":"2026-046537--vi-bs.2026-09-18_20-00-00-000.devi-bs.2026-09-14_20-00-00-000_011.de7","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.35893894986097,8.03796250973876,52.38181108509293,8.0432128897534","point":"52.35893894986097,8.03796250973876","startLcPosition":"150","impact":{"lower":"Bramsche","upper":"Osnabrück-Nord","symbols":["SEPARATE","CLOSED","CLOSED","CLOSED","BORDER_RIGHT","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Osnabrück-Nord - Bramsche","coordinate":{"lat":52.35893894986097,"long":8.03796250973876},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.","","A1: Osnabrück -> Bremen, zwischen 2.3 km hinter AS Osnabrück-Nord und 1.5 km vor AS Bramsche","","Länge: 2.6 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Fahrbahninstandsetzung - AkD 46537"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.03796251,52.35893895],[8.0388316,52.360216501],[8.0394197,52.361150301],[8.0403294,52.362737801],[8.0406998,52.363466701],[8.041158,52.364367001],[8.0418412,52.365941101],[8.0421676,52.366810901],[8.0427704,52.368469501],[8.0429335,52.368999801],[8.0431925,52.369946501],[8.0434603,52.371278801],[8.0438268,52.373425201],[8.0439801,52.375870001],[8.0438472,52.378065001],[8.0435047,52.380515501],[8.04321289,52.381811085]]}},{"identifier":"2026-044946--vi-fbm.2026-08-14_20-00-00-000.devi-zus.2026-08-14_20-00-00-000_006.de5","icon":"warnkegel","isBlocked":"false","future":false,"extent":"52.34605331994314,8.026010318686724,52.36926447460236,8.043005908822487","point":"52.34605331994314,8.026010318686724","startLcPosition":"150","impact":{"lower":"Bramsche","upper":"Osnabrück-Nord","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Osnabrück-Nord - Bramsche","coordinate":{"lat":52.34605331994314,"long":8.026010318686724},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 20:00 bis zum 15.09.26 05:00 Uhr.","17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.","","A1: Osnabrück -> Bremen, zwischen 0.6 km hinter AS Osnabrück-Nord und 2.9 km vor AS Bramsche","","Länge: 2.85 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.75 m","","A1 - Auf- oder Abbau Verkehrsführung - Wanderbaustelle - AkD 44946"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.026010319,52.34605332],[8.0261903,52.346201001],[8.0274237,52.347258901],[8.0293076,52.348973701],[8.0317577,52.351365001],[8.0337778,52.353574301],[8.0355232,52.355641401],[8.0375078,52.358270501],[8.0388316,52.360216501],[8.0394197,52.361150301],[8.0403294,52.362737801],[8.0406998,52.363466701],[8.041158,52.364367001],[8.0418412,52.365941101],[8.0421676,52.366810901],[8.0427704,52.368469501],[8.0429335,52.368999801],[8.043005909,52.369264475]]}},{"identifier":"2025-055308--vi-bs.2026-09-15_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de84","icon":"123","isBlocked":"false","future":true,"extent":"52.3657457651354,8.0417564165269,52.36926447460236,8.043005908822487","point":"52.3657457651354,8.0417564165269","startLcPosition":"150","impact":{"lower":"Bramsche","upper":"Osnabrück-Nord","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Osnabrück-Nord - Bramsche","startTimestamp":"2026-09-15T06:00:00+02:00","coordinate":{"lat":52.3657457651354,"long":8.0417564165269},"description":["Zeitraum dieser Bauphase:","Beginn: 15.09.26 um 06:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 24.09.26)","","A1: Osnabrück -> Bremen, zwischen 3.1 km hinter AS Osnabrück-Nord und 2.9 km vor AS Bramsche","","Länge: 0.4 km | Maximale Durchfahrtsbreite: 7 m","","A1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.041756417,52.365745765],[8.0418412,52.365941101],[8.0421676,52.366810901],[8.0427704,52.368469501],[8.0429335,52.368999801],[8.043005909,52.369264475]]}},{"identifier":"2025-055308--vi-bs.2026-09-15_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de82","icon":"123","isBlocked":"false","future":true,"extent":"52.3622960525851,8.04007625391459,52.3657457651354,8.0417564165269","point":"52.3622960525851,8.04007625391459","startLcPosition":"150","impact":{"lower":"Wallenhorster Straße","upper":"Osnabrück-Nord","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Osnabrück-Nord - Wallenhorster Straße","startTimestamp":"2026-09-15T06:00:00+02:00","coordinate":{"lat":52.3622960525851,"long":8.04007625391459},"description":["Zeitraum dieser Bauphase:","Beginn: 15.09.26 um 06:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 24.09.26)","","A1: Osnabrück -> Bremen, zwischen 2.7 km hinter AS Osnabrück-Nord und 0.4 km vor Wallenhorster Straße","","Länge: 0.4 km | Maximale Durchfahrtsbreite: 7 m","","A1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.040076254,52.362296053],[8.0403294,52.362737801],[8.0406998,52.363466701],[8.041158,52.364367001],[8.041756417,52.365745765]]}},{"identifier":"2025-055308--vi-bs.2026-09-15_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de80","icon":"123","isBlocked":"false","future":true,"extent":"52.3622960525851,8.04007625391459,52.3657457651354,8.0417564165269","point":"52.3622960525851,8.04007625391459","startLcPosition":"150","impact":{"lower":"Wallenhorster Straße","upper":"Osnabrück-Nord","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Osnabrück-Nord - Wallenhorster Straße","startTimestamp":"2026-09-15T06:00:00+02:00","coordinate":{"lat":52.3622960525851,"long":8.04007625391459},"description":["Zeitraum dieser Bauphase:","Beginn: 15.09.26 um 06:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 24.09.26)","","A1: Osnabrück -> Bremen, zwischen 2.7 km hinter AS Osnabrück-Nord und 0.4 km vor Wallenhorster Straße","","Länge: 0.4 km | Maximale Durchfahrtsbreite: 7.25 m","","A1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.040076254,52.362296053],[8.0403294,52.362737801],[8.0406998,52.363466701],[8.041158,52.364367001],[8.041756417,52.365745765]]}},{"identifier":"2023-004432--vi-bs.2026-02-28_12-00-00-000.devi-zus.2024-11-08_20-00-00-000_004.f.de31","icon":"123","isBlocked":"false","future":false,"extent":"52.34571923275478,8.025318680892486,52.34004740577678,8.01705108847287","point":"52.34571923275478,8.025318680892486","startLcPosition":"151","impact":{"lower":"Hasetal","upper":"Wallenhorster Straße","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Wallenhorster Straße - Hasetal","startTimestamp":"2026-02-28T12:00:00+01:00","coordinate":{"lat":52.34571923275478,"long":8.025318680892486},"description":["Zeitraum dieser Bauphase:","Beginn: 28.02.26 um 12:00 Uhr","Ende: 30.11.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 01.11.27)","","A1: Bremen -> Osnabrück, zwischen 2.9 km hinter Wallenhorster Straße und 4.6 km vor Hasetal","","Länge: 0.85 km | Maximale Durchfahrtsbreite: 9.5 m","","A1 - Ersatzneubau BW AS Osnabrück-Nord-B68 - Wallenhorst - AlD 4432"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.025318681,52.345719233],[8.0246644,52.345186401],[8.0235969,52.344345401],[8.0229296,52.343843501],[8.0222561,52.343346401],[8.0215647,52.342855501],[8.0208605,52.342371201],[8.0202987,52.341995501],[8.0197199,52.341621601],[8.0191236,52.341247001],[8.018518,52.340881201],[8.0178088,52.340467401],[8.017051088,52.340047406]]}},{"identifier":"2026-046622--vi-bs.2026-09-17_20-00-00-000_003.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.36796718336731,8.042369971608863,52.364476958446694,8.040929025344948","point":"52.36796718336731,8.042369971608863","startLcPosition":"151","impact":{"lower":"Osnabrück-Nord","upper":"Wallenhorster Straße","symbols":["SEPARATE","CLOSED","CLOSED","CLOSED","BORDER_RIGHT","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Wallenhorster Straße - Osnabrück-Nord","coordinate":{"lat":52.36796718336731,"long":8.042369971608863},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.","","A1: Bremen -> Osnabrück, zwischen 0.1 km hinter Wallenhorster Straße und 2.9 km vor AS Osnabrück-Nord","","Länge: 0.4 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Fahrbahninstandsetzung - AkD 46622"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.042369972,52.367967183],[8.04174,52.366258301],[8.040929025,52.364476958]]}},{"identifier":"2026-044946--vi-fbm.2026-08-21_20-00-00-000.devi-zus.2026-08-14_20-00-00-000_006.de15","icon":"warnkegel","isBlocked":"false","future":false,"extent":"52.376432682226245,8.043692751185779,52.365775833782216,8.041520345205518","point":"52.376432682226245,8.043692751185779","startLcPosition":"152","impact":{"lower":"Osnabrück-Nord","upper":"Bramsche","symbols":["SEPARATE","CLOSED","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Bramsche - Osnabrück-Nord","coordinate":{"lat":52.376432682226245,"long":8.043692751185779},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","21.09.26 20:00 bis zum 22.09.26 05:00 Uhr.","24.09.26 20:00 bis zum 25.09.26 05:00 Uhr.","","A1: Bremen -> Osnabrück, zwischen 2.1 km hinter AS Bramsche und 3.1 km vor AS Osnabrück-Nord","","Länge: 1.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4.25 m","","A1 - Auf- oder Abbau Verkehrsführung - Wanderbaustelle - AkD 44946"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.043692751,52.376432682],[8.04372,52.375845001],[8.0436659,52.375133201],[8.0436536,52.374791701],[8.0435683,52.373431701],[8.0432265,52.371235301],[8.0426558,52.368887701],[8.0425156,52.368362201],[8.04174,52.366258301],[8.041520345,52.365775834]]}},{"identifier":"2025-055308--vi-bs.2026-09-22_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de90","icon":"123","isBlocked":"false","future":true,"extent":"52.3692887237778,8.042753284154797,52.365775833782216,8.041520345205518","point":"52.3692887237778,8.042753284154797","startLcPosition":"152","impact":{"lower":"Osnabrück-Nord","upper":"Bramsche","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Bramsche - Osnabrück-Nord","startTimestamp":"2026-09-22T06:00:00+02:00","coordinate":{"lat":52.3692887237778,"long":8.042753284154797},"description":["Zeitraum dieser Bauphase:","Beginn: 22.09.26 um 06:00 Uhr","Ende: 24.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 24.09.26)","","A1: Bremen -> Osnabrück, zwischen 2.9 km hinter AS Bramsche und 3.1 km vor AS Osnabrück-Nord","","Länge: 0.4 km | Maximale Durchfahrtsbreite: 7 m","","A1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.042753284,52.369288724],[8.0426558,52.368887701],[8.0425156,52.368362201],[8.04174,52.366258301],[8.041520345,52.365775834]]}},{"identifier":"2025-055308--vi-bs.2026-09-22_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de88","icon":"123","isBlocked":"false","future":true,"extent":"52.37285207569615,8.043478096531734,52.3692887237778,8.042753284154797","point":"52.37285207569615,8.043478096531734","startLcPosition":"152","impact":{"lower":"Wallenhorster Straße","upper":"Bramsche","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Bramsche - Wallenhorster Straße","startTimestamp":"2026-09-22T06:00:00+02:00","coordinate":{"lat":52.37285207569615,"long":8.043478096531734},"description":["Zeitraum dieser Bauphase:","Beginn: 22.09.26 um 06:00 Uhr","Ende: 24.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 24.09.26)","","A1: Bremen -> Osnabrück, zwischen 2.5 km hinter AS Bramsche und Wallenhorster Straße","","Länge: 0.4 km | Maximale Durchfahrtsbreite: 7 m","","A1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.043478097,52.372852076],[8.0432265,52.371235301],[8.042753284,52.369288724]]}},{"identifier":"2025-055308--vi-bs.2026-09-22_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de86","icon":"123","isBlocked":"false","future":true,"extent":"52.37285207569615,8.043478096531734,52.3692887237778,8.042753284154797","point":"52.37285207569615,8.043478096531734","startLcPosition":"152","impact":{"lower":"Wallenhorster Straße","upper":"Bramsche","symbols":["SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Bramsche - Wallenhorster Straße","startTimestamp":"2026-09-22T06:00:00+02:00","coordinate":{"lat":52.37285207569615,"long":8.043478096531734},"description":["Zeitraum dieser Bauphase:","Beginn: 22.09.26 um 06:00 Uhr","Ende: 24.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 24.09.26)","","A1: Bremen -> Osnabrück, zwischen 2.5 km hinter AS Bramsche und Wallenhorster Straße","","Länge: 0.4 km | Maximale Durchfahrtsbreite: 7.25 m","","A1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.043478097,52.372852076],[8.0432265,52.371235301],[8.042753284,52.369288724]]}},{"identifier":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de33","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.4770451104463,8.059535374515796,52.479043441071326,8.061249102924704","point":"52.4770451104463,8.059535374515796","startLcPosition":"153","impact":{"lower":"Neuenkirchen/Vörden","upper":"Bramsche","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Bramsche - Neuenkirchen/Vörden","coordinate":{"lat":52.4770451104463,"long":8.059535374515796},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 15:30 bis 17:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 6.7 km hinter Bramsche und 2.0 km vor AS Neuenkirchen/Vörden","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.059535375,52.47704511],[8.0601522,52.477779601],[8.061249103,52.479043441]]}},{"identifier":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de27","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.43953615795763,8.035224320463659,52.441715620936435,8.036111801859732","point":"52.43953615795763,8.035224320463659","startLcPosition":"153","impact":{"lower":"Neuenkirchen/Vörden","upper":"Bramsche","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Bramsche - Neuenkirchen/Vörden","coordinate":{"lat":52.43953615795763,"long":8.035224320463659},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 11:30 bis 13:30 Uhr","","A1: Osnabrück -> Bremen, zwischen 2.2 km hinter Bramsche und 6.5 km vor AS Neuenkirchen/Vörden","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.03522432,52.439536158],[8.0357737,52.440919701],[8.036111802,52.441715621]]}},{"identifier":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de21","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.467821749065834,8.052180801410579,52.46986026490104,8.053728054748326","point":"52.467821749065834,8.052180801410579","startLcPosition":"153","impact":{"lower":"Neuenkirchen/Vörden","upper":"Bramsche","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Bramsche - Neuenkirchen/Vörden","coordinate":{"lat":52.467821749065834,"long":8.052180801410579},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 06:00 bis 09:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 5.5 km hinter Bramsche und 3.2 km vor AS Neuenkirchen/Vörden","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.052180801,52.467821749],[8.0528956,52.468784401],[8.0535805,52.469667401],[8.053728055,52.469860265]]}},{"identifier":"2026-046162--vi-bs.2026-09-17_07-00-00-000.devi-zus.2026-09-16_11-30-00-000.de7","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.459993780882485,8.046598845241398,52.462072067844154,8.047999790149573","point":"52.459993780882485,8.046598845241398","startLcPosition":"153","impact":{"lower":"Neuenkirchen/Vörden","upper":"Bramsche","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Bramsche - Neuenkirchen/Vörden","coordinate":{"lat":52.459993780882485,"long":8.046598845241398},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","17.09.26 von 10:30 bis 12:30 Uhr","","A1: Osnabrück -> Bremen, zwischen 4.6 km hinter Bramsche und 4.1 km vor AS Neuenkirchen/Vörden","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.75 m","","A1 - Arbeiten an Schutzeinrichtungen - AkD 46162"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.046598845,52.459993781],[8.0468756,52.460400801],[8.04799979,52.462072068]]}},{"identifier":"2026-046162--vi-bs.2026-09-17_07-00-00-000.devi-zus.2026-09-16_11-30-00-000.de5","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.41869375563816,8.03093568527358,52.41644686563918,8.03102933383197","point":"52.41869375563816,8.03093568527358","startLcPosition":"153","impact":{"lower":"Bramsche","upper":"Bramsche","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Bramsche - Bramsche","coordinate":{"lat":52.41869375563816,"long":8.03093568527358},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","17.09.26 von 07:00 bis 10:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 0.2 km hinter Bramsche und 2.5 km vor AS Bramsche","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.75 m","","A1 - Arbeiten an Schutzeinrichtungen - AkD 46162"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.030935685,52.418693756],[8.0309566,52.417907301],[8.0309677,52.417570001],[8.0309986,52.416912901],[8.031029334,52.416446866]]}},{"identifier":"2026-046537--vi-bs.2026-09-16_20-00-00-000.devi-bs.2026-09-14_20-00-00-000_011.de5","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.40131121510004,8.035084509438882,52.38402648679156,8.042528956701258","point":"52.40131121510004,8.035084509438882","startLcPosition":"153","impact":{"lower":"Wallenhorster Straße","upper":"Bramsche","symbols":["SEPARATE","CLOSED","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Bramsche - Wallenhorster Straße","coordinate":{"lat":52.40131121510004,"long":8.035084509438882},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.","","A1: Bremen -> Osnabrück, zwischen 2.1 km hinter Bramsche und 1.7 km vor Wallenhorster Straße","","Länge: 1.99 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Fahrbahninstandsetzung - AkD 46537"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.035084509,52.401311215],[8.0357571,52.399778201],[8.0364786,52.398230901],[8.036643,52.397878401],[8.03768,52.395691901],[8.0385941,52.393771401],[8.0387253,52.393476701],[8.0392371,52.392337201],[8.0404018,52.389744201],[8.0407351,52.388957401],[8.0415236,52.386987801],[8.042528957,52.384026487]]}},{"identifier":"2026-046537--vi-bs.2026-09-15_20-00-00-000.devi-bs.2026-09-14_20-00-00-000_011.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.41016968439139,8.031975857255178,52.39362055924443,8.038661254722461","point":"52.41016968439139,8.031975857255178","startLcPosition":"153","impact":{"lower":"Wallenhorster Straße","upper":"Bramsche","symbols":["SEPARATE","CLOSED","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Bramsche - Wallenhorster Straße","coordinate":{"lat":52.41016968439139,"long":8.031975857255178},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 20:00 bis zum 16.09.26 05:00 Uhr.","","A1: Bremen -> Osnabrück, zwischen 1.1 km hinter Bramsche und 2.8 km vor Wallenhorster Straße","","Länge: 1.9 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Fahrbahninstandsetzung - AkD 46537"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.031975857,52.410169684],[8.0320557,52.409834501],[8.0321674,52.409399201],[8.0322801,52.408959301],[8.0324975,52.408190201],[8.0327752,52.407283701],[8.0332605,52.405826501],[8.0335119,52.405121101],[8.033633,52.404798401],[8.0338619,52.404188501],[8.0339311,52.404004201],[8.0341913,52.403375001],[8.0343924,52.402888601],[8.0357571,52.399778201],[8.0364786,52.398230901],[8.036643,52.397878401],[8.03768,52.395691901],[8.0385941,52.393771401],[8.038661255,52.393620559]]}},{"identifier":"2026-046537--vi-bs.2026-09-14_20-00-00-000.devi-bs.2026-09-14_20-00-00-000_011.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.41016968439139,8.031975857255178,52.39497055445502,8.03802334900865","point":"52.41016968439139,8.031975857255178","startLcPosition":"153","impact":{"lower":"Bramsche","upper":"Bramsche","symbols":["SEPARATE","CLOSED","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Bramsche - Bramsche","coordinate":{"lat":52.41016968439139,"long":8.031975857255178},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 20:00 bis zum 15.09.26 05:00 Uhr.","","A1: Bremen -> Osnabrück, zwischen 1.1 km hinter Bramsche und AS Bramsche","","Länge: 1.74 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Fahrbahninstandsetzung - AkD 46537"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.031975857,52.410169684],[8.0320557,52.409834501],[8.0321674,52.409399201],[8.0322801,52.408959301],[8.0324975,52.408190201],[8.0327752,52.407283701],[8.0332605,52.405826501],[8.0335119,52.405121101],[8.033633,52.404798401],[8.0338619,52.404188501],[8.0339311,52.404004201],[8.0341913,52.403375001],[8.0343924,52.402888601],[8.0357571,52.399778201],[8.0364786,52.398230901],[8.036643,52.397878401],[8.03768,52.395691901],[8.038023349,52.394970554]]}},{"identifier":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de31","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.4791078268145,8.061050588569746,52.477109016451536,8.059331692515757","point":"52.4791078268145,8.061050588569746","startLcPosition":"154","impact":{"lower":"Bramsche","upper":"Neuenkirchen/Vörden","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Neuenkirchen/Vörden - Bramsche","coordinate":{"lat":52.4791078268145,"long":8.061050588569746},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 15:30 bis 17:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 2.0 km hinter AS Neuenkirchen/Vörden und 6.7 km vor Bramsche","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.061050589,52.479107827],[8.0599912,52.477891901],[8.059331693,52.477109016]]}},{"identifier":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de25","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.441750485514234,8.035896525141832,52.43957176088368,8.034985830260057","point":"52.441750485514234,8.035896525141832","startLcPosition":"154","impact":{"lower":"Bramsche","upper":"Neuenkirchen/Vörden","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Neuenkirchen/Vörden - Bramsche","coordinate":{"lat":52.441750485514234,"long":8.035896525141832},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 11:30 bis 13:30 Uhr","","A1: Bremen -> Osnabrück, zwischen 6.5 km hinter AS Neuenkirchen/Vörden und 2.2 km vor Bramsche","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.035896525,52.441750486],[8.035561,52.440993401],[8.03498583,52.439571761]]}},{"identifier":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de19","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.46992132468243,8.053516496133229,52.46788308738538,8.051960503829662","point":"52.46992132468243,8.053516496133229","startLcPosition":"154","impact":{"lower":"Bramsche","upper":"Neuenkirchen/Vörden","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Neuenkirchen/Vörden - Bramsche","coordinate":{"lat":52.46992132468243,"long":8.053516496133229},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 06:00 bis 09:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 3.2 km hinter AS Neuenkirchen/Vörden und 5.5 km vor Bramsche","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.053516496,52.469921325],[8.0531764,52.469484401],[8.0519897,52.467922101],[8.051960504,52.467883087]]}},{"identifier":"2026-046162--vi-bs.2026-09-16_11-30-00-000.devi-zus.2026-09-16_11-30-00-000.