{"identifier":"2026-054693--vi-bs.2026-11-02_00-00-00-000.de0","icon":"123","isBlocked":"false","future":true,"extent":"50.52938154355463,7.184048085400056,50.545490851392834,7.161877604410517","point":"50.52938154355463,7.184048085400056","startLcPosition":"88","impact":{"lower":"Mühlenberg","upper":"Sinzig","symbols":["SEPARATE","ARROW_UP","ARROW_UP","BORDER_RIGHT","CLOSED"]},"display_type":"ROADWORKS","subtitle":" Koblenz -> Mönchengladbach","title":"A61 | Sinzig - Mühlenberg","startTimestamp":"2026-11-02T00:00:00+01:00","delayTimeValue":null,"abnormalTrafficType":null,"averageSpeed":null,"coordinate":{"lat":50.52938154355463,"long":7.184048085400056},"description":["Zeitraum dieser Bauphase:","Beginn: 02.11.26 um 00:00 Uhr","Ende: 22.11.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 22.11.26)","","A61: Koblenz -> Mönchengladbach, zwischen 0.2 km hinter AD Sinzig und 3.5 km vor Mühlenberg","","Länge: 2.4 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.75 m","","A61 Ahrtalbrücke"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"source":null,"geometry":{"type":"LineString","coordinates":[[7.184048085,50.529381544],[7.1839102,50.529462701],[7.1817758,50.530636101],[7.179588,50.531749301],[7.1772727,50.532965401],[7.175467,50.534041101],[7.1737561,50.535179101],[7.1717437,50.536640801],[7.1706245,50.537458201],[7.1696288,50.538297201],[7.1693063,50.538575501],[7.1676302,50.540118801],[7.161877604,50.545490851]]}}