{"identifier":"2026-055312--vi-bs.2026-10-30_00-00-00-000.de0","icon":"123","isBlocked":"false","future":true,"extent":"49.370369898441844,8.630786902564147,49.371625649725694,8.63191123386944","point":"49.370369898441844,8.630786902564147","startLcPosition":"1000","impact":{"symbols":["SEPARATE","ARROW_UP"]},"display_type":"ROADWORKS","subtitle":" AS Heidelberg/Schwetzingen (aus Richtung Heidelberg)","title":"A5 Abtransport Haufwerk AS Heidelberg_Schwetzingen","startTimestamp":"2026-10-30T00:00:00+01:00","delayTimeValue":null,"abnormalTrafficType":null,"averageSpeed":null,"coordinate":{"lat":49.370369898441844,"long":8.630786902564147},"description":["Zeitraum dieser Bauphase:","Beginn: 30.10.26 um 00:00 Uhr","Ende: 01.12.26 um 00:00 Uhr","(Ende der Gesamtmaßnahme: 01.12.26)","","Auffahrt auf die A5: AS Heidelberg/Schwetzingen (aus Richtung Heidelberg)","","Länge: 0.31 km | Maximale Durchfahrtsbreite: 5.4 m","","A5 Abtransport Haufwerk AS Heidelberg_Schwetzingen"],"routeRecommendation":[],"footer":[],"lorryParkingFeatureIcons":[],"source":null,"geometry":{"type":"LineString","coordinates":[[8.630786903,49.370369898],[8.6307112,49.370364501],[8.6304176,49.370414401],[8.6302862,49.370441301],[8.6301843,49.370474301],[8.6300863,49.370516901],[8.6300176,49.370558601],[8.6299432,49.370615501],[8.6298838,49.370678401],[8.6298447,49.370751501],[8.6298136,49.370850301],[8.6298205,49.370998501],[8.6298889,49.371104501],[8.6299625,49.371177101],[8.6300479,49.371247501],[8.6302099,49.371340301],[8.6305926,49.371507801],[8.630943,49.371662401],[8.6311007,49.371720701],[8.6312102,49.371756501],[8.6313148,49.371779001],[8.6314261,49.371786601],[8.6315326,49.371779701],[8.6316258,49.371766501],[8.6317106,49.371743301],[8.6317931,49.371708901],[8.6318577,49.371669501],[8.631911234,49.37162565]]}}