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.465588699790906,8.05025910703976,52.463529533782875,8.048784941322124","point":"52.465588699790906,8.05025910703976","startLcPosition":"154","impact":{"lower":"Bramsche","upper":"Neuenkirchen/Vörden","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Neuenkirchen/Vörden - Bramsche","coordinate":{"lat":52.465588699790906,"long":8.05025910703976},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 von 14:00 bis 16:30 Uhr","","A1: Bremen -> Osnabrück, zwischen 3.7 km hinter AS Neuenkirchen/Vörden und 5.0 km vor Bramsche","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.75 m","","A1 - Arbeiten an Schutzeinrichtungen - AkD 46162"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.050259107,52.4655887],[8.048784941,52.463529534]]}},{"identifier":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de29","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.441750485514234,8.035896525141832,52.43957176088368,8.034985830260057","point":"52.441750485514234,8.035896525141832","startLcPosition":"154","impact":{"lower":"Bramsche","upper":"Neuenkirchen/Vörden","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Neuenkirchen/Vörden - Bramsche","coordinate":{"lat":52.441750485514234,"long":8.035896525141832},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 14:00 bis 15:30 Uhr","","A1: Bremen -> Osnabrück, zwischen 6.5 km hinter AS Neuenkirchen/Vörden und 2.2 km vor Bramsche","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.035896525,52.441750486],[8.035561,52.440993401],[8.03498583,52.439571761]]}},{"identifier":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de23","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.46992132468243,8.053516496133229,52.46788308738538,8.051960503829662","point":"52.46992132468243,8.053516496133229","startLcPosition":"154","impact":{"lower":"Bramsche","upper":"Neuenkirchen/Vörden","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Neuenkirchen/Vörden - Bramsche","coordinate":{"lat":52.46992132468243,"long":8.053516496133229},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","15.09.26 von 09:30 bis 11:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 3.2 km hinter AS Neuenkirchen/Vörden und 5.5 km vor Bramsche","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.053516496,52.469921325],[8.0531764,52.469484401],[8.0519897,52.467922101],[8.051960504,52.467883087]]}},{"identifier":"2026-046162--vi-bs.2026-09-17_07-00-00-000.devi-zus.2026-09-16_11-30-00-000.de11","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.56934176360487,8.111178329698784,52.571581429755824,8.110728501617475","point":"52.56934176360487,8.111178329698784","startLcPosition":"155","impact":{"lower":"Fladderlohhausen","upper":"Dammer Berge","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Dammer Berge - Fladderlohhausen","coordinate":{"lat":52.56934176360487,"long":8.111178329698784},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","17.09.26 von 15:30 bis 17:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 3.2 km hinter Dammer Berge und 0.5 km vor Fladderlohhausen","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8.5 m","","A1 - Arbeiten an Schutzeinrichtungen - AkD 46162"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.11117833,52.569341764],[8.110728502,52.57158143]]}},{"identifier":"2026-046162--vi-bs.2026-09-17_07-00-00-000.devi-zus.2026-09-16_11-30-00-000.de9","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.55998306325471,8.113103087293359,52.56220817058262,8.112675243302078","point":"52.55998306325471,8.113103087293359","startLcPosition":"155","impact":{"lower":"Fladderlohhausen","upper":"Dammer Berge","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Dammer Berge - Fladderlohhausen","coordinate":{"lat":52.55998306325471,"long":8.113103087293359},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","17.09.26 von 13:00 bis 15:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 2.2 km hinter Dammer Berge und 1.5 km vor Fladderlohhausen","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8.5 m","","A1 - Arbeiten an Schutzeinrichtungen - AkD 46162"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.113103087,52.559983063],[8.1130786,52.560140201],[8.1129834,52.560613301],[8.1129413,52.560871301],[8.112675243,52.562208171]]}},{"identifier":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de17","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.57984647709708,8.109791050797543,52.582090180300035,8.10982921243119","point":"52.57984647709708,8.109791050797543","startLcPosition":"156","impact":{"lower":"Holdorf","upper":"Fladderlohhausen","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Fladderlohhausen - Holdorf","coordinate":{"lat":52.57984647709708,"long":8.109791050797543},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 14:30 bis 17:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 0.4 km hinter Fladderlohhausen und 1.7 km vor AS Holdorf","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.109791051,52.579846477],[8.1097818,52.580870001],[8.109829212,52.58209018]]}},{"identifier":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de13","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.582090180300035,8.10982921243119,52.5843412335163,8.109984941011371","point":"52.582090180300035,8.10982921243119","startLcPosition":"156","impact":{"lower":"Holdorf","upper":"Fladderlohhausen","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Fladderlohhausen - Holdorf","coordinate":{"lat":52.582090180300035,"long":8.10982921243119},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 12:30 bis 14:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 0.7 km hinter Fladderlohhausen und 1.4 km vor AS Holdorf","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.109829212,52.58209018],[8.1098727,52.583209301],[8.109984941,52.584341234]]}},{"identifier":"2026-044915--vi-bs.2026-09-16_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de35","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.595666752008434,8.113111226450432,52.5978272822888,8.114181315353733","point":"52.595666752008434,8.113111226450432","startLcPosition":"156","impact":{"lower":"Langwege-Ost","upper":"Fladderlohhausen","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Fladderlohhausen - Langwege-Ost","coordinate":{"lat":52.595666752008434,"long":8.113111226450432},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 von 06:00 bis 09:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 2.2 km hinter Fladderlohhausen und 2.0 km vor Langwege-Ost","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.113111226,52.595666752],[8.1131864,52.595838501],[8.1134382,52.596384901],[8.1135921,52.596720601],[8.114181315,52.597827282]]}},{"identifier":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de15","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.58209350177177,8.109608216337387,52.57984627167429,8.109555813823642","point":"52.58209350177177,8.109608216337387","startLcPosition":"157","impact":{"lower":"Fladderlohhausen","upper":"Holdorf","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Holdorf - Fladderlohhausen","coordinate":{"lat":52.58209350177177,"long":8.109608216337387},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 14:30 bis 17:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 1.7 km hinter AS Holdorf und 0.4 km vor Fladderlohhausen","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.109608216,52.582093502],[8.109562,52.581072601],[8.109555814,52.579846272]]}},{"identifier":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de11","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.584349211406334,8.109766238062871,52.58209350177177,8.109608216337387","point":"52.584349211406334,8.109766238062871","startLcPosition":"157","impact":{"lower":"Fladderlohhausen","upper":"Holdorf","symbols":["BREAKDOWN_LANE","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Holdorf - Fladderlohhausen","coordinate":{"lat":52.584349211406334,"long":8.109766238062871},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 12:30 bis 14:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 1.4 km hinter AS Holdorf und 0.7 km vor Fladderlohhausen","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.109766238,52.584349211],[8.1096619,52.583279301],[8.109608216,52.582093502]]}},{"identifier":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de7","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.60935691021895,8.122333490004248,52.61131803180184,8.124129314137777","point":"52.60935691021895,8.122333490004248","startLcPosition":"157","impact":{"lower":"Langwege-Ost","upper":"Holdorf","symbols":["ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Holdorf - Langwege-Ost","coordinate":{"lat":52.60935691021895,"long":8.122333490004248},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 08:30 bis 10:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 1.5 km hinter AS Holdorf und 0.3 km vor Langwege-Ost","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.12233349,52.60935691],[8.1232019,52.610349101],[8.124129314,52.611318032]]}},{"identifier":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de5","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.6113825460931,8.123946634794535,52.609419918620944,8.122140901375031","point":"52.6113825460931,8.123946634794535","startLcPosition":"158","impact":{"lower":"Holdorf","upper":"Langwege-Ost","symbols":["ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Langwege-Ost - Holdorf","coordinate":{"lat":52.6113825460931,"long":8.123946634794535},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 08:30 bis 10:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 0.3 km hinter Langwege-Ost und 1.5 km vor AS Holdorf","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.123946635,52.611382546],[8.1229805,52.610365201],[8.122140901,52.609419919]]}},{"identifier":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de9","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.60459181569556,8.118172240574777,52.60210790744965,8.116440540749592","point":"52.60459181569556,8.118172240574777","startLcPosition":"158","impact":{"lower":"Holdorf","upper":"Langwege-Ost","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Langwege-Ost - Holdorf","coordinate":{"lat":52.60459181569556,"long":8.118172240574777},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 10:30 bis 12:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 1.2 km hinter Langwege-Ost und 0.6 km vor AS Holdorf","","Länge: 0.3 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.118172241,52.604591816],[8.1169624,52.602891501],[8.116440541,52.602107907]]}},{"identifier":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.639986288550965,8.151229996436438,52.642016297035354,8.152822545942263","point":"52.639986288550965,8.151229996436438","startLcPosition":"159","impact":{"lower":"Lohne/Dinklage","upper":"Langwege-West","symbols":["ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Langwege-West - Lohne/Dinklage","coordinate":{"lat":52.639986288550965,"long":8.151229996436438},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 06:00 bis 08:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 3.3 km hinter Langwege-West und 1.8 km vor AS Lohne/Dinklage","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.151229996,52.639986289],[8.1513633,52.640145901],[8.1527003,52.641858801],[8.152822546,52.642016297]]}},{"identifier":"2026-046162--vi-bs.2026-09-18_07-30-00-000.devi-zus.2026-09-16_11-30-00-000.de13","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.622876764599084,8.135533562986952,52.62479813579478,8.137449382045249","point":"52.622876764599084,8.135533562986952","startLcPosition":"159","impact":{"lower":"Lohne/Dinklage","upper":"Langwege-West","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Langwege-West - Lohne/Dinklage","coordinate":{"lat":52.622876764599084,"long":8.135533562986952},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","18.09.26 von 07:30 bis 10:30 Uhr","","A1: Osnabrück -> Bremen, zwischen 1.1 km hinter Langwege-West und 4.0 km vor AS Lohne/Dinklage","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8.5 m","","A1 - Arbeiten an Schutzeinrichtungen - AkD 46162"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.135533563,52.622876765],[8.1359003,52.623244301],[8.137449382,52.624798136]]}},{"identifier":"2026-046162--vi-bs.2026-09-16_11-30-00-000.devi-zus.2026-09-16_11-30-00-000.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.636146297959854,8.147993499812289,52.638142988815254,8.149690536635676","point":"52.636146297959854,8.147993499812289","startLcPosition":"159","impact":{"lower":"Lohne/Dinklage","upper":"Langwege-West","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Langwege-West - Lohne/Dinklage","coordinate":{"lat":52.636146297959854,"long":8.147993499812289},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 von 11:30 bis 13:30 Uhr","","A1: Osnabrück -> Bremen, zwischen 2.8 km hinter Langwege-West und 2.3 km vor AS Lohne/Dinklage","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8.5 m","","A1 - Arbeiten an Schutzeinrichtungen - AkD 46162"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.1479935,52.636146298],[8.1495361,52.637958101],[8.149690537,52.638142989]]}},{"identifier":"2026-044915--vi-bs.2026-09-16_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de37","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.63574722287069,8.147653739767932,52.637742725067646,8.14935271775229","point":"52.63574722287069,8.147653739767932","startLcPosition":"159","impact":{"lower":"Lohne/Dinklage","upper":"Langwege-West","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Langwege-West - Lohne/Dinklage","coordinate":{"lat":52.63574722287069,"long":8.147653739767932},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 von 09:30 bis 11:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 2.7 km hinter Langwege-West und 2.3 km vor AS Lohne/Dinklage","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.14765374,52.635747223],[8.149352718,52.637742725]]}},{"identifier":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.642070824338745,8.152629672345562,52.64005154598139,8.151014569865415","point":"52.642070824338745,8.152629672345562","startLcPosition":"160","impact":{"lower":"Langwege-West","upper":"Lohne/Dinklage","symbols":["ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Lohne/Dinklage - Langwege-West","coordinate":{"lat":52.642070824338745,"long":8.152629672345562},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 06:00 bis 08:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 1.8 km hinter AS Lohne/Dinklage und 3.3 km vor Langwege-West","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m","","A1 - Arbeiten an Schutzeinrichtung - AkD 44915"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.152629672,52.642070824],[8.1525231,52.641929601],[8.15101457,52.640051546]]}},{"identifier":"2023-004447--vi-bs.2026-09-11_19-00-00-000.devi-zus.2024-05-02_19-00-00-000_018.f.de175","icon":"123","isBlocked":"false","future":false,"extent":"52.7145860136506,8.172925738573374,52.750939998834085,8.180734332852621","point":"52.7145860136506,8.172925738573374","startLcPosition":"161","impact":{"lower":"Cappeln Hagelage-Ost","upper":"Bakumer Wiesen","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Bakumer Wiesen - Cappeln Hagelage-Ost","startTimestamp":"2026-09-11T19:00:00+02:00","coordinate":{"lat":52.7145860136506,"long":8.172925738573374},"description":["Zeitraum dieser Bauphase:","Beginn: 11.09.26 um 19:00 Uhr","Ende: 30.10.26 um 19:00 Uhr","(Ende der Gesamtmaßnahme: 30.10.26)","","A1: Osnabrück -> Bremen, zwischen 0.3 km hinter Bakumer Wiesen und 3.7 km vor Cappeln Hagelage-Ost","","Länge: 4.1 km | Max. 120 km/h | Maximale Durchfahrtsbreite: 10.75 m","","A1 - 6 Brückenersatzneubauten - AlD 4447"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.172925739,52.714586014],[8.1729207,52.714772801],[8.1728903,52.716776401],[8.1728845,52.717465901],[8.172887,52.717867301],[8.1729153,52.720676201],[8.1729807,52.722447501],[8.1731501,52.725199901],[8.1732781,52.726549701],[8.1734995,52.728487201],[8.1741477,52.732441301],[8.1743015,52.733228101],[8.1746492,52.734785601],[8.1748436,52.735569701],[8.1751323,52.736694201],[8.1755168,52.738063401],[8.1758053,52.739002301],[8.1762569,52.740401501],[8.1769301,52.742311601],[8.1771991,52.743035601],[8.1776056,52.744062701],[8.1780274,52.745088001],[8.1783294,52.745805901],[8.1788238,52.746930001],[8.1795105,52.748424801],[8.1799962,52.749451701],[8.1807098,52.750892301],[8.180734333,52.750939999]]}},{"identifier":"2026-044910--vi-bs.2026-09-21_19-00-00-000.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.67160635468142,8.16936041950305,52.63659919194348,8.148162466784635","point":"52.67160635468142,8.16936041950305","startLcPosition":"161","impact":{"lower":"Langwege-West","upper":"Bakumer Wiesen","symbols":["SEPARATE","CLOSED","CLOSED","CLOSED","BORDER_RIGHT","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Bakumer Wiesen - Langwege-West","coordinate":{"lat":52.67160635468142,"long":8.16936041950305},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","21.09.26 19:00 bis zum 22.09.26 06:00 Uhr.","22.09.26 19:00 bis zum 23.09.26 06:00 Uhr.","","A1: Bremen -> Osnabrück, zwischen 4.5 km hinter Bakumer Wiesen und 2.8 km vor Langwege-West","","Länge: 4.17 km | Maximale Durchfahrtsbreite: 3.25 m","","A1  - Fahrbahninstandhaltung - AkD 44910"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.16936042,52.671606355],[8.1692015,52.671121901],[8.1687256,52.669784601],[8.1682232,52.668449601],[8.1679107,52.667629101],[8.1675734,52.666805401],[8.166949,52.665339401],[8.166308,52.663895001],[8.165708,52.662606001],[8.1654891,52.662155401],[8.1651418,52.661444101],[8.1650719,52.661308101],[8.1641959,52.659608801],[8.1635761,52.658444401],[8.1630255,52.657457101],[8.1626763,52.656840001],[8.16213,52.655890401],[8.1612894,52.654477401],[8.1604678,52.653140701],[8.1592248,52.651265701],[8.1580934,52.649483701],[8.1578512,52.649157501],[8.1570037,52.647919501],[8.1568347,52.647680901],[8.1544572,52.644492401],[8.1525231,52.641929601],[8.1495751,52.638259301],[8.148162467,52.636599192]]}},{"identifier":"2023-004447--vi-bs.2026-09-11_19-00-00-000.devi-zus.2024-05-02_19-00-00-000_018.f.de177","icon":"123","isBlocked":"false","future":false,"extent":"52.77466851084272,8.194549640402776,52.79444222524447,8.204405048507388","point":"52.77466851084272,8.194549640402776","startLcPosition":"162","impact":{"lower":"Cloppenburg","upper":"Vechta","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Vechta - Cloppenburg","startTimestamp":"2026-09-11T19:00:00+02:00","coordinate":{"lat":52.77466851084272,"long":8.194549640402776},"description":["Zeitraum dieser Bauphase:","Beginn: 11.09.26 um 19:00 Uhr","Ende: 30.10.26 um 19:00 Uhr","(Ende der Gesamtmaßnahme: 30.10.26)","","A1: Osnabrück -> Bremen, zwischen 5.7 km hinter AS Vechta und 2.1 km vor AS Cloppenburg","","Länge: 2.3 km | Max. 120 km/h | Maximale Durchfahrtsbreite: 10.75 m","","A1 - 6 Brückenersatzneubauten - AlD 4447"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.19454964,52.774668511],[8.1950843,52.775583601],[8.1965443,52.778186601],[8.1970188,52.779044401],[8.1974698,52.779876401],[8.1984592,52.781750101],[8.1989469,52.782693801],[8.1998104,52.784391801],[8.2008382,52.786495101],[8.2018434,52.788601201],[8.2028259,52.790765201],[8.2038098,52.793013501],[8.204405049,52.794442225]]}},{"identifier":"2023-004447--vi-bs.2026-09-11_19-00-00-000.devi-zus.2024-05-02_19-00-00-000_018.f.de181","icon":"123","isBlocked":"false","future":false,"extent":"52.759718834823325,8.185348049023899,52.72716295636291,8.173123031257726","point":"52.759718834823325,8.185348049023899","startLcPosition":"163","impact":{"lower":"Vechta","upper":"Cappeln Hagelage-Ost","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Cappeln Hagelage-Ost - Vechta","startTimestamp":"2026-09-11T19:00:00+02:00","coordinate":{"lat":52.759718834823325,"long":8.185348049023899},"description":["Zeitraum dieser Bauphase:","Beginn: 11.09.26 um 19:00 Uhr","Ende: 30.10.26 um 19:00 Uhr","(Ende der Gesamtmaßnahme: 30.10.26)","","A1: Bremen -> Osnabrück, zwischen 2.6 km hinter Cappeln Hagelage-Ost und 0.2 km vor AS Vechta","","Länge: 3.73 km | Max. 120 km/h | Maximale Durchfahrtsbreite: 10.75 m","","A1 - 6 Brückenersatzneubauten - AlD 4447"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.185348049,52.759718835],[8.1849617,52.759066301],[8.1842883,52.757899301],[8.1840204,52.757441801],[8.1833973,52.756341301],[8.1827837,52.755237801],[8.1817903,52.753417701],[8.1813951,52.752672201],[8.180869,52.751664501],[8.1804956,52.750928101],[8.1797817,52.749483501],[8.1792904,52.748462001],[8.1786007,52.746954401],[8.178111,52.745835701],[8.1778042,52.745111801],[8.1773859,52.744086001],[8.1769791,52.743060801],[8.176709,52.742337201],[8.1760329,52.740415301],[8.1755808,52.739012201],[8.1752957,52.738071001],[8.1749114,52.736700001],[8.1746162,52.735577701],[8.1744198,52.734779801],[8.1740753,52.733241501],[8.1739414,52.732479301],[8.1734663,52.729773401],[8.1732964,52.728656501],[8.1732632,52.728391101],[8.173123031,52.727162956]]}},{"identifier":"2026-045929--vi-bs.2026-09-22_09-00-00-000_001.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.803218696588424,8.207763940013175,52.809377886515385,8.209752672745294","point":"52.803218696588424,8.207763940013175","startLcPosition":"164","impact":{"lower":"Cloppenburg","upper":"Cappeln Hagelage-West","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Cappeln Hagelage-West - Cloppenburg","coordinate":{"lat":52.803218696588424,"long":8.207763940013175},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","22.09.26 von 09:00 bis 15:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 2.2 km hinter Cappeln Hagelage-West und 0.4 km vor AS Cloppenburg","","Länge: 0.7 km | Maximale Durchfahrtsbreite: 12 m","","A1 - Vermessungsarbeiten - AkD 45929"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.20776394,52.803218697],[8.2084419,52.805190001],[8.2092593,52.807731101],[8.2095046,52.808549901],[8.2095365,52.808656301],[8.209752673,52.809377887]]}},{"identifier":"2026-046582--vi-bs.2026-09-16_07-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de1","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.816471227674306,8.2117566745376,52.81855746545736,8.212295906638925","point":"52.816471227674306,8.2117566745376","startLcPosition":"165","impact":{"lower":"Drantumer Mühle","upper":"Cloppenburg","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Cloppenburg - Drantumer Mühle","coordinate":{"lat":52.816471227674306,"long":8.2117566745376},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 von 07:00 bis 09:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 0.4 km hinter AS Cloppenburg und 1.2 km vor Drantumer Mühle","","Länge: 0.23 km | Maximale Durchfahrtsbreite: 7.5 m","","A1 Beseitigung Unfallfolgen- Schutzplankenrep."],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.211756675,52.816471228],[8.2118741,52.816946201],[8.2121216,52.817904101],[8.212295907,52.818557465]]}},{"identifier":"2023-004447--vi-bs.2026-09-11_19-00-00-000.devi-zus.2024-05-02_19-00-00-000_018.f.de179","icon":"123","isBlocked":"false","future":false,"extent":"52.80765172794196,8.209007207686371,52.79014800658249,8.202309925790432","point":"52.80765172794196,8.209007207686371","startLcPosition":"165","impact":{"lower":"Cappeln Hagelage-West","upper":"Cloppenburg","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Cloppenburg - Cappeln Hagelage-West","startTimestamp":"2026-09-11T19:00:00+02:00","coordinate":{"lat":52.80765172794196,"long":8.209007207686371},"description":["Zeitraum dieser Bauphase:","Beginn: 11.09.26 um 19:00 Uhr","Ende: 30.10.26 um 19:00 Uhr","(Ende der Gesamtmaßnahme: 30.10.26)","","A1: Bremen -> Osnabrück, zwischen 0.6 km hinter AS Cloppenburg und 0.7 km vor Cappeln Hagelage-West","","Länge: 2 km | Max. 120 km/h | Maximale Durchfahrtsbreite: 10.75 m","","A1 - 6 Brückenersatzneubauten - AlD 4447"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.209007208,52.807651728],[8.2082189,52.805196801],[8.2072176,52.802294201],[8.2062877,52.799753501],[8.2056295,52.798024101],[8.2047904,52.795908501],[8.2035895,52.793036201],[8.2026068,52.790789501],[8.202309926,52.790148007]]}},{"identifier":"2026-046582--vi-bs.2026-09-16_07-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de3","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.857629656615345,8.231657058142732,52.85973481073663,8.233704519628304","point":"52.857629656615345,8.231657058142732","startLcPosition":"169","impact":{"lower":"Engelmannsbäke-Süd","upper":"Ahlhorner Heide","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Ahlhorner Heide - Engelmannsbäke-Süd","coordinate":{"lat":52.857629656615345,"long":8.231657058142732},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 von 09:00 bis 11:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 0.3 km hinter AS Ahlhorner Heide und 3.8 km vor Engelmannsbäke-Süd","","Länge: 0.27 km | Maximale Durchfahrtsbreite: 7.5 m","","A1 Beseitigung Unfallfolgen- Schutzplankenrep."],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.231657058,52.857629657],[8.2328442,52.858877901],[8.2332767,52.859313301],[8.23370452,52.859734811]]}},{"identifier":"2025-045882--vi-bs.2026-09-14_06-00-00-000.devi-zus.2025-11-23_00-00-00-000_001.de73","icon":"123","isBlocked":"false","future":true,"extent":"52.896266253053945,8.329101921625426,52.90844999986266,8.36388314970965","point":"52.896266253053945,8.329101921625426","startLcPosition":"171","impact":{"lower":"Wildeshausen","upper":"Engelmannsbäke-Nord","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Engelmannsbäke-Nord - Wildeshausen","startTimestamp":"2026-09-14T06:00:00+02:00","coordinate":{"lat":52.896266253053945,"long":8.329101921625426},"description":["Zeitraum dieser Bauphase:","Beginn: 14.09.26 um 06:00 Uhr","Ende: 18.09.26 um 18:00 Uhr","(Ende der Gesamtmaßnahme: 18.09.26)","","A1: Osnabrück -> Bremen, zwischen 3.2 km hinter Engelmannsbäke-Nord und 4.2 km vor Wildeshausen","","Länge: 2.72 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 Betonfeldsanierung zw. AD Stuhr und AS Gr. Ippener"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.329101922,52.896266253],[8.3298086,52.896601601],[8.3308106,52.897075101],[8.3319042,52.897579001],[8.3328904,52.898030101],[8.3337605,52.898421601],[8.3350968,52.899001101],[8.3361671,52.899459901],[8.3377061,52.900094701],[8.3396019,52.900869201],[8.3408109,52.901339301],[8.3420058,52.901792601],[8.3454586,52.903060301],[8.347677,52.903822701],[8.3509046,52.904866401],[8.3539992,52.905819001],[8.3564805,52.906524301],[8.3589779,52.907219801],[8.3615749,52.907876601],[8.3637293,52.908414801],[8.36388315,52.90845]]}},{"identifier":"2026-046582--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de16","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.88704155668775,8.29753616572971,52.886593082213295,8.293899599748782","point":"52.88704155668775,8.29753616572971","startLcPosition":"172","impact":{"lower":"Engelmannsbäke-Nord","upper":"Wildeshausen-West","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Wildeshausen-West - Engelmannsbäke-Nord","coordinate":{"lat":52.88704155668775,"long":8.29753616572971},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","18.09.26 von 05:00 bis 06:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 2.8 km hinter AS Wildeshausen-West und 0.6 km vor Engelmannsbäke-Nord","","Länge: 0.25 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 Beseitigung Unfallfolgen- Schutzplankenrep."],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.297536166,52.887041557],[8.2964891,52.886898201],[8.294347,52.886643701],[8.2938996,52.886593082]]}},{"identifier":"2026-046582--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de14","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.90063493919617,8.338690551181664,52.899472047930935,8.335877939630539","point":"52.90063493919617,8.338690551181664","startLcPosition":"173","impact":{"lower":"Wildeshausen-West","upper":"Wildeshausen","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Wildeshausen - Wildeshausen-West","coordinate":{"lat":52.90063493919617,"long":8.338690551181664},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","18.09.26 von 03:00 bis 04:30 Uhr","","A1: Bremen -> Osnabrück, zwischen 6.1 km hinter Wildeshausen und 0.1 km vor AS Wildeshausen-West","","Länge: 0.23 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 Beseitigung Unfallfolgen- Schutzplankenrep."],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.338690551,52.900634939],[8.3375996,52.900194101],[8.3359372,52.899497801],[8.33587794,52.899472048]]}},{"identifier":"2025-042559--vi-bs.2026-08-03_06-00-00-000.devi-zus.2026-02-08_00-00-00-000.de13","icon":"123","isBlocked":"false","future":false,"extent":"52.93789412734659,8.509563028987277,52.985170202158315,8.640606088772609","point":"52.93789412734659,8.509563028987277","startLcPosition":"174","impact":{"lower":"Mackenstedter Heide","upper":"Wildeshausen-Nord","symbols":["CLOSED","BORDER_LEFT","CLOSED","CLOSED","CLOSED","SEPARATE","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Wildeshausen-Nord - Mackenstedter Heide","startTimestamp":"2026-08-03T06:00:00+02:00","coordinate":{"lat":52.93789412734659,"long":8.509563028987277},"description":["Zeitraum dieser Bauphase:","Beginn: 03.08.26 um 06:00 Uhr","Ende: 26.02.27 um 18:00 Uhr","(Ende der Gesamtmaßnahme: 26.02.27)","","A1: Osnabrück -> Bremen, zwischen 4.7 km hinter AS Wildeshausen-Nord und 2.3 km vor Mackenstedter Heide","","Länge: 10.33 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 5.5 m","","A1 Grunderneuerung 2. BA, RF OS"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.509563029,52.937894127],[8.5111639,52.938736201],[8.5136306,52.939992501],[8.515515,52.940890801],[8.5175415,52.941825201],[8.5195178,52.942688201],[8.5215119,52.943524001],[8.5231928,52.944198701],[8.5241868,52.944581901],[8.5263632,52.945390001],[8.5285696,52.946176701],[8.5308362,52.946953701],[8.5319264,52.947304101],[8.5320439,52.947341701],[8.5336357,52.947851501],[8.5354109,52.948400301],[8.5380997,52.949195801],[8.5387818,52.949387601],[8.5396663,52.949636201],[8.5412816,52.950071901],[8.5443899,52.950902901],[8.5467839,52.951520901],[8.5492049,52.952136301],[8.5583821,52.954385001],[8.5697438,52.957096801],[8.5743839,52.958239801],[8.5770151,52.958905501],[8.5789987,52.959423001],[8.5823742,52.960343401],[8.5857266,52.961286501],[8.5887867,52.962192401],[8.591622,52.963075001],[8.5952036,52.964249101],[8.5978098,52.965148501],[8.599145,52.965624701],[8.602648,52.966904201],[8.6043613,52.967558501],[8.6066796,52.968473201],[8.6088275,52.969333301],[8.6115634,52.970483301],[8.6117064,52.970544601],[8.6132051,52.971187301],[8.6146719,52.971838601],[8.6172006,52.972986501],[8.620359,52.974493701],[8.6226709,52.975633401],[8.6257104,52.977175101],[8.628528,52.978652501],[8.6366352,52.983019801],[8.640606089,52.985170202]]}},{"identifier":"2026-046582--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de8","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.9235346436171,8.485472225659725,52.92494173748615,8.488374788419069","point":"52.9235346436171,8.485472225659725","startLcPosition":"174","impact":{"lower":"Delmetal-Süd","upper":"Wildeshausen-Nord","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Wildeshausen-Nord - Delmetal-Süd","coordinate":{"lat":52.9235346436171,"long":8.485472225659725},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","17.09.26 von 20:00 bis 22:00 Uhr","","A1: Osnabrück -> Bremen, zwischen 2.4 km hinter AS Wildeshausen-Nord und 4.1 km vor Delmetal-Süd","","Länge: 0.25 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 Beseitigung Unfallfolgen- Schutzplankenrep."],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.485472226,52.923534644],[8.4862705,52.923900501],[8.488374788,52.924941737]]}},{"identifier":"2026-046582--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de12","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.9169873910009,8.461901501417184,52.91646026049368,8.458276292210336","point":"52.9169873910009,8.461901501417184","startLcPosition":"175","impact":{"lower":"Wildeshausen-Nord","upper":"Delmetal-Süd","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Delmetal-Süd - Wildeshausen-Nord","coordinate":{"lat":52.9169873910009,"long":8.461901501417184},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","18.09.26 von 00:30 bis 02:30 Uhr","","A1: Bremen -> Osnabrück, zwischen 6.1 km hinter Delmetal-Süd und 0.4 km vor AS Wildeshausen-Nord","","Länge: 0.25 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 Beseitigung Unfallfolgen- Schutzplankenrep."],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.461901501,52.916987391],[8.4610677,52.916851801],[8.4593432,52.916603001],[8.458276292,52.91646026]]}},{"identifier":"2026-046582--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de10","icon":"warnkegel","isBlocked":"false","future":true,"extent":"52.92517434323735,8.488553796722925,52.923757497632806,8.485658783874882","point":"52.92517434323735,8.488553796722925","startLcPosition":"175","impact":{"lower":"Wildeshausen-Nord","upper":"Delmetal-Süd","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Delmetal-Süd - Wildeshausen-Nord","coordinate":{"lat":52.92517434323735,"long":8.488553796722925},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","17.09.26 von 22:30 bis 24:00 Uhr","","A1: Bremen -> Osnabrück, zwischen 4.1 km hinter Delmetal-Süd und 2.5 km vor AS Wildeshausen-Nord","","Länge: 0.25 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 Beseitigung Unfallfolgen- Schutzplankenrep."],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.488553797,52.925174343],[8.4884432,52.925113801],[8.4861687,52.923992901],[8.485658784,52.923757498]]}},{"identifier":"2025-042559--vi-bs.2026-08-03_06-00-00-000.devi-zus.2026-02-08_00-00-00-000.de15","icon":"123","isBlocked":"false","future":false,"extent":"52.98525250424302,8.640483816730525,52.93797265958821,8.509448458894006","point":"52.98525250424302,8.640483816730525","startLcPosition":"178","impact":{"lower":"Wildeshausen-Nord","upper":"Mackenstedter Heide","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","SEPARATE","CLOSED","CLOSED","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Mackenstedter Heide - Wildeshausen-Nord","startTimestamp":"2026-08-03T06:00:00+02:00","coordinate":{"lat":52.98525250424302,"long":8.640483816730525},"description":["Zeitraum dieser Bauphase:","Beginn: 03.08.26 um 06:00 Uhr","Ende: 26.02.27 um 18:00 Uhr","(Ende der Gesamtmaßnahme: 26.02.27)","","A1: Bremen -> Osnabrück, zwischen 2.3 km hinter Mackenstedter Heide und 4.7 km vor AS Wildeshausen-Nord","","Länge: 10.33 km | Maximale Durchfahrtsbreite: 5.5 m","","A1 Grunderneuerung 2. BA, RF OS"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.640483817,52.985252504],[8.6365333,52.983116301],[8.6284054,52.978730601],[8.6255927,52.977259401],[8.6225645,52.975724301],[8.6203081,52.974607401],[8.6179228,52.973470801],[8.6147973,52.972036201],[8.6130837,52.971271501],[8.6116102,52.970633401],[8.6114689,52.970572301],[8.6087656,52.969434701],[8.6066016,52.968567101],[8.6048184,52.967872601],[8.60285,52.967104801],[8.6025265,52.966982701],[8.5990612,52.965713701],[8.5970422,52.965007501],[8.5951171,52.964345901],[8.5915171,52.963168001],[8.5887142,52.962298401],[8.5856435,52.961378301],[8.5822991,52.960435501],[8.5789262,52.959524601],[8.5769346,52.959004001],[8.5743061,52.958339901],[8.5696717,52.957196201],[8.5617678,52.955316801],[8.5595719,52.954794601],[8.5583021,52.954490001],[8.5556523,52.953859801],[8.5514546,52.952839201],[8.5490905,52.952260401],[8.5478622,52.951945901],[8.5466981,52.951643801],[8.5442923,52.951023101],[8.5412129,52.950192601],[8.5396033,52.949744801],[8.5380094,52.949287601],[8.535339,52.948498301],[8.5337007,52.947998501],[8.5318215,52.947395201],[8.5307632,52.947050901],[8.5284706,52.946269801],[8.5262783,52.945484801],[8.5240837,52.944664801],[8.523104,52.944291901],[8.5214194,52.943612301],[8.519386,52.942767601],[8.5174685,52.941927201],[8.5153775,52.940972001],[8.5135313,52.940082001],[8.5110395,52.938831401],[8.509448459,52.93797266]]}},{"identifier":"2026-046582--vi-bs.2026-09-16_07-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de5","icon":"warnkegel","isBlocked":"false","future":true,"extent":"53.00078856483988,8.676848907280727,53.00166025860116,8.680279626431437","point":"53.00078856483988,8.676848907280727","startLcPosition":"178","impact":{"lower":"Delmenhorst-Ost","upper":"Mackenstedter Heide","symbols":["SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Mackenstedter Heide - Delmenhorst-Ost","coordinate":{"lat":53.00078856483988,"long":8.676848907280727},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 von 11:30 bis 13:30 Uhr","","A1: Osnabrück -> Bremen, zwischen 0.7 km hinter Mackenstedter Heide und 1.4 km vor AS Delmenhorst-Ost","","Länge: 0.25 km | Maximale Durchfahrtsbreite: 7.5 m","","A1 Beseitigung Unfallfolgen- Schutzplankenrep."],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.676848907,53.000788565],[8.6775214,53.000970601],[8.6786018,53.001242701],[8.6797276,53.001526101],[8.680279626,53.001660259]]}},{"identifier":"2025-006272--vi-bs.2025-08-15_05-00-00-000.devi-zus.2025-04-02_05-00-00-000.de7","icon":"123","isBlocked":"false","future":false,"extent":"53.03185806673155,8.865526339396158,53.03464387180433,8.872117512039255","point":"53.03185806673155,8.865526339396158","startLcPosition":"184","impact":{"lower":"Bremen-Hemelingen","upper":"Bremen-Arsten","symbols":["ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","SEPARATE","CLOSED","CLOSED","CLOSED","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Osnabrück -> Bremen","title":"A1 | Bremen-Arsten - Bremen-Hemelingen","startTimestamp":"2025-08-15T05:00:00+02:00","coordinate":{"lat":53.03185806673155,"long":8.865526339396158},"description":["Zeitraum dieser Bauphase:","Beginn: 15.08.25 um 05:00 Uhr","Ende: 01.11.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.01.28)","","A1: Osnabrück -> Bremen, zwischen 0.5 km hinter AS Bremen-Arsten und 1.1 km vor AS Bremen-Hemelingen","","Länge: 0.54 km | Maximale Durchfahrtsbreite: 6.33 m","","A1 Brückeninstandsetzung Weserquerung "],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.865526339,53.031858067],[8.8666479,53.032327301],[8.8715253,53.034400401],[8.872117512,53.034643872]]}},{"identifier":"2025-006272--vi-bs.2025-08-15_05-00-00-000.devi-zus.2025-04-02_05-00-00-000.de9","icon":"123","isBlocked":"false","future":false,"extent":"53.0347527671966,8.871994795941875,53.03196407475268,8.86540161846903","point":"53.0347527671966,8.871994795941875","startLcPosition":"185","impact":{"lower":"Bremen-Arsten","upper":"Bremen-Hemelingen","symbols":["CLOSED","CLOSED","CLOSED","CLOSED","SEPARATE","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Bremen -> Osnabrück","title":"A1 | Bremen-Hemelingen - Bremen-Arsten","startTimestamp":"2025-08-15T05:00:00+02:00","coordinate":{"lat":53.0347527671966,"long":8.871994795941875},"description":["Zeitraum dieser Bauphase:","Beginn: 15.08.25 um 05:00 Uhr","Ende: 01.11.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.01.28)","","A1: Bremen -> Osnabrück, zwischen 1.1 km hinter AS Bremen-Hemelingen und 0.5 km vor AS Bremen-Arsten","","Länge: 0.54 km | Maximale Durchfahrtsbreite: 6.53 m","","A1 Brückeninstandsetzung Weserquerung "],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.871994796,53.034752767],[8.8714125,53.034515401],[8.8661376,53.032279501],[8.8656674,53.032080401],[8.865401618,53.031964075]]}},{"identifier":"2025-058131--vi-bs.2026-06-22_09-00-00-000.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"53.29844740708683,9.530936519393629,53.30075879083511,9.536293811805743","point":"53.29844740708683,9.530936519393629","startLcPosition":"201","impact":{"lower":"Kalmoor","upper":"Sittensen","symbols":["SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Bremen -> Hamburg","title":"A1 | Sittensen - Kalmoor","coordinate":{"lat":53.29844740708683,"long":9.530936519393629},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","16.09.26 09:00 bis zum 15.10.26 24:00 Uhr.","16.10.26 von 00:00 bis 18:00 Uhr","","A1: Bremen -> Hamburg, zwischen 1.7 km hinter AS Sittensen und 3.9 km vor Kalmoor","","Länge: 0.44 km | Maximale Durchfahrtsbreite: 10 m","","A1 Ostetal (Raststaette) RF HH Arbeiten an Parkplätzen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[9.530936519,53.298447407],[9.536293812,53.300758791]]}},{"identifier":"2026-046175--vi-bs.2026-09-21_19-00-00-000_002.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"53.35422512055768,9.694264571702874,53.331553044667444,9.612675007464139","point":"53.35422512055768,9.694264571702874","startLcPosition":"206","impact":{"lower":"Kalmoor","upper":"Hollenstedt","symbols":["SEPARATE","ARROW_UP","CLOSED","CLOSED","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Hamburg -> Bremen","title":"A1 | Hollenstedt - Kalmoor","coordinate":{"lat":53.35422512055768,"long":9.694264571702874},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","Jeden Montag, Dienstag, Mittwoch und Donnerstag zwischen dem 21.09.26 und dem 25.09.26 von 19:00 bis 00:00 Uhr.","Jeden Dienstag, Mittwoch, Donnerstag und Freitag zwischen dem 22.09.26 und dem 25.09.26 von 00:00 bis 05:00 Uhr.","","A1: Hamburg -> Bremen, zwischen 1.2 km hinter AS Hollenstedt und 2.2 km vor Kalmoor","","Länge: 5.99 km | Maximale Durchfahrtsbreite: 5.5 m","","A1 , Km 39,0-Km 45,0 RF HB, Sperrung HFS u.1. ÜFS für Deckenreparaturarbeiten als Wanderbaustelle"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[9.694264572,53.354225121],[9.6926487,53.353776201],[9.6910141,53.353322101],[9.6848518,53.351610201],[9.6808674,53.350503201],[9.6781119,53.349737701],[9.6764256,53.349269201],[9.6753451,53.348969001],[9.6694948,53.347343501],[9.6672807,53.346728301],[9.6669692,53.346641801],[9.6537088,53.342957301],[9.6502032,53.341983101],[9.6434784,53.340114401],[9.6400953,53.339174301],[9.6367539,53.338228601],[9.6342606,53.337529901],[9.6312682,53.336703901],[9.6310908,53.336654601],[9.6290755,53.336111801],[9.6265015,53.335396401],[9.6201752,53.333638201],[9.6129014,53.331616501],[9.612675007,53.331553045]]}},{"identifier":"2026-040751--vi-bs.2026-08-10_19-00-00-000_006.de0","icon":"warnkegel","isBlocked":"false","future":false,"extent":"53.37126087314776,9.804786777748667,53.301652525029326,9.537919063287777","point":"53.37126087314776,9.804786777748667","startLcPosition":"210","impact":{"lower":"Ostetal","upper":"Buchholzer Dreieck","symbols":["SEPARATE","CLOSED","CLOSED","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Hamburg -> Bremen","title":"A1 | Buchholzer Dreieck - Ostetal","coordinate":{"lat":53.37126087314776,"long":9.804786777748667},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","Jeden Montag, Dienstag, Mittwoch und Donnerstag zwischen dem 10.08.26 und dem 02.10.26 von 19:00 bis 00:00 Uhr.","Jeden Montag, Dienstag, Mittwoch, Donnerstag und Freitag zwischen dem 11.08.26 und dem 02.10.26 von 00:00 bis 05:00 Uhr.","","A1: Hamburg -> Bremen, zwischen 3.3 km hinter AD Buchholzer Dreieck und 0.4 km vor Ostetal","","Länge: 19.71 km | Maximale Durchfahrtsbreite: 5.25 m","","Für Rissvergußarbeiten, Sperrung 1.u.2. ÜFS als Wanderbaustelle, zwischen Km 31,2 - 51,0 beide RF."],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[9.804786778,53.371260873],[9.8026553,53.371194601],[9.8011105,53.371146501],[9.7972556,53.371026601],[9.7964175,53.371000601],[9.7942754,53.370933901],[9.7641648,53.369997301],[9.7579377,53.369794501],[9.7566836,53.369753601],[9.7545114,53.369678601],[9.753207,53.369598901],[9.7520745,53.369502501],[9.7507158,53.369344801],[9.749162,53.369122401],[9.7490222,53.369098101],[9.7478683,53.368901301],[9.7469524,53.368714501],[9.7466034,53.368637501],[9.7460354,53.368512901],[9.7453171,53.368337101],[9.7420489,53.367460001],[9.7389331,53.366590001],[9.7385793,53.366493301],[9.7353899,53.365621301],[9.735265,53.365586901],[9.7322759,53.364762801],[9.7248727,53.362713401],[9.7223235,53.361988601],[9.7221296,53.361933001],[9.7217403,53.361823901],[9.7186131,53.360973501],[9.7116578,53.359029901],[9.7090721,53.358312301],[9.7081121,53.358046001],[9.7068095,53.357684701],[9.7044568,53.357033001],[9.6954099,53.354543301],[9.6944578,53.354278801],[9.6926487,53.353776201],[9.6910141,53.353322101],[9.6848518,53.351610201],[9.6808674,53.350503201],[9.6781119,53.349737701],[9.6764256,53.349269201],[9.6753451,53.348969001],[9.6694948,53.347343501],[9.6672807,53.346728301],[9.6669692,53.346641801],[9.6537088,53.342957301],[9.6502032,53.341983101],[9.6434784,53.340114401],[9.6400953,53.339174301],[9.6367539,53.338228601],[9.6342606,53.337529901],[9.6312682,53.336703901],[9.6310908,53.336654601],[9.6290755,53.336111801],[9.6265015,53.335396401],[9.6201752,53.333638201],[9.6129014,53.331616501],[9.6046561,53.329305001],[9.6024393,53.328670101],[9.6009279,53.328201601],[9.5992574,53.327670701],[9.5975808,53.327094301],[9.5954794,53.326336101],[9.5935593,53.325595001],[9.5919503,53.324960201],[9.5889066,53.323658601],[9.5866417,53.322681801],[9.5827042,53.320982701],[9.5761559,53.318156901],[9.5744737,53.317430901],[9.5622498,53.312155301],[9.5518858,53.307681801],[9.550096,53.306909201],[9.5457392,53.305028501],[9.5399214,53.302517001],[9.5379658,53.301672701],[9.537919063,53.301652525]]}},{"identifier":"2025-007637--vi-bs.2026-07-21_22-00-00-000.devi-zus.2025-06-02_00-00-00-000_001.de62","icon":"123","isBlocked":"false","future":false,"extent":"53.374334343113624,9.920469279242452,53.37741782382933,9.949933073745273","point":"53.374334343113624,9.920469279242452","startLcPosition":"211","impact":{"lower":"Sunderblick","upper":"Dibbersen","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","SEPARATE","ARROW_UP","SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Bremen -> Hamburg","title":"A1 | Dibbersen - Sunderblick","startTimestamp":"2026-07-21T22:00:00+02:00","coordinate":{"lat":53.374334343113624,"long":9.920469279242452},"description":["Zeitraum dieser Bauphase:","Beginn: 21.07.26 um 22:00 Uhr","Ende: 30.11.26 um 19:00 Uhr","(Ende der Gesamtmaßnahme: 01.12.26)","","A1: Bremen -> Hamburg, zwischen 2.5 km hinter AS Dibbersen und 0.1 km vor Sunderblick","","Länge: 1.99 km | Maximale Durchfahrtsbreite: 4.7 m","","A1, AS Seevetal-Hittfeld bis AD Buchholz, BW102E und BW103,  Bauwerksarbeiten, Instandsetzung Brückenbeläge und Deckensanierung"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[9.920469279,53.374334343],[9.9283421,53.375158101],[9.9323911,53.375581801],[9.9337453,53.375723601],[9.9399951,53.376377701],[9.9432069,53.376713801],[9.9474393,53.377156801],[9.9487779,53.377296901],[9.949933074,53.377417824]]}},{"identifier":"2025-007637--vi-bs.2026-07-21_22-00-00-000.devi-zus.2025-06-02_00-00-00-000_001.de64","icon":"123","isBlocked":"false","future":false,"extent":"53.37755673477842,9.949892319648821,53.37446159523223,9.920431961446253","point":"53.37755673477842,9.949892319648821","startLcPosition":"212","impact":{"lower":"Dibbersen","upper":"Sunderblick","symbols":["CLOSED","BORDER_LEFT","CLOSED","ARROW_DOWN","SEPARATE","ARROW_DOWN","SEPARATE","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Hamburg -> Bremen","title":"A1 | Sunderblick - Dibbersen","startTimestamp":"2026-07-21T22:00:00+02:00","coordinate":{"lat":53.37755673477842,"long":9.949892319648821},"description":["Zeitraum dieser Bauphase:","Beginn: 21.07.26 um 22:00 Uhr","Ende: 30.11.26 um 19:00 Uhr","(Ende der Gesamtmaßnahme: 01.12.26)","","A1: Hamburg -> Bremen, zwischen 0.1 km hinter Sunderblick und 2.5 km vor AS Dibbersen","","Länge: 1.99 km | Maximale Durchfahrtsbreite: 6 m","","A1, AS Seevetal-Hittfeld bis AD Buchholz, BW102E und BW103,  Bauwerksarbeiten, Instandsetzung Brückenbeläge und Deckensanierung"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[9.94989232,53.377556735],[9.9489032,53.377452801],[9.9451905,53.377062701],[9.9431606,53.376849401],[9.9399356,53.376510601],[9.9337955,53.375865501],[9.9324042,53.375719301],[9.9283117,53.375289301],[9.920431961,53.374461595]]}},{"identifier":"2024-061546--vi-bs.2026-06-30_22-00-00-000.devi-zus.2026-04-20_22-00-00-000.de3","icon":"123","isBlocked":"false","future":false,"extent":"53.45118921502903,10.029090476513497,53.4864699479168,10.02787565631183","point":"53.45118921502903,10.029090476513497","startLcPosition":"217","impact":{"lower":"Hamburg-Norderelbe","upper":"Maschener Kreuz","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Bremen -> Lübeck","title":"A1 | Maschener Kreuz - Hamburg-Norderelbe","startTimestamp":"2026-06-30T22:00:00+02:00","coordinate":{"lat":53.45118921502903,"long":10.029090476513497},"description":["Zeitraum dieser Bauphase:","Beginn: 30.06.26 um 22:00 Uhr","Ende: 01.11.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 31.01.30)","","A1: Bremen -> Lübeck, zwischen 6.8 km hinter AK Maschener Kreuz und 2.5 km vor AD Hamburg-Norderelbe","","Länge: 4.04 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 9.25 m","","A1, HH Süderelbbrücke, Ersatzneubau und 8-streifige Erweiterung"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.029090477,53.451189215],[10.0286155,53.452944201],[10.0283809,53.453757701],[10.0278849,53.455478101],[10.0273661,53.457246301],[10.0265912,53.459930301],[10.0261949,53.461300801],[10.026167,53.461404601],[10.0259077,53.462327301],[10.0258417,53.462539201],[10.025702,53.463002301],[10.025666,53.463152901],[10.0251336,53.465073501],[10.0249901,53.465660601],[10.024731,53.466817201],[10.0246428,53.467239601],[10.0243047,53.468864201],[10.0242712,53.469005701],[10.0241223,53.469675301],[10.0240994,53.469778101],[10.0238335,53.471017501],[10.0238097,53.471127001],[10.0237666,53.471348901],[10.0235994,53.472087601],[10.0233978,53.473017201],[10.0227695,53.475935501],[10.0226742,53.476464901],[10.0225682,53.477061601],[10.0225445,53.477364201],[10.0225427,53.477387301],[10.0225295,53.477608201],[10.0225499,53.478187201],[10.0225846,53.478580001],[10.0226382,53.478872301],[10.0227348,53.479312701],[10.022781,53.479477201],[10.0229854,53.480042701],[10.0231006,53.480329201],[10.0234244,53.480954301],[10.0236674,53.481344101],[10.0240034,53.481819901],[10.0242827,53.482175301],[10.0252195,53.483297501],[10.0272004,53.485690501],[10.027875656,53.486469948]]}},{"identifier":"2024-061546--vi-bs.2026-06-30_22-00-00-000.devi-zus.2026-04-20_22-00-00-000.de1","icon":"123","isBlocked":"false","future":false,"extent":"53.4865449669922,10.027627085342074,53.45116544489849,10.028838734134975","point":"53.4865449669922,10.027627085342074","startLcPosition":"222","impact":{"lower":"Maschener Kreuz","upper":"Hamburg-Norderelbe","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Lübeck -> Bremen","title":"A1 | Hamburg-Norderelbe - Maschener Kreuz","startTimestamp":"2026-06-30T22:00:00+02:00","coordinate":{"lat":53.4865449669922,"long":10.027627085342074},"description":["Zeitraum dieser Bauphase:","Beginn: 30.06.26 um 22:00 Uhr","Ende: 01.11.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 31.01.30)","","A1: Lübeck -> Bremen, zwischen 2.7 km hinter AD Hamburg-Norderelbe und 6.8 km vor AK Maschener Kreuz","","Länge: 4.04 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 9.25 m","","A1, HH Süderelbbrücke, Ersatzneubau und 8-streifige Erweiterung"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.027627085,53.486544967],[10.0269629,53.485745601],[10.0240218,53.482221101],[10.0237536,53.481873401],[10.0234131,53.481391501],[10.0231695,53.480997901],[10.0229529,53.480579801],[10.0227355,53.480082301],[10.0225102,53.479435301],[10.0224736,53.479278401],[10.0224083,53.479016701],[10.0223342,53.478564101],[10.0222875,53.478188701],[10.0222771,53.477713901],[10.022304,53.477240501],[10.0223581,53.476790001],[10.0224202,53.476448501],[10.0225163,53.475916301],[10.023141,53.472997801],[10.023555,53.471145401],[10.0235748,53.471039701],[10.0238337,53.469758401],[10.0238559,53.469655501],[10.0240149,53.468972701],[10.0241756,53.468245501],[10.0242368,53.467954001],[10.0245219,53.466608301],[10.0246924,53.465895701],[10.0249882,53.464616201],[10.0253498,53.463340701],[10.0255682,53.462573501],[10.0256261,53.462363701],[10.0257978,53.461790701],[10.0263391,53.459914901],[10.0271623,53.457056501],[10.0283604,53.452914101],[10.0286239,53.451998301],[10.028838734,53.451165445]]}},{"identifier":"2024-054366--vi-bs.2026-05-31_09-00-00-000.devi-zus.2026-03-16_21-30-00-000.de9","icon":"123","isBlocked":"false","future":false,"extent":"53.50946311382446,10.049680174618953,53.508977257620806,10.06729858566235","point":"53.50946311382446,10.049680174618953","startLcPosition":"222","impact":{"lower":"Hamburg-Südost","upper":"Hamburg-Norderelbe","symbols":["ARROW_DOWN","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Hamburg -> Lübeck","title":"A1 | Hamburg-Norderelbe - Hamburg-Südost","startTimestamp":"2026-05-31T09:00:00+02:00","coordinate":{"lat":53.50946311382446,"long":10.049680174618953},"description":["Zeitraum dieser Bauphase:","Beginn: 31.05.26 um 09:00 Uhr","Ende: 01.10.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.01.31)","","A1: Hamburg -> Lübeck, zwischen 0.7 km hinter AD Hamburg-Norderelbe und 0.9 km vor AD Hamburg-Südost","","Länge: 1.17 km | Maximale Durchfahrtsbreite: 8.85 m","","A1, Norderelbbrücke, Ersatzneubau 12-streifige Erweiterung ( GST siehe Baustelleninfomationen )"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.049680175,53.509463114],[10.0505858,53.509443201],[10.0539871,53.509363401],[10.0542473,53.509357201],[10.0545581,53.509349901],[10.0549398,53.509341001],[10.0549643,53.509340401],[10.0570437,53.509297801],[10.0632685,53.509157401],[10.0638573,53.509142301],[10.0643289,53.509132401],[10.0654785,53.509084601],[10.0664589,53.509042201],[10.0671947,53.508988001],[10.067298586,53.508977258]]}},{"identifier":"2024-054366--vi-bs.2026-05-31_09-00-00-000.devi-zus.2026-03-16_21-30-00-000.de7","icon":"123","isBlocked":"false","future":false,"extent":"53.50912096405554,10.067338361145685,53.509626358381745,10.049690593544685","point":"53.50912096405554,10.067338361145685","startLcPosition":"224","impact":{"lower":"Hamburg-Norderelbe","upper":"Hamburg-Südost","symbols":["ARROW_DOWN","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Lübeck -> Hamburg","title":"A1 | Hamburg-Südost - Hamburg-Norderelbe","startTimestamp":"2026-05-31T09:00:00+02:00","coordinate":{"lat":53.50912096405554,"long":10.067338361145685},"description":["Zeitraum dieser Bauphase:","Beginn: 31.05.26 um 09:00 Uhr","Ende: 01.10.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.01.31)","","A1: Lübeck -> Hamburg, zwischen 0.9 km hinter AD Hamburg-Südost und 0.9 km vor AD Hamburg-Norderelbe","","Länge: 1.17 km | Maximale Durchfahrtsbreite: 8.85 m","","A1, Norderelbbrücke, Ersatzneubau 12-streifige Erweiterung ( GST siehe Baustelleninfomationen )"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.067338361,53.509120964],[10.0672233,53.509131801],[10.0664778,53.509184701],[10.0654984,53.509228701],[10.064339,53.509276501],[10.0638764,53.509286401],[10.0632783,53.509302501],[10.0570535,53.509442901],[10.0549722,53.509495101],[10.0549491,53.509495701],[10.0542456,53.509511001],[10.0539893,53.509516601],[10.0531812,53.509534201],[10.0509932,53.509595001],[10.0504385,53.509608901],[10.049690594,53.509626358]]}},{"identifier":"2026-045335--vi-bs.2026-09-07_08-00-00-000.devi-zus.2026-09-07_08-00-00-000_010.de1","icon":"warnkegel","isBlocked":"false","future":false,"extent":"53.58757417256885,10.212955088191606,53.69748867312065,10.325066614210872","point":"53.58757417256885,10.212955088191606","startLcPosition":"230","impact":{"lower":"Bargteheide","upper":"Barsbüttel","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Hamburg -> Lübeck","title":"A1 | Barsbüttel - Bargteheide","coordinate":{"lat":53.58757417256885,"long":10.212955088191606},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 08:00 bis 15:00 Uhr","15.09.26 von 08:00 bis 15:00 Uhr","16.09.26 von 08:00 bis 15:00 Uhr","","A1: Hamburg -> Lübeck, zwischen 1.7 km hinter AS Barsbüttel und 2.2 km vor AK Bargteheide","","Länge: 14.72 km | Maximale Durchfahrtsbreite: 7.5 m","","A1 von Stapelfeld (AS) Bauwerksprüfungen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.212955088,53.587574173],[10.2132344,53.587816301],[10.2136752,53.588192401],[10.2213433,53.594805401],[10.2229406,53.596204201],[10.2230795,53.596326201],[10.2248141,53.597820801],[10.2256456,53.598548201],[10.2264382,53.599290701],[10.2269241,53.599791501],[10.2274027,53.600298601],[10.227668,53.600620601],[10.2279322,53.600950101],[10.2284139,53.601594201],[10.2287583,53.602096101],[10.2290234,53.602530201],[10.2292398,53.602898201],[10.2294409,53.603273001],[10.2297695,53.603936901],[10.2300391,53.604546201],[10.2302694,53.605154001],[10.2310074,53.607786301],[10.2310751,53.608032101],[10.2320254,53.611298701],[10.2320363,53.611336201],[10.2321367,53.611681301],[10.2325997,53.613316001],[10.2332286,53.615478901],[10.2333872,53.616047801],[10.2334911,53.616353501],[10.2336037,53.616632001],[10.2339583,53.617386001],[10.2343246,53.618038001],[10.2347042,53.618609501],[10.2352309,53.619306801],[10.2357996,53.619939601],[10.2366314,53.620760501],[10.2374018,53.621412501],[10.2384263,53.622178801],[10.2473433,53.628208401],[10.2517985,53.631224101],[10.2553046,53.633592001],[10.2564414,53.634359601],[10.2579468,53.635371401],[10.2582422,53.635570701],[10.2586877,53.635864901],[10.2593374,53.636271201],[10.2598403,53.636564401],[10.2604842,53.636899901],[10.2610661,53.637189201],[10.2617413,53.637495001],[10.2628609,53.637962401],[10.2633011,53.638134301],[10.2640642,53.638400301],[10.2645779,53.638570001],[10.2651089,53.638735401],[10.2657755,53.638930901],[10.2693723,53.639922301],[10.2719233,53.640630601],[10.2737218,53.641129201],[10.2745352,53.641355001],[10.2753983,53.641604301],[10.2762499,53.641875301],[10.2772301,53.642222401],[10.2778367,53.642454101],[10.2784954,53.642729301],[10.2791064,53.643006101],[10.2798503,53.643364501],[10.2801363,53.643513001],[10.2806019,53.643754801],[10.2811845,53.644087801],[10.2817563,53.644432001],[10.2826854,53.645077001],[10.283581,53.645736201],[10.286411,53.647814501],[10.2882405,53.649184601],[10.2894964,53.650133601],[10.2913213,53.651483701],[10.2925884,53.652465001],[10.2936216,53.653310101],[10.2948312,53.654451601],[10.2960838,53.655860901],[10.297473,53.657837601],[10.2975949,53.658011101],[10.2995014,53.660723701],[10.3021272,53.664459401],[10.3052153,53.668852501],[10.3069114,53.671265101],[10.3092416,53.674579401],[10.310602,53.676514301],[10.3124045,53.679077901],[10.3141717,53.681591001],[10.3153922,53.683326601],[10.3170035,53.685617901],[10.3184266,53.687641401],[10.3206709,53.690832401],[10.3215192,53.692049101],[10.322176,53.692991301],[10.3233698,53.694703701],[10.3236765,53.695198301],[10.3243632,53.696279501],[10.3247055,53.696868001],[10.32506,53.697477301],[10.325066614,53.697488673]]}},{"identifier":"2026-045335--vi-bs.2026-09-07_08-00-00-000.devi-zus.2026-09-07_08-00-00-000_010.de3","icon":"warnkegel","isBlocked":"false","future":false,"extent":"53.698014410665174,10.325099553934859,53.58785192279342,10.213000528926687","point":"53.698014410665174,10.325099553934859","startLcPosition":"236","impact":{"lower":"Barsbüttel","upper":"Bargteheide","symbols":["SEPARATE","ARROW_UP","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Lübeck -> Hamburg","title":"A1 | Bargteheide - Barsbüttel","coordinate":{"lat":53.698014410665174,"long":10.325099553934859},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 17:00 Uhr","15.09.26 von 09:00 bis 17:00 Uhr","16.09.26 von 09:00 bis 17:00 Uhr","","A1: Lübeck -> Hamburg, zwischen 2.1 km hinter AK Bargteheide und 1.7 km vor AS Barsbüttel","","Länge: 14.75 km | Maximale Durchfahrtsbreite: 7.5 m","","A1 von Stapelfeld (AS) Bauwerksprüfungen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.325099554,53.698014411],[10.3248097,53.697517201],[10.3244675,53.696928301],[10.3240818,53.696283701],[10.3236275,53.695504501],[10.3231924,53.694843801],[10.3219341,53.693045301],[10.3212726,53.692099901],[10.3204704,53.690987101],[10.3193889,53.689417601],[10.3181887,53.687713201],[10.3167611,53.685686001],[10.3151529,53.683402101],[10.314863,53.682990401],[10.3139206,53.681652001],[10.3121545,53.679143601],[10.3104034,53.676656401],[10.3089194,53.674523801],[10.3067468,53.671432601],[10.3049483,53.668907201],[10.3034417,53.666722601],[10.3019101,53.664536101],[10.2992941,53.660815801],[10.2972448,53.657886001],[10.2965498,53.656896501],[10.2958212,53.655916001],[10.2952301,53.655223501],[10.2945986,53.654545001],[10.2940057,53.653967701],[10.2933885,53.653398101],[10.2923247,53.652553101],[10.2911002,53.651633901],[10.2880107,53.649306301],[10.2862669,53.647951001],[10.2834244,53.645822001],[10.2825115,53.645177201],[10.2815771,53.644546601],[10.2810183,53.644201201],[10.2804486,53.643871601],[10.2799522,53.643610801],[10.2791531,53.643217601],[10.2783347,53.642844401],[10.2777012,53.642579401],[10.2772476,53.642403801],[10.2767983,53.642234301],[10.2760368,53.641966501],[10.2752691,53.641724901],[10.2744774,53.641496901],[10.2737613,53.641297601],[10.2707137,53.640455501],[10.2689562,53.639965501],[10.2677917,53.639652301],[10.2673593,53.639530701],[10.2656856,53.639059801],[10.2648032,53.638803701],[10.2639332,53.638530201],[10.2631697,53.638261501],[10.2624707,53.637983001],[10.2615813,53.637612701],[10.2609093,53.637306101],[10.2603258,53.637014201],[10.2596427,53.636656701],[10.2591705,53.636380201],[10.2584773,53.635960801],[10.2580026,53.635644201],[10.2577428,53.635468201],[10.2550734,53.633662101],[10.254366,53.633183501],[10.2527748,53.632104401],[10.2502076,53.630368601],[10.2494933,53.629876301],[10.246246,53.627684201],[10.2443988,53.626458601],[10.2393073,53.622999501],[10.2382199,53.622263801],[10.2371894,53.621494301],[10.2364424,53.620841501],[10.2356342,53.620079001],[10.2350097,53.619373001],[10.2344647,53.618657301],[10.2341814,53.618228601],[10.2339211,53.617798601],[10.2336113,53.617213101],[10.2333619,53.616667101],[10.2331067,53.615988001],[10.2329522,53.615424501],[10.2324444,53.613714901],[10.232331,53.613290201],[10.2318768,53.611708701],[10.2308116,53.607999401],[10.2307382,53.607743501],[10.2300035,53.605185001],[10.2297812,53.604577201],[10.229523,53.603967801],[10.2292066,53.603302601],[10.2288249,53.602639201],[10.2285263,53.602135001],[10.2282022,53.601635401],[10.2277055,53.601000201],[10.2274501,53.600677801],[10.2271827,53.600369901],[10.2267104,53.599868601],[10.2262359,53.599370201],[10.2257034,53.598872801],[10.2251577,53.598388501],[10.2229782,53.596503101],[10.2228378,53.596383901],[10.2211123,53.594889001],[10.2134731,53.588277801],[10.2130606,53.587901501],[10.213000529,53.587851923]]}},{"identifier":"2025-029519--vi-bs.2026-04-30_11-00-00-000.devi-zus.2026-03-30_00-00-00-000_001.de9","icon":"123","isBlocked":"false","future":false,"extent":"53.72943569593708,10.348456431571451,53.76825098187135,10.392449083366547","point":"53.72943569593708,10.348456431571451","startLcPosition":"237","impact":{"lower":"Barnitztal","upper":"Bargteheide","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","SEPARATE","ARROW_UP","ARROW_UP","SEPARATE","CLOSED","CLOSED","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Hamburg -> Lübeck","title":"A1 | Bargteheide - Barnitztal","startTimestamp":"2026-04-30T11:00:00+02:00","coordinate":{"lat":53.72943569593708,"long":10.348456431571451},"description":["Zeitraum dieser Bauphase:","Beginn: 30.04.26 um 11:00 Uhr","Ende: 07.12.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 03.06.28)","","A1: Hamburg -> Lübeck, zwischen 1.4 km hinter AS Bargteheide und 0.7 km vor Barnitztal","","Länge: 5.24 km | Maximale Durchfahrtsbreite: 6.75 m","","A1, AK Bargteheide - AS Bad Oldesloe, Erneuerung der BW 40,41 und 42 sowie die grundhafte Erneuerung der Fahrbahn Rifa Süd"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.348456432,53.729435696],[10.3505698,53.731817701],[10.354136,53.735843701],[10.3578017,53.740021801],[10.3615504,53.744256601],[10.3631373,53.746063401],[10.3641939,53.747244001],[10.3657196,53.748765401],[10.3667912,53.749691801],[10.36834,53.750965601],[10.3691778,53.751643001],[10.3700461,53.752359201],[10.3752027,53.756497401],[10.3805275,53.760836601],[10.3831379,53.762875001],[10.3846275,53.763860601],[10.3855708,53.764445101],[10.3909826,53.767446301],[10.392449083,53.768250982]]}},{"identifier":"2025-029519--vi-bs.2026-04-30_11-00-00-000.devi-zus.2026-03-30_00-00-00-000_001.de11","icon":"123","isBlocked":"false","future":false,"extent":"53.76838655631904,10.392236842875542,53.72952344525879,10.348174784715543","point":"53.76838655631904,10.392236842875542","startLcPosition":"239","impact":{"lower":"Bargteheide","upper":"Barnitztal","symbols":["CLOSED","BORDER_LEFT","CLOSED","CLOSED","CLOSED","SEPARATE","ARROW_DOWN","ARROW_DOWN","SEPARATE","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Lübeck -> Hamburg","title":"A1 | Barnitztal - Bargteheide","startTimestamp":"2026-04-30T11:00:00+02:00","coordinate":{"lat":53.76838655631904,"long":10.392236842875542},"description":["Zeitraum dieser Bauphase:","Beginn: 30.04.26 um 11:00 Uhr","Ende: 07.12.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 03.06.28)","","A1: Lübeck -> Hamburg, zwischen 0.7 km hinter Barnitztal und 1.4 km vor AS Bargteheide","","Länge: 5.24 km | Maximale Durchfahrtsbreite: 6.25 m","","A1, AK Bargteheide - AS Bad Oldesloe, Erneuerung der BW 40,41 und 42 sowie die grundhafte Erneuerung der Fahrbahn Rifa Süd"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.392236843,53.768386556],[10.3907734,53.767581101],[10.3853698,53.764588201],[10.3844335,53.764030201],[10.3829405,53.763028101],[10.38034,53.760991201],[10.37505,53.756673201],[10.372766,53.754812501],[10.3706544,53.753101201],[10.3699676,53.752543001],[10.3689409,53.751715501],[10.367986,53.750937601],[10.3669611,53.750106001],[10.366329,53.749582701],[10.3655116,53.748852401],[10.3639352,53.747305101],[10.3626636,53.745888301],[10.3613398,53.744344901],[10.3575086,53.740130501],[10.3538506,53.735920301],[10.3502717,53.731893101],[10.348174785,53.729523445]]}},{"identifier":"2025-061946--vi-bs.2026-09-14_00-00-00-000.devi-zus.2026-09-14_00-00-00-000_003.de26","icon":"123","isBlocked":"false","future":true,"extent":"53.909533141905285,10.695663937525765,53.92879862972976,10.728257557214938","point":"53.909533141905285,10.695663937525765","startLcPosition":"247","impact":{"lower":"Sereetzerfeld","upper":"Bad Schwartau","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Lübeck -> Fehmarn","title":"A1 | Bad Schwartau - Sereetzerfeld","startTimestamp":"2026-09-14T00:00:00+02:00","coordinate":{"lat":53.909533141905285,"long":10.695663937525765},"description":["Zeitraum dieser Bauphase:","Beginn: 14.09.26 um 00:00 Uhr","Ende: 10.10.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 20.05.28)","","A1: Lübeck -> Fehmarn, zwischen 0.6 km hinter AS Bad Schwartau und 0.4 km vor Sereetzerfeld","","Länge: 3.28 km | Maximale Durchfahrtsbreite: 6.25 m","","A1, AK Bad Schwartau bis AS Ratekau, BW74, Brückenersatzneubau"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.695663938,53.909533142],[10.6961322,53.909768101],[10.6981565,53.910938401],[10.698684,53.911243001],[10.6992385,53.911542401],[10.6997301,53.911783301],[10.7002445,53.912019601],[10.700811,53.912265201],[10.7014146,53.912495701],[10.7017221,53.912613401],[10.7023914,53.912848501],[10.7030193,53.913044001],[10.7036686,53.913225101],[10.7043019,53.913390001],[10.7049495,53.913539301],[10.7061619,53.913780701],[10.7086299,53.914244401],[10.7108696,53.914669101],[10.7142141,53.915287301],[10.715586,53.915562501],[10.7161135,53.915681501],[10.7168773,53.915873501],[10.7175651,53.916067601],[10.7183787,53.916334701],[10.7190822,53.916598601],[10.719759,53.916882201],[10.7204483,53.917195901],[10.7208741,53.917416901],[10.7216412,53.917876001],[10.7220189,53.918107901],[10.7226058,53.918525901],[10.722984,53.918825901],[10.7234114,53.919189101],[10.7237037,53.919446701],[10.7239547,53.919726201],[10.7240473,53.919832501],[10.7244818,53.920343801],[10.7248557,53.920880101],[10.7249461,53.921026601],[10.7253859,53.921823201],[10.7256222,53.922419401],[10.7257481,53.922753201],[10.7258039,53.922946901],[10.7260957,53.923971901],[10.7265038,53.925293901],[10.7269404,53.926435501],[10.7272698,53.927159601],[10.7273404,53.927298101],[10.7278345,53.928162901],[10.7280998,53.928580101],[10.728257557,53.92879863]]}},{"identifier":"2025-061946--vi-bs.2026-09-14_00-00-00-000.devi-zus.2026-09-14_00-00-00-000_003.de28","icon":"123","isBlocked":"false","future":true,"extent":"53.928842495690226,10.72808229032542,53.9096526676742,10.695489566800752","point":"53.928842495690226,10.72808229032542","startLcPosition":"250","impact":{"lower":"Bad Schwartau","upper":"Sereetzerfeld","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","CLOSED","SEPARATE","CLOSED","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Fehmarn -> Lübeck","title":"A1 | Sereetzerfeld - Bad Schwartau","startTimestamp":"2026-09-14T00:00:00+02:00","coordinate":{"lat":53.928842495690226,"long":10.72808229032542},"description":["Zeitraum dieser Bauphase:","Beginn: 14.09.26 um 00:00 Uhr","Ende: 10.10.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 20.05.28)","","A1: Fehmarn -> Lübeck, zwischen 0.4 km hinter Sereetzerfeld und 0.6 km vor AS Bad Schwartau","","Länge: 3.28 km | Maximale Durchfahrtsbreite: 6.25 m","","A1, AK Bad Schwartau bis AS Ratekau, BW74, Brückenersatzneubau"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.72808229,53.928842496],[10.7279325,53.928632401],[10.7276513,53.928202801],[10.7274547,53.927884201],[10.7271562,53.927335201],[10.7270903,53.927193301],[10.7267544,53.926470601],[10.7263322,53.925333601],[10.7259295,53.924045901],[10.7255635,53.922803201],[10.7254564,53.922514101],[10.7252053,53.921854601],[10.7250705,53.921581401],[10.7249161,53.921268601],[10.7246931,53.920923401],[10.7243152,53.920393801],[10.7239358,53.919957701],[10.7237488,53.919744901],[10.7232493,53.919286501],[10.7228154,53.918881301],[10.7223259,53.918499701],[10.7217429,53.918106401],[10.7214612,53.917923801],[10.7206997,53.917492501],[10.7200846,53.917176601],[10.7190463,53.916722101],[10.7189113,53.916672901],[10.7182553,53.916433801],[10.7174757,53.916181301],[10.7167982,53.915990301],[10.7161241,53.915817501],[10.7156529,53.915711201],[10.7148591,53.915543301],[10.7140705,53.915390901],[10.7071307,53.914127601],[10.7048754,53.913680201],[10.7042,53.913526701],[10.7035328,53.913357501],[10.7032096,53.913270001],[10.7028863,53.913175801],[10.7022544,53.912977301],[10.7016732,53.912776301],[10.7010951,53.912565601],[10.7005642,53.912354401],[10.6997479,53.911990601],[10.6990276,53.911644401],[10.6981637,53.911169501],[10.6973466,53.910681701],[10.6966791,53.910284801],[10.6963277,53.910091101],[10.6959713,53.909900601],[10.695489567,53.909652668]]}},{"identifier":"2025-059743--vi-bs.2026-07-01_00-00-00-000.devi-zus.2026-04-07_00-00-00-000_001.de1","icon":"123","isBlocked":"false","future":false,"extent":"53.959664801965424,10.742494004319996,54.02059084718022,10.731044079979831","point":"53.959664801965424,10.742494004319996","startLcPosition":"251","impact":{"lower":"Scharbeutz","upper":"Ratekau","symbols":["CLOSED","BORDER_LEFT","CLOSED","CLOSED","SEPARATE","ARROW_DOWN","SEPARATE","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Lübeck -> Fehmarn","title":"A1 | Ratekau - Scharbeutz","startTimestamp":"2026-07-01T00:00:00+02:00","coordinate":{"lat":53.959664801965424,"long":10.742494004319996},"description":["Zeitraum dieser Bauphase:","Beginn: 01.07.26 um 00:00 Uhr","Ende: 01.01.27 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 26.07.27)","","A1: Lübeck -> Fehmarn, zwischen 1.3 km hinter AS Ratekau und 1.6 km vor AS Scharbeutz","","Länge: 6.96 km | Maximale Durchfahrtsbreite: 6.25 m","","A1, AS Ratekau bis AS Scharbeutz, Grundhafte Erneuerung "],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.742494004,53.959664802],[10.7419239,53.960232101],[10.7415415,53.960612601],[10.7407433,53.961407701],[10.7404709,53.961686101],[10.7391389,53.962998901],[10.7379472,53.964306501],[10.7376829,53.964596501],[10.7368828,53.965531201],[10.7361079,53.966594601],[10.7354794,53.967528101],[10.735061,53.968247501],[10.7348376,53.968631601],[10.7342484,53.969802601],[10.7337582,53.970920701],[10.7333666,53.972060401],[10.7332705,53.972450001],[10.7330116,53.973498801],[10.7327817,53.974812801],[10.732692,53.975807801],[10.732671,53.976707601],[10.732655,53.977024801],[10.7327369,53.978494901],[10.7328993,53.980027401],[10.7331652,53.981760101],[10.7335651,53.984340501],[10.7336895,53.985252001],[10.7337841,53.986233501],[10.7338364,53.987483001],[10.7338296,53.988423701],[10.7337671,53.989635401],[10.7336412,53.990733801],[10.7334942,53.991660501],[10.7333569,53.992343701],[10.7331967,53.993023201],[10.7328976,53.994134801],[10.7325549,53.995252101],[10.7310396,53.999491801],[10.7310074,53.999576901],[10.7309146,53.999821501],[10.7303136,54.001509901],[10.7296851,54.003483001],[10.729409,54.004483201],[10.7291363,54.005668701],[10.7289504,54.006845501],[10.7288285,54.007861601],[10.7287837,54.008494001],[10.728769,54.009598801],[10.7287838,54.010249701],[10.7288074,54.010737401],[10.728891,54.011652501],[10.7290247,54.012566901],[10.729075,54.012851301],[10.7292706,54.013778601],[10.7294878,54.014704601],[10.7302109,54.017366101],[10.7305324,54.018452201],[10.7306042,54.018723801],[10.7308611,54.019742701],[10.73104408,54.020590847]]}},{"identifier":"2025-059743--vi-bs.2026-07-01_00-00-00-000.devi-zus.2026-04-07_00-00-00-000_001.de3","icon":"123","isBlocked":"false","future":false,"extent":"54.0206053231311,10.730854690716637,53.95960877481029,10.74233402714451","point":"54.0206053231311,10.730854690716637","startLcPosition":"253","impact":{"lower":"Ratekau","upper":"Scharbeutz","symbols":["ARROW_DOWN","BORDER_LEFT","ARROW_DOWN","SEPARATE","ARROW_UP","SEPARATE","CLOSED","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Fehmarn -> Lübeck","title":"A1 | Scharbeutz - Ratekau","startTimestamp":"2026-07-01T00:00:00+02:00","coordinate":{"lat":54.0206053231311,"long":10.730854690716637},"description":["Zeitraum dieser Bauphase:","Beginn: 01.07.26 um 00:00 Uhr","Ende: 01.01.27 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 26.07.27)","","A1: Fehmarn -> Lübeck, zwischen 1.6 km hinter AS Scharbeutz und 1.2 km vor AS Ratekau","","Länge: 6.96 km | Maximale Durchfahrtsbreite: 3.5 m","","A1, AS Ratekau bis AS Scharbeutz, Grundhafte Erneuerung "],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.730854691,54.020605323],[10.7306812,54.019817701],[10.7304235,54.018789501],[10.7303202,54.018505301],[10.7300034,54.017354201],[10.7295961,54.015927901],[10.7292182,54.014500601],[10.7289942,54.013513901],[10.7288046,54.012526301],[10.7285941,54.010727501],[10.7285771,54.009976801],[10.7285912,54.008693501],[10.7286158,54.008166001],[10.7287607,54.006831301],[10.7289178,54.005823001],[10.7289825,54.005551201],[10.729233,54.004403701],[10.729387,54.003843901],[10.7295324,54.003049701],[10.7301766,54.001205401],[10.7306947,53.999801601],[10.7308024,53.999515701],[10.7319744,53.996309301],[10.7326864,53.994087701],[10.733032,53.992964101],[10.7332856,53.991632601],[10.7334132,53.990794101],[10.7335481,53.989648201],[10.7336316,53.988439801],[10.7336429,53.987469901],[10.7335645,53.986154401],[10.7333722,53.984351001],[10.7329242,53.981549501],[10.7327141,53.980043001],[10.7325411,53.978534701],[10.7324559,53.976686801],[10.732507,53.975819901],[10.7325798,53.974779101],[10.7328202,53.973487401],[10.7331839,53.972045901],[10.7336018,53.970898001],[10.7340926,53.969755801],[10.7346564,53.968591301],[10.7353249,53.967468601],[10.7359352,53.966551201],[10.7367325,53.965459501],[10.737502,53.964546001],[10.7390053,53.962929501],[10.7403028,53.961630201],[10.7405802,53.961349201],[10.7414451,53.960488401],[10.742334027,53.959608775]]}},{"identifier":"2026-046604--vi-bs.2026-09-14_09-00-00-000_018.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"54.10222953547594,10.78062315474663,54.10400767410506,10.781185955190073","point":"54.10222953547594,10.78062315474663","startLcPosition":"256","impact":{"lower":"Neustadt i.H.-Pelzerhaken","upper":"Neustadt i.H.-Mitte","symbols":["SEPARATE","ARROW_UP","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Lübeck -> Fehmarn","title":"A1 | Neustadt i.H.-Mitte - Neustadt i.H.-Pelzerhaken","coordinate":{"lat":54.10222953547594,"long":10.78062315474663},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 16:00 Uhr","15.09.26 von 09:00 bis 16:00 Uhr","","A1: Lübeck -> Fehmarn, zwischen 0.9 km hinter AS Neustadt i.H.-Mitte und 4.4 km vor AS Neustadt i.H.-Pelzerhaken","","Länge: 0.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4.5 m","","A1 zwischen Neustadt i.H.-Mitte (AS) und Neustadt i.H.-Pelzerhaken (AS) Leitungsarbeiten"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.780623155,54.102229535],[10.7807108,54.102473901],[10.7810707,54.103604101],[10.7810907,54.103673701],[10.781185955,54.104007674]]}},{"identifier":"2026-039842--vi-fbm.2026-08-17_09-00-00-000.de0","icon":"warnkegel","isBlocked":"false","future":false,"extent":"54.29885180075875,10.8775599319541,54.29732768502814,10.87368059988181","point":"54.29885180075875,10.8775599319541","startLcPosition":"263","impact":{"lower":"Oldenburg i.H.-Mitte","upper":"Oldenburg i.H.-Nord","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" Fehmarn -> Lübeck","title":"A1 | Oldenburg i.H.-Nord - Oldenburg i.H.-Mitte","coordinate":{"lat":54.29885180075875,"long":10.8775599319541},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","19.10.26 von 09:00 bis 15:00 Uhr","","A1: Fehmarn -> Lübeck, zwischen 0.7 km hinter AS Oldenburg i.H.-Nord und 0.3 km vor AS Oldenburg i.H.-Mitte","","Länge: 0.3 km | Maximale Durchfahrtsbreite: 7 m","","A1 von Oldenburg i.H.-Mitte Auf- und Abbau von Hinweistafeln"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.877559932,54.298851801],[10.8771506,54.298745001],[10.8766407,54.298596101],[10.8760976,54.298429501],[10.8752421,54.298107701],[10.8747998,54.297914401],[10.874246,54.297635501],[10.8737715,54.297384001],[10.8736806,54.297327685]]}},{"identifier":"2026-005834--vi-bs.2026-09-14_00-00-00-000.devi-zus.2026-06-08_00-00-00-000_002.de9","icon":"123","isBlocked":"false","future":true,"extent":"54.335342153887304,10.936861454383255,54.363008637698,11.012338699769733","point":"54.335342153887304,10.936861454383255","startLcPosition":"265","impact":{"lower":"B207","upper":"Gremersdorf","symbols":["SEPARATE","CLOSED","CLOSED","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" Lübeck -> Fehmarn","title":"A1 | Gremersdorf - B207","startTimestamp":"2026-09-14T00:00:00+02:00","coordinate":{"lat":54.335342153887304,"long":10.936861454383255},"description":["Zeitraum dieser Bauphase:","Beginn: 14.09.26 um 00:00 Uhr","Ende: 21.09.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 10.10.26)","","A1: Lübeck -> Fehmarn, zwischen 0.5 km hinter AS Gremersdorf und B207","","Länge: 6.61 km | Maximale Durchfahrtsbreite: 3.25 m","","A1, AS Gremersdorf bis AS Heiligenhafen-Ost, B207, Instandsetzung der Deckschicht"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.936861454,54.335342154],[10.9369989,54.335483501],[10.9389843,54.337444701],[10.9393983,54.337842301],[10.9399725,54.338417401],[10.9411016,54.339534401],[10.9415007,54.339929101],[10.9418038,54.340228901],[10.9426078,54.341025301],[10.9432216,54.341627301],[10.9434879,54.341883101],[10.9444324,54.342837901],[10.9451392,54.343532501],[10.9457518,54.344134901],[10.9474874,54.345834701],[10.9476833,54.346019501],[10.9488012,54.347151701],[10.9505402,54.348868301],[10.9521385,54.350442201],[10.9532086,54.351510601],[10.954345,54.352632101],[10.9555863,54.353845901],[10.956242,54.354499001],[10.9574032,54.355655001],[10.9586209,54.356859001],[10.958758,54.356996901],[10.9596395,54.357870501],[10.9598648,54.358095701],[10.9599928,54.358223601],[10.9602884,54.358501701],[10.9606134,54.358795901],[10.9609343,54.359086401],[10.9610045,54.359148901],[10.9613721,54.359473901],[10.961695,54.359751201],[10.9622198,54.360175501],[10.962462,54.360357801],[10.9626472,54.360481501],[10.9630765,54.360742901],[10.9632888,54.360873001],[10.9635,54.360991801],[10.963809,54.361164901],[10.9643416,54.361424601],[10.9647937,54.361637001],[10.9655105,54.361933201],[10.9659809,54.362105901],[10.9664593,54.362259301],[10.9669612,54.362405101],[10.967462,54.362530901],[10.9679978,54.362643301],[10.9684948,54.362732401],[10.9690378,54.362813901],[10.9696032,54.362888101],[10.9701737,54.362942801],[10.9707145,54.362984201],[10.9713061,54.363010801],[10.9720911,54.363040401],[10.9732632,54.363035801],[10.9747484,54.362984501],[10.9756306,54.362938501],[10.9766048,54.362875201],[10.9777012,54.362793001],[10.9779101,54.362776201],[10.9790065,54.362686301],[10.9793,54.362659701],[10.9819443,54.362431601],[10.9849542,54.362192701],[10.9852827,54.362166801],[10.9876401,54.362007101],[10.9889312,54.361926501],[10.9915456,54.361797201],[10.9932309,54.361711601],[10.9944291,54.361661901],[10.9957586,54.361614201],[10.9969218,54.361573001],[10.9976129,54.361557601],[10.9987597,54.361544401],[10.9993679,54.361547101],[10.9999338,54.361554101],[11.0005291,54.361565001],[11.0010142,54.361577301],[11.0015681,54.361602601],[11.0023265,54.361642601],[11.0027322,54.361669401],[11.0031989,54.361710701],[11.0039125,54.361778001],[11.0045369,54.361853801],[11.0050849,54.361926701],[11.0058552,54.362040301],[11.0061901,54.362097601],[11.0068881,54.362221101],[11.0076724,54.362371301],[11.0079786,54.362427201],[11.0084136,54.362500701],[11.0089722,54.362587701],[11.0096193,54.362685301],[11.0099401,54.362730901],[11.010485,54.362823501],[11.0120962,54.362987601],[11.0123387,54.363008638]]}},{"identifier":"2026-005834--vi-bs.2026-09-21_00-00-00-000.devi-zus.2026-06-08_00-00-00-000_002.de5","icon":"123","isBlocked":"false","future":true,"extent":"54.33692821157297,10.93846141560033,54.36218298915496,11.00667269624513","point":"54.33692821157297,10.93846141560033","startLcPosition":"265","impact":{"lower":"Heiligenhafen-Ost","upper":"Gremersdorf","symbols":["SEPARATE","ARROW_UP","CLOSED","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Lübeck -> Fehmarn","title":"A1 | Gremersdorf - Heiligenhafen-Ost","startTimestamp":"2026-09-21T00:00:00+02:00","coordinate":{"lat":54.33692821157297,"long":10.93846141560033},"description":["Zeitraum dieser Bauphase:","Beginn: 21.09.26 um 00:00 Uhr","Ende: 28.09.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 10.10.26)","","A1: Lübeck -> Fehmarn, zwischen 0.7 km hinter AS Gremersdorf und 0.2 km vor AS Heiligenhafen-Ost","","Länge: 6.02 km | Maximale Durchfahrtsbreite: 3.25 m","","A1, AS Gremersdorf bis AS Heiligenhafen-Ost, B207, Instandsetzung der Deckschicht"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.938461416,54.336928212],[10.9389843,54.337444701],[10.9393983,54.337842301],[10.9399725,54.338417401],[10.9411016,54.339534401],[10.9415007,54.339929101],[10.9418038,54.340228901],[10.9426078,54.341025301],[10.9432216,54.341627301],[10.9434879,54.341883101],[10.9444324,54.342837901],[10.9451392,54.343532501],[10.9457518,54.344134901],[10.9474874,54.345834701],[10.9476833,54.346019501],[10.9488012,54.347151701],[10.9505402,54.348868301],[10.9521385,54.350442201],[10.9532086,54.351510601],[10.954345,54.352632101],[10.9555863,54.353845901],[10.956242,54.354499001],[10.9574032,54.355655001],[10.9586209,54.356859001],[10.958758,54.356996901],[10.9596395,54.357870501],[10.9598648,54.358095701],[10.9599928,54.358223601],[10.9602884,54.358501701],[10.9606134,54.358795901],[10.9609343,54.359086401],[10.9610045,54.359148901],[10.9613721,54.359473901],[10.961695,54.359751201],[10.9622198,54.360175501],[10.962462,54.360357801],[10.9626472,54.360481501],[10.9630765,54.360742901],[10.9632888,54.360873001],[10.9635,54.360991801],[10.963809,54.361164901],[10.9643416,54.361424601],[10.9647937,54.361637001],[10.9655105,54.361933201],[10.9659809,54.362105901],[10.9664593,54.362259301],[10.9669612,54.362405101],[10.967462,54.362530901],[10.9679978,54.362643301],[10.9684948,54.362732401],[10.9690378,54.362813901],[10.9696032,54.362888101],[10.9701737,54.362942801],[10.9707145,54.362984201],[10.9713061,54.363010801],[10.9720911,54.363040401],[10.9732632,54.363035801],[10.9747484,54.362984501],[10.9756306,54.362938501],[10.9766048,54.362875201],[10.9777012,54.362793001],[10.9779101,54.362776201],[10.9790065,54.362686301],[10.9793,54.362659701],[10.9819443,54.362431601],[10.9849542,54.362192701],[10.9852827,54.362166801],[10.9876401,54.362007101],[10.9889312,54.361926501],[10.9915456,54.361797201],[10.9932309,54.361711601],[10.9944291,54.361661901],[10.9957586,54.361614201],[10.9969218,54.361573001],[10.9976129,54.361557601],[10.9987597,54.361544401],[10.9993679,54.361547101],[10.9999338,54.361554101],[11.0005291,54.361565001],[11.0010142,54.361577301],[11.0015681,54.361602601],[11.0023265,54.361642601],[11.0027322,54.361669401],[11.0031989,54.361710701],[11.0039125,54.361778001],[11.0045369,54.361853801],[11.0050849,54.361926701],[11.0058552,54.362040301],[11.0061901,54.362097601],[11.006672696,54.362182989]]}},{"identifier":"2023-002834--vi-bs.2026-08-03_20-00-00-000.devi-zus.2021-10-11_20-00-00-000.f_001.de75","icon":"123","isBlocked":"false","future":false,"extent":"51.52188597645663,7.654990681500012,51.52111399171728,7.656046094396551","point":"51.52188597645663,7.654990681500012","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":"","title":"A1 - Ersatzneubau TB Liedbachtal - AlD 2834","startTimestamp":"2026-08-03T20:00:00+02:00","coordinate":{"lat":51.52188597645663,"long":7.654990681500012},"description":["Zeitraum dieser Bauphase:","Beginn: 03.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","Die Baustelle gilt nicht an folgenden Tagen:","(Ende der Gesamtmaßnahme: 02.11.27)","","Abfahrt von der A44 O 1","","Länge: 0.11 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Ersatzneubau TB Liedbachtal - AlD 2834"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.654990682,51.521885976],[7.6551359,51.521827901],[7.6553824,51.521681401],[7.6555478,51.521544401],[7.6558007,51.521283601],[7.6559728,51.521150201],[7.656046094,51.521113992]]}},{"identifier":"2023-004527--vi-bs.2024-11-25_05-00-00-000.devi-zus.2024-05-11_20-00-00-000_001.f.de15","icon":"123","isBlocked":"false","future":false,"extent":"51.432880064587785,7.534681717241727,51.43247380040124,7.533354280517688","point":"51.432880064587785,7.534681717241727","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)","title":"A45 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4527","startTimestamp":"2024-11-25T05:00:00+01:00","coordinate":{"lat":51.432880064587785,"long":7.534681717241727},"description":["Zeitraum dieser Bauphase:","Beginn: 25.11.24 um 05:00 Uhr","Ende: 28.07.27 um 20:00 Uhr","Die Baustelle gilt nicht an folgenden Tagen:","(Ende der Gesamtmaßnahme: 04.06.29)","","Auffahrt auf die A45: AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)","","Länge: 0.12 km | Max. 40 km/h | Maximale Durchfahrtsbreite: 4.5 m","","A45 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4527"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.534681717,51.432880065],[7.5346525,51.432808901],[7.5345636,51.432693001],[7.534489,51.432631401],[7.5343982,51.432574601],[7.5343113,51.432531401],[7.5342004,51.432488801],[7.5340878,51.432459901],[7.5339855,51.432440601],[7.5338386,51.432427801],[7.5337016,51.432431401],[7.5335837,51.432436901],[7.533354281,51.4324738]]}},{"identifier":"2023-004527--vi-bs.2024-11-25_05-00-00-000.devi-zus.2024-05-11_20-00-00-000_001.f.de13","icon":"123","isBlocked":"false","future":false,"extent":"51.43332327074093,7.530950919129663,51.43406993774549,7.530995314648657","point":"51.43332327074093,7.530950919129663","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)","title":"A45 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4527","startTimestamp":"2024-11-25T05:00:00+01:00","coordinate":{"lat":51.43332327074093,"long":7.530950919129663},"description":["Zeitraum dieser Bauphase:","Beginn: 25.11.24 um 05:00 Uhr","Ende: 28.07.27 um 20:00 Uhr","Die Baustelle gilt nicht an folgenden Tagen:","(Ende der Gesamtmaßnahme: 04.06.29)","","Abfahrt von der A45: AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)","","Länge: 0.09 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4.5 m","","A45 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4527"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.530950919,51.433323271],[7.5308127,51.433446301],[7.5307564,51.433523301],[7.5307229,51.433597901],[7.5307162,51.433742101],[7.5307278,51.433808401],[7.5307685,51.433877701],[7.5308112,51.433937601],[7.5308857,51.433999401],[7.5309469,51.434044601],[7.530995315,51.434069938]]}},{"identifier":"2023-004527--vi-bs.2024-11-25_05-00-00-000.devi-zus.2024-05-11_20-00-00-000_001.f.de11","icon":"123","isBlocked":"false","future":false,"extent":"51.43265422212442,7.529071043424701,51.43300433817447,7.530343353967382","point":"51.43265422212442,7.529071043424701","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Schwerte)","title":"A45 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4527","startTimestamp":"2024-11-25T05:00:00+01:00","coordinate":{"lat":51.43265422212442,"long":7.529071043424701},"description":["Zeitraum dieser Bauphase:","Beginn: 25.11.24 um 05:00 Uhr","Ende: 28.07.27 um 20:00 Uhr","Die Baustelle gilt nicht an folgenden Tagen:","14.09.26","(Ende der Gesamtmaßnahme: 04.06.29)","","Abfahrt von der A1: AK Westhofener Kreuz (aus Richtung Schwerte)","","Länge: 0.12 km | Maximale Durchfahrtsbreite: 4.5 m","","A45 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4527"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.529071043,51.432654222],[7.5290716,51.432660101],[7.5291025,51.432733801],[7.5291402,51.432805101],[7.5291867,51.432859901],[7.529247,51.432910801],[7.5293095,51.432955601],[7.5293823,51.432994001],[7.5294667,51.433022601],[7.5295729,51.433053401],[7.5296857,51.433072801],[7.5298073,51.433083101],[7.5299361,51.433077701],[7.5300817,51.433066401],[7.5301637,51.433052201],[7.5302638,51.433028201],[7.530343354,51.433004338]]}},{"identifier":"2023-004527--vi-bs.2024-11-25_05-00-00-000.devi-zus.2024-05-11_20-00-00-000_001.f.de9","icon":"123","isBlocked":"false","future":false,"extent":"51.43130004425273,7.535293385544493,51.430403408674536,7.535514509873359","point":"51.43130004425273,7.535293385544493","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Lennhof)","title":"A45 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4527","startTimestamp":"2024-11-25T05:00:00+01:00","coordinate":{"lat":51.43130004425273,"long":7.535293385544493},"description":["Zeitraum dieser Bauphase:","Beginn: 25.11.24 um 05:00 Uhr","Ende: 28.07.27 um 20:00 Uhr","Die Baustelle gilt nicht an folgenden Tagen:","(Ende der Gesamtmaßnahme: 04.06.29)","","Auffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Lennhof)","","Länge: 0.12 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4.5 m","","A45 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4527"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.535293386,51.431300044],[7.5353277,51.431286001],[7.5354485,51.431222801],[7.535568,51.431151301],[7.5356697,51.431076301],[7.5357316,51.431017801],[7.5357718,51.430970201],[7.535799,51.430908701],[7.535815,51.430840001],[7.5358197,51.430773601],[7.5358125,51.430694101],[7.5357916,51.430641301],[7.5357502,51.430585101],[7.5356921,51.430518101],[7.5356259,51.430466101],[7.535541,51.430413801],[7.53551451,51.430403409]]}},{"identifier":"2025-033844--vi-bs.2025-07-23_00-00-00-000.de0","icon":"123","isBlocked":"false","future":false,"extent":"53.50492761098878,10.037246835555235,53.508276404749054,10.035834964003874","point":"53.50492761098878,10.037246835555235","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":"","title":"A255 zur A1, Dreieck Norderelbe, Schweineohr in Rifa Norderelbbrücke, Brückeninstandhaltung, mit max. 3,5t Gesamtgewicht befahrbar","startTimestamp":"2025-07-23T00:00:00+02:00","coordinate":{"lat":53.50492761098878,"long":10.037246835555235},"description":["Zeitraum dieser Bauphase:","Beginn: 23.07.25 um 00:00 Uhr","Ende: 01.01.31 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.01.31)","","Abfahrt von der A255 S","","Länge: 0.54 km | Maximale Durchfahrtsbreite: 10 m | zulässiges Gesamtgewicht: 3.5 t","","A255 zur A1, Dreieck Norderelbe, Schweineohr in Rifa Norderelbbrücke, Brückeninstandhaltung, mit max. 3,5t Gesamtgewicht befahrbar"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.037246836,53.504927611],[10.0372365,53.504920301],[10.0370401,53.504811301],[10.0367979,53.504729201],[10.0366008,53.504688001],[10.0363648,53.504669801],[10.0361414,53.504679501],[10.0358927,53.504725701],[10.0356764,53.504791601],[10.0354606,53.504907701],[10.0353118,53.505007201],[10.0351615,53.505154601],[10.0350682,53.505279701],[10.0349688,53.505465101],[10.0348927,53.505622801],[10.0348139,53.505849501],[10.0347664,53.506049701],[10.0347347,53.506318401],[10.0347437,53.506532301],[10.0347716,53.506711901],[10.0348501,53.506994201],[10.034931,53.507187601],[10.0350714,53.507458001],[10.0352682,53.507724201],[10.0354403,53.507919001],[10.0356709,53.508143401],[10.035834964,53.508276405]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de136","icon":"123","isBlocked":"false","future":false,"extent":"51.43180409113053,7.53140775868195,51.431736795612984,7.530576090570185","point":"51.43180409113053,7.53140775868195","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Schwerte)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.43180409113053,"long":7.53140775868195},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Abfahrt von der A1: AK Westhofener Kreuz (aus Richtung Schwerte)","","Länge: 0.06 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4.5 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.531407759,51.431804091],[7.5313314,51.431767201],[7.5311912,51.431730401],[7.5310521,51.431711601],[7.5309228,51.431706601],[7.5307939,51.431710101],[7.5305876,51.431734501],[7.530576091,51.431736796]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de134","icon":"123","isBlocked":"false","future":false,"extent":"51.434164540289544,7.531724223218966,51.433982708748026,7.532140961302309","point":"51.434164540289544,7.531724223218966","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.434164540289544,"long":7.531724223218966},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Abfahrt von der A45: AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)","","Länge: 0.04 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4.5 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.531724223,51.43416454],[7.5317561,51.434159501],[7.5319349,51.434107701],[7.5320285,51.434059401],[7.5320987,51.434014701],[7.532140961,51.433982709]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de128","icon":"123","isBlocked":"false","future":false,"extent":"51.42917702541557,7.529432794121831,51.42884594241532,7.5291217858103385","point":"51.42917702541557,7.529432794121831","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Schwerte)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.42917702541557,"long":7.529432794121831},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Auffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Schwerte)","","Länge: 0.04 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.529432794,51.429177025],[7.5293616,51.429104001],[7.529121786,51.428845942]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de126","icon":"123","isBlocked":"false","future":false,"extent":"51.43497206264831,7.532462017802579,51.43460921409227,7.5319264961571255","point":"51.43497206264831,7.532462017802579","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Schwerte)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.43497206264831,"long":7.532462017802579},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Abfahrt von der A1: AK Westhofener Kreuz (aus Richtung Schwerte)","","Länge: 0.06 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.532462018,51.434972063],[7.5324097,51.434925601],[7.532262,51.434818701],[7.532094,51.434703301],[7.531926496,51.434609214]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de114","icon":"123","isBlocked":"false","future":false,"extent":"51.43081011246132,7.533282141321935,51.431216090086885,7.532363047303473","point":"51.43081011246132,7.533282141321935","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Lennhof)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.43081011246132,"long":7.533282141321935},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Auffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Lennhof)","","Länge: 0.08 km | Max. 40 km/h | Maximale Durchfahrtsbreite: 4.5 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.533282141,51.430810112],[7.532775,51.430988101],[7.5326056,51.431059001],[7.5324874,51.431124001],[7.5323902,51.431189101],[7.532363047,51.43121609]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de112","icon":"123","isBlocked":"false","future":false,"extent":"51.43358365013835,7.533664537434759,51.432996650309676,7.534694236827098","point":"51.43358365013835,7.533664537434759","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.43358365013835,"long":7.533664537434759},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Auffahrt auf die A45: AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)","","Länge: 0.11 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4.5 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.533664537,51.43358365],[7.5337182,51.433587101],[7.5338245,51.433590101],[7.5339589,51.433580301],[7.534094,51.433553901],[7.5341967,51.433526301],[7.5342937,51.433487401],[7.5344014,51.433432101],[7.5344712,51.433381901],[7.534552,51.433326301],[7.5346194,51.433254601],[7.5346552,51.433199401],[7.5346764,51.433134101],[7.5346981,51.433051201],[7.534694237,51.43299665]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de104","icon":"123","isBlocked":"false","future":false,"extent":"51.43048147399592,7.531816606999569,51.43063483214251,7.532771723878062","point":"51.43048147399592,7.531816606999569","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Lennhof)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.43048147399592,"long":7.531816606999569},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Abfahrt von der A1: AK Westhofener Kreuz (aus Richtung Lennhof)","","Länge: 0.07 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4.5 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.531816607,51.430481474],[7.5318572,51.430498701],[7.5320147,51.430550801],[7.5321698,51.430585801],[7.5323002,51.430607601],[7.5324388,51.430625501],[7.5325712,51.430633901],[7.5327219,51.430636701],[7.532771724,51.430634832]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de102","icon":"123","isBlocked":"false","future":false,"extent":"51.428578453686384,7.529398790884907,51.42882974459922,7.529725222676086","point":"51.428578453686384,7.529398790884907","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Lennhof)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.428578453686384,"long":7.529398790884907},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Abfahrt von der A1: AK Westhofener Kreuz (aus Richtung Lennhof)","","Länge: 0.04 km | Maximale Durchfahrtsbreite: 4.5 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.529398791,51.428578454],[7.5294435,51.428607901],[7.529725223,51.428829745]]}},{"identifier":"2026-043339--vi-bs.2026-08-31_00-00-00-000.devi-zus.2026-08-31_00-00-00-000_003.de1","icon":"123","isBlocked":"false","future":false,"extent":"53.19541469523498,9.28529306741471,53.19354401051509,9.28463728499201","point":"53.19541469523498,9.28529306741471","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" AS Bockel (aus Richtung Bockel)","title":"AS Bockel A1 Auffahrt ","startTimestamp":"2026-08-31T00:00:00+02:00","coordinate":{"lat":53.19541469523498,"long":9.28529306741471},"description":["Zeitraum dieser Bauphase:","Beginn: 31.08.26 um 00:00 Uhr","Ende: 01.10.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.10.26)","","Auffahrt auf die A1: AS Bockel (aus Richtung Bockel)","","Länge: 0.22 km | Maximale Durchfahrtsbreite: 6.5 m","","AS Bockel A1 Auffahrt "],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[9.285293067,53.195414695],[9.2852924,53.195414301],[9.2851788,53.195330001],[9.2850937,53.195246701],[9.285013,53.195164501],[9.2849884,53.195102601],[9.284885,53.194944601],[9.2848481,53.194834901],[9.2848252,53.194714601],[9.2848133,53.194627101],[9.2848185,53.194499401],[9.2848352,53.194371601],[9.2848477,53.194250001],[9.2848465,53.194004201],[9.284786,53.193786201],[9.2847255,53.193676101],[9.2846445,53.193551701],[9.284637285,53.193544011]]}},{"identifier":"2026-045837--vi-fbm.2026-09-14_09-00-00-000_002.de0","icon":"warnkegel","isBlocked":"false","future":true,"extent":"51.60083848220603,7.679816576427236,51.60079484469117,7.681399095007754","point":"51.60083848220603,7.679816576427236","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"SHORT_TERM_ROADWORKS","subtitle":" AK Kamener Kreuz (aus Richtung Kamen/Bergkamen)","title":"A1 - Baustelleneinrichtung - AkD 45837","coordinate":{"lat":51.60083848220603,"long":7.679816576427236},"description":["Die Baustelle ist zu folgenden Zeiträumen gültig:","14.09.26 von 09:00 bis 16:00 Uhr","15.09.26 von 09:00 bis 16:00 Uhr","16.09.26 von 09:00 bis 16:00 Uhr","","Abfahrt von der A2: AK Kamener Kreuz (aus Richtung Kamen/Bergkamen)","","Länge: 0.11 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Baustelleneinrichtung - AkD 45837"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.679816576,51.600838482],[7.6800747,51.600826001],[7.6806615,51.600800101],[7.681399095,51.600794845]]}},{"identifier":"2026-036079--vi-bs.2026-07-04_00-00-00-000_004.de0","icon":"123","isBlocked":"false","future":false,"extent":"49.85592196126527,6.800388689647443,49.85741221243466,6.802915513928907","point":"49.85592196126527,6.800388689647443","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","BORDER_RIGHT","BREAKDOWN_LANE"]},"display_type":"ROADWORKS","subtitle":" Trier -> Köln/Koblenz","title":"A1 von Groß Ippener (AS) Akute Verkehrsgefährdung","startTimestamp":"2026-07-04T00:00:00+02:00","coordinate":{"lat":49.85592196126527,"long":6.800388689647443},"description":["Zeitraum dieser Bauphase:","Beginn: 04.07.26 um 00:00 Uhr","Ende: 01.11.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.11.26)","","Von A1: Trier -> Köln/Koblenz, zwischen 3.4 km hinter AS Schweich und Rivenich nach Abfahrt von der A1: AS Föhren (aus Richtung Schweich)","","Länge: 0.25 km | Maximale Durchfahrtsbreite: 3.75 m","","A1 von Groß Ippener (AS) Akute Verkehrsgefährdung"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.80038869,49.855921961],[6.800397,49.855928201],[6.800719,49.856170001],[6.8008412,49.856260501],[6.8019858,49.857180801],[6.8023985,49.857362601],[6.8024639,49.857383801],[6.8025222,49.857398401],[6.8025914,49.857412001],[6.8026643,49.857420301],[6.8027443,49.857422401],[6.8028199,49.857421101],[6.802883,49.857416501],[6.802915514,49.857412212]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de155","icon":"123","isBlocked":"false","future":true,"extent":"51.526064892427755,7.6587703454363725,51.52101866597074,7.657265517067844","point":"51.526064892427755,7.6587703454363725","startLcPosition":"1000","impact":{"symbols":["SEPARATE","CLOSED","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Unna (aus Richtung Kamen-Zentrum)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.526064892427755,"long":7.6587703454363725},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der A1: AS Unna (aus Richtung Kamen-Zentrum)","","Länge: 0.57 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.658770345,51.526064892],[7.6585413,51.525069001],[7.6582441,51.523742801],[7.6580498,51.523000401],[7.6579071,51.522646401],[7.6575484,51.521660301],[7.657265517,51.521018666]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de119","icon":"123","isBlocked":"false","future":false,"extent":"51.524436952405246,7.658399656508735,51.52107934578644,7.657292269134926","point":"51.524436952405246,7.658399656508735","startLcPosition":"1000","impact":{"symbols":["SEPARATE","CLOSED","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":"","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.524436952405246,"long":7.658399656508735},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der B1Abschnitt09Werl-DO","","Länge: 0.38 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.658399657,51.524436952],[7.6582441,51.523742801],[7.6580498,51.523000401],[7.6579071,51.522646401],[7.6575484,51.521660301],[7.657292269,51.521079346]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de117","icon":"123","isBlocked":"false","future":false,"extent":"51.52805270789929,7.6592031594792385,51.52671787228393,7.6589094325588984","point":"51.52805270789929,7.6592031594792385","startLcPosition":"1000","impact":{"symbols":["SEPARATE","CLOSED","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Unna (aus Richtung Kamen-Zentrum)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.52805270789929,"long":7.6592031594792385},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der A1: AS Unna (aus Richtung Kamen-Zentrum)","","Länge: 0.15 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.659203159,51.528052708],[7.6589668,51.526958401],[7.658909433,51.526717872]]}},{"identifier":"2023-004432--vi-bs.2025-01-13_09-00-00-000.devi-zus.2024-11-08_20-00-00-000_004.f.de9","icon":"123","isBlocked":"false","future":false,"extent":"52.339466083138184,8.016633783244142,52.33966188370801,8.018080940109098","point":"52.339466083138184,8.016633783244142","startLcPosition":"1000","impact":{"symbols":["SEPARATE","CLOSED","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":"","title":"A1 - Ersatzneubau BW AS Osnabrück-Nord-B68 - Wallenhorst - AlD 4432","startTimestamp":"2025-01-13T09:00:00+01:00","coordinate":{"lat":52.339466083138184,"long":8.016633783244142},"description":["Zeitraum dieser Bauphase:","Beginn: 13.01.25 um 09:00 Uhr","Ende: 28.10.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.11.27)","","Auffahrt auf die B68","","Länge: 0.1 km | Maximale Durchfahrtsbreite: 3.75 m","","A1 - Ersatzneubau BW AS Osnabrück-Nord-B68 - Wallenhorst - AlD 4432"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.016633783,52.339466083],[8.0166836,52.339491301],[8.0171161,52.339632901],[8.0173086,52.339678101],[8.0174742,52.339703301],[8.0176405,52.339713101],[8.0178014,52.339708201],[8.017965,52.339688601],[8.01808094,52.339661884]]}},{"identifier":"2023-004432--vi-bs.2025-01-13_09-00-00-000.devi-zus.2024-11-08_20-00-00-000_004.f.de7","icon":"123","isBlocked":"false","future":false,"extent":"52.34444467006803,8.023362690625875,52.34410894673065,8.022125484575186","point":"52.34444467006803,8.023362690625875","startLcPosition":"1000","impact":{"symbols":["SEPARATE","CLOSED","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Osnabrück-Nord (aus Richtung Wallenhorster Straße)","title":"A1 - Ersatzneubau BW AS Osnabrück-Nord-B68 - Wallenhorst - AlD 4432","startTimestamp":"2025-01-13T09:00:00+01:00","coordinate":{"lat":52.34444467006803,"long":8.023362690625875},"description":["Zeitraum dieser Bauphase:","Beginn: 13.01.25 um 09:00 Uhr","Ende: 28.10.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.11.27)","","Abfahrt von der A1: AS Osnabrück-Nord (aus Richtung Wallenhorster Straße)","","Länge: 0.1 km | Maximale Durchfahrtsbreite: 3.75 m","","A1 - Ersatzneubau BW AS Osnabrück-Nord-B68 - Wallenhorst - AlD 4432"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.023362691,52.34444467],[8.0233201,52.344416801],[8.0231672,52.344331301],[8.0229991,52.344253001],[8.0228264,52.344194201],[8.0226801,52.344156901],[8.022522,52.344128501],[8.0223569,52.344110601],[8.0221662,52.344106901],[8.022125485,52.344108947]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de116","icon":"123","isBlocked":"false","future":false,"extent":"51.43223270893842,7.5356413794895785,51.434271107645856,7.534059331660882","point":"51.43223270893842,7.5356413794895785","startLcPosition":"1000","impact":{"symbols":["SEPARATE","CLOSED","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Lennhof)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.43223270893842,"long":7.5356413794895785},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Auffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Lennhof)","","Länge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.535641379,51.432232709],[7.5355666,51.432322401],[7.5353204,51.432641601],[7.5346741,51.433468401],[7.5342217,51.434053901],[7.534059332,51.434271108]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de108","icon":"123","isBlocked":"false","future":false,"extent":"51.432204920147534,7.532430908990536,51.432726190624365,7.53265282576295","point":"51.432204920147534,7.532430908990536","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Lennhof)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.432204920147534,"long":7.532430908990536},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Auffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Lennhof)","","Länge: 0.06 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 7 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.532430909,51.43220492],[7.5324517,51.432247101],[7.532652826,51.432726191]]}},{"identifier":"2025-006272--vi-bs.2025-08-15_05-00-00-000.devi-zus.2025-04-02_05-00-00-000.de11","icon":"123","isBlocked":"false","future":false,"extent":"53.039990393640814,8.885922592221437,53.03801809358891,8.88256855751124","point":"53.039990393640814,8.885922592221437","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AS Bremen-Hemelingen (aus Richtung Mahndorfer Marsch)","title":"A1 Brückeninstandsetzung Weserquerung ","startTimestamp":"2025-08-15T05:00:00+02:00","coordinate":{"lat":53.039990393640814,"long":8.885922592221437},"description":["Zeitraum dieser Bauphase:","Beginn: 15.08.25 um 05:00 Uhr","Ende: 01.11.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.01.28)","","Auffahrt auf die A1: AS Bremen-Hemelingen (aus Richtung Mahndorfer Marsch)","","Länge: 0.34 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 Brückeninstandsetzung Weserquerung "],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[8.885922592,53.039990394],[8.8859032,53.039930701],[8.8858182,53.039824201],[8.88572,53.039744801],[8.885539,53.039651701],[8.885298,53.039566601],[8.8851235,53.039495401],[8.8849794,53.039429601],[8.8848189,53.039313101],[8.8847271,53.039190001],[8.8846894,53.039100201],[8.8846705,53.039007601],[8.8846593,53.038901801],[8.8846524,53.038763701],[8.8846228,53.038643001],[8.8845687,53.038558501],[8.8845084,53.038495701],[8.8844542,53.038456501],[8.8843728,53.038411501],[8.8842918,53.038374701],[8.8841806,53.038335501],[8.8839265,53.038259501],[8.8826097,53.038026601],[8.882568558,53.038018094]]}},{"identifier":"2026-013716--vi-bs.2026-09-23_06-00-00-000.devi-zus.2026-08-31_20-00-00-000.de3","icon":"123","isBlocked":"false","future":true,"extent":"53.38586677849083,10.020982325490255,53.38630620782264,10.021019407317226","point":"53.38586677849083,10.020982325490255","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AD Horster Dreieck (aus Richtung Horster Dreieck/A7)","title":"A1, AK Maschen, Bauwerksarbeiten, BW432a","startTimestamp":"2026-09-23T06:00:00+02:00","coordinate":{"lat":53.38586677849083,"long":10.020982325490255},"description":["Zeitraum dieser Bauphase:","Beginn: 23.09.26 um 06:00 Uhr","Ende: 04.11.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 04.11.26)","","Abfahrt von der A1: AD Horster Dreieck (aus Richtung Horster Dreieck/A7)","","Länge: 0.05 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.9 m","","A1, AK Maschen, Bauwerksarbeiten, BW432a"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.020982325,53.385866778],[10.0209905,53.386092101],[10.021019407,53.386306208]]}},{"identifier":"2026-013716--vi-bs.2026-09-23_06-00-00-000.devi-zus.2026-08-31_20-00-00-000.de1","icon":"123","isBlocked":"false","future":true,"extent":"53.38685903678484,10.02031199050014,53.385757965672106,10.019476003467544","point":"53.38685903678484,10.02031199050014","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP","CLOSED"]},"display_type":"ROADWORKS","subtitle":" AD Horster Dreieck (aus Richtung Maschener Kreuz)","title":"A1, AK Maschen, Bauwerksarbeiten, BW432a","startTimestamp":"2026-09-23T06:00:00+02:00","coordinate":{"lat":53.38685903678484,"long":10.02031199050014},"description":["Zeitraum dieser Bauphase:","Beginn: 23.09.26 um 06:00 Uhr","Ende: 04.11.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 04.11.26)","","Auffahrt auf die A1: AD Horster Dreieck (aus Richtung Maschener Kreuz)","","Länge: 0.13 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4 m","","A1, AK Maschen, Bauwerksarbeiten, BW432a"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.020311991,53.386859037],[10.0201479,53.386579101],[10.019937,53.386286501],[10.0197234,53.386022701],[10.0196025,53.385886701],[10.019476003,53.385757966]]}},{"identifier":"2025-038997--vi-bs.2026-04-12_00-00-00-000.devi-zus.2026-02-23_07-00-00-000.de25","icon":"123","isBlocked":"false","future":false,"extent":"53.38068682008993,10.01666252288003,53.378669803472526,10.017790847729481","point":"53.38068682008993,10.01666252288003","startLcPosition":"1000","impact":{"symbols":["SEPARATE","CLOSED","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AD Horster Dreieck (aus Richtung Horster Dreieck/A1)","title":"A7, Horster Dreieck bis AS Thieshope, OPA Grundsinstandsetzung km 17,7 bis km 23,5, RiFa H","startTimestamp":"2026-04-12T00:00:00+02:00","coordinate":{"lat":53.38068682008993,"long":10.01666252288003},"description":["Zeitraum dieser Bauphase:","Beginn: 12.04.26 um 00:00 Uhr","Ende: 28.11.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 28.11.26)","","Auffahrt auf die A7: AD Horster Dreieck (aus Richtung Horster Dreieck/A1)","","Länge: 0.24 km | Maximale Durchfahrtsbreite: 4.5 m","","A7, Horster Dreieck bis AS Thieshope, OPA Grundsinstandsetzung km 17,7 bis km 23,5, RiFa H"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[10.016662523,53.38068682],[10.0167068,53.380506501],[10.0169102,53.379966401],[10.0171133,53.379581701],[10.0173561,53.379213301],[10.017790848,53.378669803]]}},{"identifier":"2024-004899--vi-bs.2024-02-04_16-00-00-000.devi-zus.2024-02-01_15-00-00-000.de3","icon":"123","isBlocked":"false","future":false,"extent":"51.0416823837017,7.00635437587602,51.0429054895437,7.006286885249943","point":"51.0416823837017,7.00635437587602","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Leverkusen (aus Richtung Burscheid)","title":"AK Leverkusen","startTimestamp":"2024-02-04T16:00:00+01:00","coordinate":{"lat":51.0416823837017,"long":7.00635437587602},"description":["Zeitraum dieser Bauphase:","Beginn: 04.02.24 um 16:00 Uhr","Ende: 31.12.27 um 05:00 Uhr","(Ende der Gesamtmaßnahme: 31.12.27)","","Abfahrt von der A1: AK Leverkusen (aus Richtung Burscheid)","","Länge: 0.25 km | Maximale Durchfahrtsbreite: 3.25 m","","AK Leverkusen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.006354376,51.041682384],[7.0062864,51.041657201],[7.0062096,51.041635501],[7.0061284,51.041618201],[7.006052,51.041616001],[7.0059668,51.041612701],[7.0058788,51.041619501],[7.0057938,51.041632101],[7.0057227,51.041644801],[7.0056507,51.041664701],[7.0055568,51.041699101],[7.0054477,51.041749001],[7.0053834,51.041789801],[7.0053305,51.041832801],[7.005252,51.041920501],[7.0051956,51.042023601],[7.0051803,51.042086201],[7.005182,51.042175901],[7.0052084,51.042266601],[7.0052634,51.042384301],[7.0053539,51.042531401],[7.0054861,51.042670701],[7.0056326,51.042826701],[7.0057234,51.042880001],[7.0057951,51.042907301],[7.0058622,51.042932401],[7.0059728,51.042948501],[7.0060332,51.042950501],[7.0061322,51.042941301],[7.0062176,51.042927701],[7.006286885,51.04290549]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de165","icon":"123","isBlocked":"false","future":true,"extent":"51.52380678939381,7.658824591311105,51.52521163446166,7.659149627460019","point":"51.52380678939381,7.658824591311105","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Unna (aus Richtung Dortmund/Unna)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.52380678939381,"long":7.658824591311105},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Auffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)","","Länge: 0.16 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.658824591,51.523806789],[7.6590778,51.524865101],[7.659149627,51.525211634]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de163","icon":"123","isBlocked":"false","future":true,"extent":"51.528513456440436,7.661033837547566,51.529381098639284,7.660227882805334","point":"51.528513456440436,7.661033837547566","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Unna (aus Richtung Dortmund/Unna)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.528513456440436,"long":7.661033837547566},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Auffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)","","Länge: 0.12 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.661033838,51.528513456],[7.6609004,51.528542101],[7.6606938,51.528614801],[7.6605377,51.528699401],[7.6604068,51.528821101],[7.6603288,51.528935501],[7.6602725,51.529090401],[7.6602312,51.529336001],[7.660227883,51.529381099]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de161","icon":"123","isBlocked":"false","future":true,"extent":"51.527512643575314,7.659786716788224,51.52834583917273,7.661424105873039","point":"51.527512643575314,7.659786716788224","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Dortmund/Unna (aus Richtung Unna-Ost)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.527512643575314,"long":7.659786716788224},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)","","Länge: 0.16 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.659786717,51.527512644],[7.659844,51.527604101],[7.6600033,51.527790801],[7.6601331,51.527914001],[7.6602954,51.528045601],[7.6605403,51.528199201],[7.6607721,51.528289901],[7.6610404,51.528351201],[7.6612807,51.528363601],[7.661424106,51.528345839]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de159","icon":"123","isBlocked":"false","future":true,"extent":"51.52243629833651,7.661983000399999,51.52418487811272,7.659266823329309","point":"51.52243629833651,7.661983000399999","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Dortmund/Unna (aus Richtung Unna-Ost)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.52243629833651,"long":7.661983000399999},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)","","Länge: 0.28 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.661983,51.522436298],[7.6618388,51.522497501],[7.6616342,51.522637401],[7.6615188,51.522730901],[7.6613707,51.522865001],[7.6609424,51.523479701],[7.6607723,51.523625701],[7.6605871,51.523730201],[7.6603232,51.523829001],[7.660002,51.523892301],[7.6596458,51.523973301],[7.6594075,51.524075601],[7.659266823,51.524184878]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de157","icon":"123","isBlocked":"false","future":true,"extent":"51.52190893619229,7.659413423443093,51.521389528748486,7.658241850766716","point":"51.52190893619229,7.659413423443093","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Unna (aus Richtung Dortmund/Unna)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.52190893619229,"long":7.659413423443093},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Auffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)","","Länge: 0.21 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.659413423,51.521908936],[7.6594469,51.521894501],[7.6595906,51.521809401],[7.6596651,51.521724501],[7.6597201,51.521629701],[7.6597499,51.521515401],[7.6597279,51.521418701],[7.6596853,51.521321901],[7.6596227,51.521243801],[7.659553,51.521187501],[7.6594437,51.521123601],[7.6592894,51.521066301],[7.6591391,51.521033701],[7.6589708,51.521025601],[7.6587905,51.521034701],[7.6586346,51.521072801],[7.6584874,51.521123601],[7.6583768,51.521190201],[7.658299,51.521270201],[7.6582466,51.521370501],[7.658241851,51.521389529]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de153","icon":"123","isBlocked":"false","future":true,"extent":"51.52118799943189,7.657037739894617,51.52205749968103,7.656334475189731","point":"51.52118799943189,7.657037739894617","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":"","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.52118799943189,"long":7.657037739894617},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der B1Abschnitt09Werl-DO","","Länge: 0.18 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.65703774,51.521187999],[7.6568238,51.521123301],[7.6565265,51.521114801],[7.6562661,51.521165401],[7.6560755,51.521255901],[7.6559258,51.521376201],[7.6558384,51.521516201],[7.655827,51.521636101],[7.6558613,51.521767901],[7.6559557,51.521873501],[7.6560806,51.521961201],[7.65626,51.522041301],[7.656334475,51.5220575]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de151","icon":"123","isBlocked":"false","future":true,"extent":"51.52265863635305,7.656637595193168,51.52347553130216,7.657867549856262","point":"51.52265863635305,7.656637595193168","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Dortmund/Unna (aus Richtung Unna-Ost)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.52265863635305,"long":7.656637595193168},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)","","Länge: 0.23 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.656637595,51.522658636],[7.6566291,51.522661201],[7.6565098,51.522715501],[7.6564116,51.522780601],[7.6563257,51.522851601],[7.6562306,51.522976501],[7.6561953,51.523200601],[7.6562706,51.523388701],[7.6563797,51.523495301],[7.6564952,51.523581501],[7.6566834,51.523660101],[7.6569292,51.523711501],[7.6571564,51.523728701],[7.6573565,51.523709501],[7.6575263,51.523670801],[7.6576853,51.523612901],[7.6578076,51.523532301],[7.65786755,51.523475531]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de149","icon":"123","isBlocked":"false","future":true,"extent":"51.524511703447295,7.658178051167977,51.52285830643096,7.655765926181754","point":"51.524511703447295,7.658178051167977","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":"","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.524511703447295,"long":7.658178051167977},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Zufahrtsstraße B1Abschnitt09Werl-DO","","Länge: 0.26 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.658178051,51.524511703],[7.6580854,51.524403201],[7.6578464,51.524241201],[7.6575034,51.524076201],[7.6571004,51.523942401],[7.6568238,51.523858201],[7.6565185,51.523755801],[7.6563249,51.523650701],[7.656175,51.523547201],[7.6560601,51.523422201],[7.6558954,51.523059801],[7.6557771,51.522870401],[7.655765926,51.522858306]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de147","icon":"123","isBlocked":"false","future":true,"extent":"51.5276312009855,7.657923962036867,51.52732031985499,7.658815901710162","point":"51.5276312009855,7.657923962036867","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":"","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.5276312009855,"long":7.657923962036867},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Zufahrtsstraße B1Abschnitt09Werl-DO","","Länge: 0.08 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.657923962,51.527631201],[7.6581479,51.527631201],[7.6584046,51.527594001],[7.6585595,51.527524301],[7.6587531,51.527409001],[7.658815902,51.52732032]]}},{"identifier":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de145","icon":"123","isBlocked":"false","future":true,"extent":"51.528629318809365,7.659048306824232,51.52795965418849,7.658043712836817","point":"51.528629318809365,7.659048306824232","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Unna (aus Richtung Kamen-Zentrum)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-09-17T20:00:00+02:00","coordinate":{"lat":51.528629318809365,"long":7.659048306824232},"description":["Zeitraum dieser Bauphase:","Beginn: 17.09.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der A1: AS Unna (aus Richtung Kamen-Zentrum)","","Länge: 0.1 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.659048307,51.528629319],[7.65886,51.528429001],[7.6586489,51.528260801],[7.6584001,51.528113901],[7.6580902,51.527976401],[7.658043713,51.527959654]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de137","icon":"123","isBlocked":"false","future":false,"extent":"51.52045793852787,7.657985616904783,51.52127993007288,7.659893535885611","point":"51.52045793852787,7.657985616904783","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Dortmund/Unna (in Richtung Unna-Ost)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.52045793852787,"long":7.657985616904783},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Auffahrt auf die A44: AK Dortmund/Unna (in Richtung Unna-Ost)","","Länge: 0.16 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.657985617,51.520457939],[7.6582466,51.520596001],[7.6585864,51.520713001],[7.6591459,51.520852801],[7.6595101,51.520988501],[7.6597625,51.521133501],[7.659893536,51.52127993]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de135","icon":"123","isBlocked":"false","future":false,"extent":"51.52118411722717,7.6570249024728145,51.522051601742284,7.656307358857995","point":"51.52118411722717,7.6570249024728145","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":"","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.52118411722717,"long":7.6570249024728145},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der B1Abschnitt09Werl-DO","","Länge: 0.18 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.657024902,51.521184117],[7.6568238,51.521123301],[7.6565265,51.521114801],[7.6562661,51.521165401],[7.6560755,51.521255901],[7.6559258,51.521376201],[7.6558384,51.521516201],[7.655827,51.521636101],[7.6558613,51.521767901],[7.6559557,51.521873501],[7.6560806,51.521961201],[7.65626,51.522041301],[7.656307359,51.522051602]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de133","icon":"123","isBlocked":"false","future":false,"extent":"51.52266864249473,7.656612750524089,51.52349053036504,7.657851710566097","point":"51.52266864249473,7.656612750524089","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Dortmund/Unna (aus Richtung Unna-Ost)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.52266864249473,"long":7.656612750524089},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)","","Länge: 0.22 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.656612751,51.522668642],[7.6565098,51.522715501],[7.6564116,51.522780601],[7.6563257,51.522851601],[7.6562306,51.522976501],[7.6561953,51.523200601],[7.6562706,51.523388701],[7.6563797,51.523495301],[7.6564952,51.523581501],[7.6566834,51.523660101],[7.6569292,51.523711501],[7.6571564,51.523728701],[7.6573565,51.523709501],[7.6575263,51.523670801],[7.6576853,51.523612901],[7.6578076,51.523532301],[7.657851711,51.52349053]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de131","icon":"123","isBlocked":"false","future":false,"extent":"51.528629318809365,7.659048306824232,51.527964143610006,7.6580561749798175","point":"51.528629318809365,7.659048306824232","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Unna (aus Richtung Kamen-Zentrum)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.528629318809365,"long":7.659048306824232},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der A1: AS Unna (aus Richtung Kamen-Zentrum)","","Länge: 0.1 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.659048307,51.528629319],[7.65886,51.528429001],[7.6586489,51.528260801],[7.6584001,51.528113901],[7.6580902,51.527976401],[7.658056175,51.527964144]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de115","icon":"123","isBlocked":"false","future":false,"extent":"51.52463063442813,7.658279607860961,51.52259927158056,7.655332444562705","point":"51.52463063442813,7.658279607860961","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":"","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.52463063442813,"long":7.658279607860961},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Zufahrtsstraße B1Abschnitt09Werl-DO","","Länge: 0.32 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.658279608,51.524630634],[7.6580854,51.524403201],[7.6578464,51.524241201],[7.6575034,51.524076201],[7.6571004,51.523942401],[7.6568238,51.523858201],[7.6565185,51.523755801],[7.6563249,51.523650701],[7.656175,51.523547201],[7.6560601,51.523422201],[7.6558954,51.523059801],[7.6557771,51.522870401],[7.6556521,51.522735101],[7.6554477,51.522639801],[7.655332445,51.522599272]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de113","icon":"123","isBlocked":"false","future":false,"extent":"51.526471328324014,7.655895591767716,51.52732854034548,7.658810080176864","point":"51.526471328324014,7.655895591767716","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":"","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.526471328324014,"long":7.655895591767716},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Zufahrtsstraße B1Abschnitt09Werl-DO","","Länge: 0.3 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.655895592,51.526471328],[7.6558411,51.526573901],[7.6558066,51.526684601],[7.6558277,51.526833801],[7.6558802,51.526933101],[7.6560169,51.527069301],[7.6562451,51.527220801],[7.6564641,51.527319801],[7.6567893,51.527438801],[7.6570977,51.527526101],[7.6574428,51.527589201],[7.6578692,51.527631201],[7.6581479,51.527631201],[7.6584046,51.527594001],[7.6585595,51.527524301],[7.6587531,51.527409001],[7.65881008,51.52732854]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de109","icon":"123","isBlocked":"false","future":false,"extent":"51.52028602391985,7.657561507552269,51.5256039525932,7.659230946160217","point":"51.52028602391985,7.657561507552269","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Unna (aus Richtung Dortmund/Unna)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.52028602391985,"long":7.657561507552269},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Auffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)","","Länge: 0.6 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.657561508,51.520286024],[7.6576086,51.520390901],[7.6582729,51.521997101],[7.6586281,51.522985501],[7.6590778,51.524865101],[7.659230946,51.525603953]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de107","icon":"123","isBlocked":"false","future":false,"extent":"51.521965127676644,7.659282205119793,51.521365399757826,7.6582492650261145","point":"51.521965127676644,7.659282205119793","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Unna (aus Richtung Dortmund/Unna)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.521965127676644,"long":7.659282205119793},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Auffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)","","Länge: 0.22 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.659282205,51.521965128],[7.6592841,51.521964701],[7.6594469,51.521894501],[7.6595906,51.521809401],[7.6596651,51.521724501],[7.6597201,51.521629701],[7.6597499,51.521515401],[7.6597279,51.521418701],[7.6596853,51.521321901],[7.6596227,51.521243801],[7.659553,51.521187501],[7.6594437,51.521123601],[7.6592894,51.521066301],[7.6591391,51.521033701],[7.6589708,51.521025601],[7.6587905,51.521034701],[7.6586346,51.521072801],[7.6584874,51.521123601],[7.6583768,51.521190201],[7.658299,51.521270201],[7.658249265,51.5213654]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de105","icon":"123","isBlocked":"false","future":false,"extent":"51.52344755950193,7.658938282755185,51.52249897875851,7.6603233725150695","point":"51.52344755950193,7.658938282755185","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":"","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.52344755950193,"long":7.658938282755185},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der B1Abschnitt09Werl-DO","","Länge: 0.27 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.658938283,51.52344756],[7.659018,51.523516201],[7.6591726,51.523607601],[7.659373,51.523682801],[7.6595189,51.523716201],[7.6597123,51.523744301],[7.6599196,51.523750101],[7.66011,51.523730801],[7.6602931,51.523692201],[7.6604384,51.523639601],[7.6606471,51.523525501],[7.6607839,51.523402801],[7.6608721,51.523263001],[7.6609099,51.523137501],[7.6609097,51.523022601],[7.6608698,51.522895301],[7.6607882,51.522767701],[7.6606509,51.522648701],[7.6605335,51.522573901],[7.6603688,51.522512601],[7.660323373,51.522498979]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de103","icon":"123","isBlocked":"false","future":false,"extent":"51.527529391531615,7.659797206650032,51.52834583917273,7.661424105873039","point":"51.527529391531615,7.659797206650032","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Dortmund/Unna (aus Richtung Unna-Ost)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.527529391531615,"long":7.659797206650032},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)","","Länge: 0.16 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.659797207,51.527529392],[7.659844,51.527604101],[7.6600033,51.527790801],[7.6601331,51.527914001],[7.6602954,51.528045601],[7.6605403,51.528199201],[7.6607721,51.528289901],[7.6610404,51.528351201],[7.6612807,51.528363601],[7.661424106,51.528345839]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de101","icon":"123","isBlocked":"false","future":false,"extent":"51.527686755377204,7.662480766791669,51.52917483526608,7.660258301608271","point":"51.527686755377204,7.662480766791669","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Unna (aus Richtung Dortmund/Unna)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.527686755377204,"long":7.662480766791669},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Auffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)","","Länge: 0.24 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.662480767,51.527686755],[7.6623193,51.527920501],[7.6621435,51.528129701],[7.6619635,51.528255201],[7.6618172,51.528324601],[7.6616271,51.528386101],[7.6609004,51.528542101],[7.6606938,51.528614801],[7.6605377,51.528699401],[7.6604068,51.528821101],[7.6603288,51.528935501],[7.6602725,51.529090401],[7.660258302,51.529174835]]}},{"identifier":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de99","icon":"123","isBlocked":"false","future":false,"extent":"51.52248174068246,7.661875933051564,51.52417786943827,7.659275845889587","point":"51.52248174068246,7.661875933051564","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Dortmund/Unna (aus Richtung Unna-Ost)","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","startTimestamp":"2026-08-19T05:00:00+02:00","coordinate":{"lat":51.52248174068246,"long":7.661875933051564},"description":["Zeitraum dieser Bauphase:","Beginn: 19.08.26 um 05:00 Uhr","Ende: 17.09.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 25.11.28)","","Abfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)","","Länge: 0.27 km | Maximale Durchfahrtsbreite: 3.5 m","","A1 - Umbau AK Dortmund-Unna - AlD 5011"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.661875933,51.522481741],[7.6618388,51.522497501],[7.6616342,51.522637401],[7.6615188,51.522730901],[7.6613707,51.522865001],[7.6609424,51.523479701],[7.6607723,51.523625701],[7.6605871,51.523730201],[7.6603232,51.523829001],[7.660002,51.523892301],[7.6596458,51.523973301],[7.6594075,51.524075601],[7.659275846,51.524177869]]}},{"identifier":"2023-004481--vi-bs.2026-07-09_05-00-00-000.devi-zus.2025-01-20_19-00-00-000.f.de25","icon":"123","isBlocked":"false","future":false,"extent":"51.69685942461946,7.667153519445286,51.697299466402626,7.6673870493958685","point":"51.69685942461946,7.667153519445286","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Hamm-Bockum/Werne (aus Richtung An der Landwehr)","title":"A1 - Ersatzneubau BW Nordlippestraße - AlD 4481","startTimestamp":"2026-07-09T05:00:00+02:00","coordinate":{"lat":51.69685942461946,"long":7.667153519445286},"description":["Zeitraum dieser Bauphase:","Beginn: 09.07.26 um 05:00 Uhr","Ende: 15.12.26 um 05:00 Uhr","(Ende der Gesamtmaßnahme: 22.12.26)","","Abfahrt von der A1: AS Hamm-Bockum/Werne (aus Richtung An der Landwehr)","","Länge: 0.05 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Ersatzneubau BW Nordlippestraße - AlD 4481"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.667153519,51.696859425],[7.6671495,51.696902501],[7.667164,51.697013401],[7.6672065,51.697126801],[7.6672678,51.697216001],[7.6673593,51.697285101],[7.667387049,51.697299466]]}},{"identifier":"2023-004481--vi-bs.2026-07-09_05-00-00-000.devi-zus.2025-01-20_19-00-00-000.f.de23","icon":"123","isBlocked":"false","future":false,"extent":"51.694767082035284,7.6678321126897835,51.69432266158393,7.667674001567991","point":"51.694767082035284,7.6678321126897835","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Hamm-Bockum/Werne (aus Richtung Hasenkämpe)","title":"A1 - Ersatzneubau BW Nordlippestraße - AlD 4481","startTimestamp":"2026-07-09T05:00:00+02:00","coordinate":{"lat":51.694767082035284,"long":7.6678321126897835},"description":["Zeitraum dieser Bauphase:","Beginn: 09.07.26 um 05:00 Uhr","Ende: 15.12.26 um 05:00 Uhr","(Ende der Gesamtmaßnahme: 22.12.26)","","Abfahrt von der A1: AS Hamm-Bockum/Werne (aus Richtung Hasenkämpe)","","Länge: 0.05 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Ersatzneubau BW Nordlippestraße - AlD 4481"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.667832113,51.694767082],[7.6678393,51.694712401],[7.6678418,51.694616801],[7.6678255,51.694531201],[7.66779,51.694446001],[7.66773,51.694369101],[7.667674002,51.694322662]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de110","icon":"123","isBlocked":"false","future":false,"extent":"51.43390926867453,7.53294307848804,51.43470406828522,7.533179462425459","point":"51.43390926867453,7.53294307848804","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Lennhof) nach A1","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.43390926867453,"long":7.53294307848804},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Von Auffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Lennhof) nach A1: Köln -> Dortmund, zwischen AK Westhofener Kreuz und 3.3 km vor AS Schwerte","","Länge: 0.09 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.532943078,51.433909269],[7.5329468,51.434058501],[7.533179462,51.434704068]]}},{"identifier":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de106","icon":"123","isBlocked":"false","future":false,"extent":"51.43055314555193,7.531459338220203,51.431143072376116,7.5318489816004","point":"51.43055314555193,7.531459338220203","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AK Westhofener Kreuz (aus Richtung Lennhof)","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","startTimestamp":"2026-08-28T21:00:00+02:00","coordinate":{"lat":51.43055314555193,"long":7.531459338220203},"description":["Zeitraum dieser Bauphase:","Beginn: 28.08.26 um 21:00 Uhr","Ende: 30.09.26 um 21:00 Uhr","(Ende der Gesamtmaßnahme: 09.01.30)","","Abfahrt von der A1: AK Westhofener Kreuz (aus Richtung Lennhof)","","Länge: 0.07 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4 m","","A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.531459338,51.430553146],[7.5317116,51.430921601],[7.531848982,51.431143072]]}},{"identifier":"2026-034771--vi-bs.2026-08-15_00-00-00-000.devi-zus.2026-08-15_00-00-00-000.de7","icon":"123","isBlocked":"false","future":false,"extent":"49.812264651897564,6.757286524127881,49.81257113691812,6.753981328159483","point":"49.812264651897564,6.757286524127881","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AD Moseltal (in Richtung Schweich) nach A602","title":"A602 Arbeiten an Schutzeinrichtungen","startTimestamp":"2026-08-15T00:00:00+02:00","coordinate":{"lat":49.812264651897564,"long":6.757286524127881},"description":["Zeitraum dieser Bauphase:","Beginn: 15.08.26 um 00:00 Uhr","Ende: 01.12.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.12.26)","","Von Auffahrt auf die A602: AD Moseltal (in Richtung Schweich) nach A602: Longuich -> Trier, zwischen AD Moseltal und 0.7 km vor AS Schweich","","Länge: 0.27 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 3.5 m","","A602 Arbeiten an Schutzeinrichtungen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.757286524,49.812264652],[6.7572559,49.812231001],[6.7571644,49.812144001],[6.757091,49.812090101],[6.7569947,49.812032801],[6.7569025,49.811991801],[6.7568345,49.811963001],[6.7567631,49.811938101],[6.7566796,49.811911601],[6.7565911,49.811888601],[6.7564945,49.811869501],[6.7564072,49.811858101],[6.7563014,49.811847901],[6.7562022,49.811844901],[6.7560773,49.811844201],[6.7559526,49.811854401],[6.7558334,49.811869601],[6.7556818,49.811900301],[6.7555291,49.811943301],[6.7553741,49.811999401],[6.7552594,49.812045801],[6.75513,49.812103201],[6.7549757,49.812176301],[6.754806,49.812219601],[6.7543602,49.812428601],[6.7541443,49.812514301],[6.753981328,49.812571137]]}},{"identifier":"2026-034771--vi-bs.2026-08-15_00-00-00-000.devi-zus.2026-08-15_00-00-00-000.de5","icon":"123","isBlocked":"false","future":false,"extent":"49.80431379845844,6.760217650164019,49.8063395871453,6.761411063591094","point":"49.80431379845844,6.760217650164019","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AD Moseltal (aus Richtung Rioler Wald)","title":"A602 Arbeiten an Schutzeinrichtungen","startTimestamp":"2026-08-15T00:00:00+02:00","coordinate":{"lat":49.80431379845844,"long":6.760217650164019},"description":["Zeitraum dieser Bauphase:","Beginn: 15.08.26 um 00:00 Uhr","Ende: 01.12.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.12.26)","","Abfahrt von der A1: AD Moseltal (aus Richtung Rioler Wald)","","Länge: 0.26 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 3.75 m","","A602 Arbeiten an Schutzeinrichtungen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[6.76021765,49.804313798],[6.7602114,49.804322601],[6.7601538,49.804423801],[6.7601141,49.804523801],[6.7600767,49.804631301],[6.7600707,49.804740601],[6.7600653,49.804810701],[6.7600693,49.804887801],[6.7600826,49.804967601],[6.760119,49.805079401],[6.7601826,49.805218901],[6.7602561,49.805349801],[6.7603261,49.805471201],[6.7603896,49.805549601],[6.7604449,49.805617901],[6.7605354,49.805718501],[6.7606575,49.805815801],[6.7611725,49.806162901],[6.761354,49.806288801],[6.761411064,49.806339587]]}},{"identifier":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de23","icon":"123","isBlocked":"false","future":false,"extent":"51.650880732778326,7.684272599389587,51.65154750995065,7.6848649579067105","point":"51.650880732778326,7.684272599389587","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Hamm/Bergkamen (aus Richtung Haus Reck)","title":"A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","startTimestamp":"2026-08-31T20:00:00+02:00","coordinate":{"lat":51.650880732778326,"long":7.684272599389587},"description":["Zeitraum dieser Bauphase:","Beginn: 31.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 15.01.27)","","Abfahrt von der A1: AS Hamm/Bergkamen (aus Richtung Haus Reck)","","Länge: 0.09 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.684272599,51.650880733],[7.6843067,51.650972701],[7.684395,51.651124401],[7.684477,51.651226701],[7.6846222,51.651364001],[7.6847623,51.651481401],[7.684864958,51.65154751]]}},{"identifier":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de21","icon":"123","isBlocked":"false","future":false,"extent":"51.651904768115706,7.68487335719406,51.65210742229947,7.683999655593876","point":"51.651904768115706,7.68487335719406","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Hamm/Bergkamen (aus Richtung Haus Reck)","title":"A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","startTimestamp":"2026-08-31T20:00:00+02:00","coordinate":{"lat":51.651904768115706,"long":7.68487335719406},"description":["Zeitraum dieser Bauphase:","Beginn: 31.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 15.01.27)","","Auffahrt auf die A1: AS Hamm/Bergkamen (aus Richtung Haus Reck)","","Länge: 0.07 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.684873357,51.651904768],[7.6848295,51.651896701],[7.6846978,51.651882001],[7.6845477,51.651880601],[7.6844143,51.651898101],[7.6842698,51.651936401],[7.6841261,51.652005101],[7.6840234,51.652078601],[7.683999656,51.652107422]]}},{"identifier":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de19","icon":"123","isBlocked":"false","future":false,"extent":"51.6542224803139,7.681854554334097,51.65409721483845,7.683126810125234","point":"51.6542224803139,7.681854554334097","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Hamm/Bergkamen (aus Richtung Fuchseggen)","title":"A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","startTimestamp":"2026-08-31T20:00:00+02:00","coordinate":{"lat":51.6542224803139,"long":7.681854554334097},"description":["Zeitraum dieser Bauphase:","Beginn: 31.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 15.01.27)","","Auffahrt auf die A1: AS Hamm/Bergkamen (aus Richtung Fuchseggen)","","Länge: 0.11 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.681854554,51.65422248],[7.6818835,51.654248201],[7.6820167,51.654312201],[7.6821301,51.654350001],[7.6822489,51.654378401],[7.6824192,51.654391301],[7.6825727,51.654379301],[7.6827305,51.654352001],[7.682864,51.654303501],[7.6829517,51.654258601],[7.683031,51.654205101],[7.6831103,51.654123001],[7.68312681,51.654097215]]}},{"identifier":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de17","icon":"123","isBlocked":"false","future":false,"extent":"51.65547194920269,7.682902276512507,51.6545419410947,7.681978468381974","point":"51.65547194920269,7.682902276512507","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Hamm/Bergkamen (aus Richtung Fuchseggen)","title":"A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","startTimestamp":"2026-08-31T20:00:00+02:00","coordinate":{"lat":51.65547194920269,"long":7.682902276512507},"description":["Zeitraum dieser Bauphase:","Beginn: 31.08.26 um 20:00 Uhr","Ende: 05.10.26 um 20:00 Uhr","(Ende der Gesamtmaßnahme: 15.01.27)","","Abfahrt von der A1: AS Hamm/Bergkamen (aus Richtung Fuchseggen)","","Länge: 0.12 km | Maximale Durchfahrtsbreite: 3.25 m","","A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"geometry":{"type":"LineString","coordinates":[[7.682902277,51.655471949],[7.682882,51.655391301],[7.6828249,51.655275001],[7.682732,51.655134501],[7.6826496,51.655031101],[7.6825588,51.654940901],[7.6824046,51.654834401],[7.6822427,51.654714301],[7.6820177,51.654571701],[7.681978468,51.654541941]]}}]}